BLD-Final | 9/4/2015 | 9/4/2015 | 9/4/2015 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Alfredo Phone #: ###-####
|
DOC - Permit Finaled | 9/4/2015 | 9/4/2015 | 9/4/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Blower Door Test Results | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | CANC |
Jim Sly
|
|
|
Trench ... Last time if possible (after 4) please call // Art Phone #: ###-#### Trench for Electr and electr Grounding? advised to obtain Electr permit and insp.
|
BLD-Footing | 4/10/2015 | 4/15/2015 | 4/15/2015 | A | PART |
Jim Sly
|
|
|
Art// pour time is 1pm Phone #: ###-#### Waiting for approval from Strata special insp. Appears ok for now. Cage here......not installed yet.
|
Case Summary (BLD) | | | 3/23/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/19/2015 | | DONE |
|
|
|
|
Telephone call | | | 3/18/2015 | | DONE |
|
|
|
Called and left message to Angela
|
OVERRIDE | | | 3/17/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/17/2015 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 2/9/2015 | | 3/17/2015 | | PASS |
John Menard
|
|
|
1st Review Complete 2/10/2015
|
Routing - Design Review | 3/16/2015 | | 3/17/2015 | | PASS |
Andrea Tuning
|
|
|
Approved per resubmitted plans which included change to fence and landscape.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2015 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 3/17/2015 | | 3/17/2015 | | PASS |
John Menard
|
|
|
|
Permit Ready to Issue | | | 3/17/2015 | | DONE |
Candy A. Nichols
|
|
|
need RP, GC and Rev Cert of Val
|
Routing - Erosion and Sediment | 2/24/2015 | | 2/24/2015 | | PASS |
Evan Jenkins
|
|
|
ESC Waiver Submission is approved. Removal of Existing 70'ft cell tower, and replace with an 80.5'ft tower and building.
|
Routing - Erosion and Sediment | 2/10/2015 | | 2/11/2015 | | FAIL |
Evan Jenkins
|
|
|
ESC Waver Request required for review/approval
|
1st review completed | | | 2/11/2015 | | FAIL |
John Menard
|
|
|
Failed Planning and ESC
|
Routing - FIRE | 2/10/2015 | | 2/10/2015 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - PLAN CHECK | 2/10/2015 | | 2/10/2015 | | PASS |
John Menard
|
|
|
|
Routing - PLANNING | 2/10/2015 | | 2/10/2015 | | FAIL |
Susan Riggs
|
|
|
Design Review approval is required for fencing and landscaping. Other than that, I can approve the plans. I called the applicnt and notified her of the process. She will submit an application on line.
|
Routing - PLANNING Land Div | 2/9/2015 | | 2/10/2015 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 2/10/2015 | | 2/10/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 2/10/2015 | | 2/10/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/9/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/9/2015 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/9/2015 | | DONE |
Christina Prado
|
|
|
|
Pending Assignment by JCM | 2/9/2015 | | 2/9/2015 | | DONE |
John Menard
|
|
|
|
First Notice | 9/4/2015 | 9/4/2015 | | | |
Jim Sly
|
|
|
|
Application received | | 2/6/2015 | | | |
|
|
|
|