Permit Information
Permit NumberBLD15-00361
StatusFinaled
Name BARCLAY CONSTRUCTION
Site Address 1220 W IDAHO ST
Project NameIPC Plaza 1 2nd floor remodel
Customer Number 
ePlanReviewYes
Description
(IPC)(2ND FLOOR REMODEL) 2ND FLOOR CORRIDORS ARE DOWNGRADED UNDER THIS PERMIT AT THEY ARE INSTALLING QUICK RESPONSE HEADS THROUGHOUR THE FLOOR. Permit for the Interior remodel of existing second floor office space. Improvements include, but not limited to, new walls and ceilings, finishes, lighting, power/data, and limited mechanical and plumbing. The existing corridors are being downgraded while the fire sprinkler heads are upgraded to quick response. The access floor system is existing. The "Man Trap" door hardware shall meet IBC chapter 10 and 11 requirements. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other7/21/20157/22/20157/22/2015ADONE
DetailsTony Young
Fire ; Life Safety Final
Call Rob ###-#### for access Phone #: ###-#### Inspection requested via web by JANET TATILIAN
BLD-Final7/21/20157/22/20157/22/2015APASS
DetailsTony Young
Call Robert for access Phone #: ###-#### Inspection requested via web by JANET TATILIAN
FIRE-Final Inspection7/22/20157/22/20157/22/2015APASS
DetailsJim Page
Life fire safety passed/complete
BLD-Framing/Rough-in4/23/20154/23/20154/23/2015PPASS
DetailsTony Young
Call Janet at ###-#### to meet inspector at job site for access to building. Phone #: ###-#### Inspection requested via web by JANET TATILIAN
Issue PAID IN FULL permit  4/7/2015 DONE
Inspection Record Card- Bld  4/7/2015 DONE
Plan assigned to (AJS)2/24/20152/24/20153/24/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st revie completed Idaho Power
Routing - PLAN CHECK3/24/2015 3/24/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/24/2015 DONE
Permit Ready to Issue  3/24/2015 DONE
DetailsCandy A. Nichols
need GC and rev cert of val
Routing - PLAN CHECK2/24/2015 3/19/2015 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  3/19/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - Addressing2/24/2015 2/24/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS2/24/2015 2/24/2015 PASS
DetailsJennifer Bruner
Routing PW Sewer Rating2/24/2015 2/24/2015 PASS
DetailsJennifer Bruner
No additional fixtures
Intake Approval  2/24/2015 PASS
DetailsAdele J Schaffeld-Griffin
Application received  2/12/2015 DONE
Application submitted via PDS Online on Feb 12 2015 10:39AM