BLD-Final | 12/29/2015 | 12/29/2015 | 12/29/2015 | P | PASS |
Jim Storey
|
|
|
Warren Phone #: ###-####
|
DOC - Permit Finaled | 12/29/2015 | 12/29/2015 | 12/29/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/28/2015 | 12/28/2015 | 12/28/2015 | P | FAIL |
Jim Storey
|
|
|
Warren Phone #: ###-#### handrail at adu/ address numbers
|
BLD-Energy code compliance | 9/10/2015 | 9/10/2015 | 9/10/2015 | P | PASS |
Jim Storey
|
|
|
Warren Phone #: ###-####
|
BLD-Framing/Rough-in | 8/27/2015 | 8/27/2015 | 8/27/2015 | P | PASS |
Jim Storey
|
|
|
Warren Phone #: ###-#### need strap
|
Plan Modification Accepted | | | 7/29/2015 | | DONE |
|
|
|
new manual j for garage and house
|
Routing - MECHANICAL | 7/29/2015 | | 7/29/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j for garage and house
|
BLD-Wall Bracing | 7/24/2015 | 7/27/2015 | 7/27/2015 | A | PASS |
Jim Storey
|
|
|
|
BLD-Wall Bracing | 7/24/2015 | 7/27/2015 | 7/27/2015 | A | PASS |
Jim Storey
|
|
|
Shear // Aaron Phone #: ###-####
|
BLD-Energy code compliance | 7/23/2015 | 7/24/2015 | 7/24/2015 | P | FAIL |
Jim Storey
|
|
|
Shear // Aaron Phone #: ###-####
|
BLD-Foundation | 5/22/2015 | 5/22/2015 | 5/22/2015 | P | PASS |
Jim Storey
|
|
|
wall // Aldero Phone #: ###-####
|
PubWorks Subgrade Approval | 5/22/2015 | 5/22/2015 | 5/22/2015 | | DONE |
Jason C. Taylor
|
|
|
*EXTERIOR COLUMN FOOTINGS* A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 5/18/2015 | 5/19/2015 | 5/19/2015 | A | PASS |
Jim Storey
|
|
|
Avarro Phone #: ###-#### 10 am
|
BLD-Footing | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | NR |
Jim Storey
|
|
|
Avarro Phone #: ###-#### defr to am
|
PubWorks Subgrade Approval | 5/7/2015 | 5/7/2015 | 5/7/2015 | | DONE |
Jason C. Taylor
|
|
|
*Strip Footings & Interior Column Pads Only***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 4/28/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/28/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/28/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/28/2015 | | DONE |
|
|
|
Need Revised Value and GC Form 4-28-15 this is a NSFD so GC or rev cert of val needed see app CAN
|
Routing - FIRE | 4/17/2015 | 4/17/2015 | 4/24/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Plan assigned to (AJS) | 3/18/2015 | 3/18/2015 | 4/24/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed SFD
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 4/17/2015 | | 4/21/2015 | | PASS |
David Moser
|
|
|
OK as per CAA15-00046 and CZC15-00076
|
Routing - FIRE | 4/2/2015 | 4/2/2015 | 4/9/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to applicant.
|
Routing - PLAN CHECK | 4/2/2015 | | 4/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 3/20/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan Reviewer's activity | | | 3/20/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
see email in doucments, valuation is based off hillside
|
Routing - PLAN CHECK | 3/19/2015 | | 3/20/2015 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing PW Grading-Hillside | 3/19/2015 | | 3/19/2015 | | PASS |
Jason C. Taylor
|
|
|
No hillside requirements needed. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plan assigned to (JG) | 3/9/2015 | 3/9/2015 | 3/18/2015 | | DEFR |
Javier Guzman
|
|
|
3/25 W L2 Hillside ePlan**
|
Routing - FIRE | 3/11/2015 | 3/11/2015 | 3/16/2015 | | FAIL |
Scott Arellano
|
|
|
(Pending E-plan review techincal issues) - Emailed plan review report to applicant. Attached report to Tidemark case.
|
Routing - MECHANICAL | 3/9/2015 | | 3/12/2015 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 3/11/2015 | | 3/11/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE)
Permit for the construction of a new 3495 sq. ft., two story (first story 2605 sq. ft., second story 890 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 352 sq. ft. of covered patio/porch and a 1664 sq. ft. attached garage per the approved plans, plan review report and any notations
|
Routing - Addressing | 3/9/2015 | | 3/11/2015 | | PASS |
Emily Dixon
|
|
|
Address added for ADU.
|
Routing - PUBLIC WORKS | 3/9/2015 | | 3/10/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/9/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 3/9/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/9/2015 | | DONE |
Christina Prado
|
|
|
|
Routing PW Grading-Hillside | 3/5/2015 | | 3/5/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Intake Approval | | | 3/5/2015 | | FAIL |
|
|
|
Missing Erosion & Sediment Control Narrative, Erosion Plan and Manuls
|
Application received | | | 2/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 10 2015 4:29PM
|
Routing - PLANNING | 3/9/2015 | | | | FAIL |
|
|
|
Garage over 1,000s.f. and the accessory dwelling both need separte planning approvals.
|
Routing - PLANNING | 4/2/2015 | | | | FAIL |
|
|
|
Still needs approval of an ADU
|