Third Notice | | 8/15/2015 | 8/19/2015 | | DONE |
|
|
|
This permit finaled on the web by Penny Dennis
|
Second Notice | | 8/20/2015 | 8/10/2015 | | DONE |
Christina Prado
|
|
|
Mailed 8/11/15
|
First Notice | | 8/2/2015 | 8/10/2015 | | DONE |
|
|
|
Mailed 8/11/15
|
Permanent Occupancy | | | 7/23/2015 | | DONE |
|
|
|
|
BLD-Final | 5/21/2015 | 5/22/2015 | 5/22/2015 | P | PASS |
Jim Sly
|
|
|
Curtis Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Temporary Occupancy | 5/22/2015 | 8/20/2015 | 5/22/2015 | | DONE |
Brittany Hill
|
|
|
|
Print Occupancy Form | | | 5/22/2015 | | DONE |
|
|
|
|
BLD-Conference | 5/20/2015 | 5/20/2015 | 5/21/2015 | P | PASS |
Dave Hannah
|
|
|
Curtis Phone #: ###-#### ok to remove exit signs and door hardwear on doors in storefront in sorage area
|
BLD-Ceiling Grid Inspection | 5/19/2015 | 5/19/2015 | 5/20/2015 | P | PASS |
Dave Hannah
|
|
|
Curtis Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/15/2015 | 5/18/2015 | 5/18/2015 | A | CANC |
Dave Hannah
|
|
|
Per Curtis Phone #: ###-####
|
BLD-Framing/Rough-in | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Dave Hannah
|
|
|
Curtis Phone #: ###-####
|
BLD-Energy code compliance | 4/16/2015 | 4/16/2015 | 4/16/2015 | P | PASS |
Mike Jordan
|
|
|
Curtis Phone #: ###-####
|
BLD-Framing/Rough-in | 4/15/2015 | 4/15/2015 | 4/16/2015 | P | PART |
Dave Hannah
|
|
|
Curtis-partial rough in-2nd insulation--as early PM as possilbe Phone #: ###-#### ok to cover ext walls in t/i and eastwall
|
BLD-Framing/Rough-in | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PASS |
Mike Jordan
|
|
|
exterior perimeter walls ok to insulate. demissing wall seperating warehouse from offices ok. no harlids or ofiice walls or restroom walls ready at this time.
|
BLD-Framing/Rough-in | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | NR |
Mike Jordan
|
|
|
Curtis Phone #: ###-####. Moved to pm.
|
BLD-Framing/Rough-in | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | PART |
Mike Jordan
|
|
|
curtis Phone #: ###-####. fire riser room only.
|
Issue PAID IN FULL permit | | | 3/23/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/23/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/20/2015 | | DONE |
|
|
|
NEED- RP
GC form, and Certificate of Value were email to KRS on 3-20-15
|
Telephone call | | | 3/20/2015 | | DONE |
|
|
|
spoke with Ben- told him we need GC form, Cert of value, and RP- then permit is ready
|
Plan assigned to (CJW) | 2/19/2015 | 2/19/2015 | 3/19/2015 | | PASS |
Carl Westfall
|
|
|
DAMSEL IN DEFENSE - Level 3 TI - ePlanReview (15 days - Mar 10)
|
Routing - PLAN CHECK | 3/18/2015 | | 3/19/2015 | | PASS |
Carl Westfall
|
|
|
|
Routing - FIRE | 3/19/2015 | | 3/19/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2015 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/18/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/19/2015 | | 3/5/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
1st review completed | | | 3/5/2015 | | FAIL |
|
|
|
Failed Building and Fire
|
Plan resubmittals requested | | | 3/5/2015 | | DONE |
|
|
|
|
Routing - FIRE | 2/19/2015 | 2/19/2015 | 2/26/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed architect correction items. Attached report to case.
|
Routing - PLUMBING | 2/19/2015 | | 2/20/2015 | | PASS |
Bill VanDegrift
|
|
|
May require building service protection if not already installed.
|
Routing - Erosion and Sediment | 2/19/2015 | | 2/20/2015 | | PASS |
Andy J. Long
|
|
|
Reference ESC14-00656 for activity at site. No new permit needed. Drop inlet protection and perimeter stormwater controls already installed.
|
Routing - PUBLIC WORKS | 2/19/2015 | | 2/20/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Sewer Rating | 2/20/2015 | | 2/20/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plan Reviewer's activity | | | 2/19/2015 | | DONE |
Jason Blais
|
|
|
Emailed architect to contact ACHD to evaluate if any additional impact fees are due. Written verification to be provided to our Permit Counter prior to the building permit being issued.
|
Routing - Addressing | 2/19/2015 | | 2/19/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - Design Review | 2/19/2015 | | 2/19/2015 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH15-00045
|
Pending Assignment by JCB | 2/19/2015 | | 2/19/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 2/18/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by John Menard and plan review fees paid.
|
Intake Approval | | | 2/12/2015 | | FAIL |
John Menard
|
|
|
Please have the electrical engineer relocate his business information to a different area on the plans. The lower right hand corner of plans submitted for review electronically is required to be left open for the City approval stamp.
|
Application received | | | 2/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 11 2015 3:00PM
|