Permit Information
Permit NumberBLD15-00377
StatusFinaled
Name JRW CONSTRUCTION
Site Address 5598 N EAGLE RD
Project NameStrategic SOS
Customer Number15-00378
ePlanReviewNo
Description
(STRATEGIC SOS - Shell & Core) - To construct a new 6,700 square foot, one story wood framed office shell building and related site improvements. **PLAN MODIFICATION - 11/5/15 Modification to drainage system only. **TLW** This shell building is being designed for two future office tenant spaces. Separate tenant improvement permits will be required to finish this building for occupancy. The east side of this building will be finished as an office tenant under building permit BLD15-00378. This building is not fire sprinklered. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice3/14/20163/14/20164/12/2016 DONE
DetailsCandy A. Nichols
sent in mail 4-13-16
BLD-Final3/14/20163/15/20163/14/2016APASS
DetailsJim Sly
Eric Phone #: ###-####
DOC - Permit Finaled3/14/20163/14/20163/14/2016PPASS
DetailsJim Sly
FIRE-Final Inspection3/11/20163/14/20163/14/2016APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final3/10/20163/11/20163/11/2016ANR
DetailsJim Sly
Eric Phone #: ###-####
Need Public works and Fire finals
PubWorks Occupancy Approval3/11/20163/11/20163/11/2016 DONE
DetailsTiffany Lowery
FIRE-Final Inspection3/10/20163/10/20163/10/2016PFAIL
DetailsTroy Cobbley
Provide building address on the street side of the building, remove arrow on exit sign directing people to locked door, provide fire dept access signage per notes.
Inspection Record Card- Bld  3/3/2016 DONE
BLD-Framing/Rough-in12/14/201512/15/201512/15/2015PPASS
DetailsJim Sly
Eric Phone #: ###-####
BLD-Ceiling Grid Inspection12/1/201512/1/201512/1/2015PPART
DetailsJim Sly
Eric Phone #: ###-####
1st layer of rock on ceiling.....OK OK for 2nd layer.
BLD-Framing/Rough-in11/30/201511/30/201511/30/2015PPART
DetailsJim Sly
Eric Phone #: ###-####
Ext shear nailing OK.......Trusses OK......OK to install 1st layer of rock on ceiling .......... pending Electr, Plumb and Mech. approval for cover.
CHANGE STATUS TO (ISS)  11/16/2015 DONE
(F) Reprint permit  11/16/2015 DONE
OVERRIDE  11/13/2015  
Telephone call  11/13/2015 DONE
called Renny to let know that the plan mod is ready and how much is owed-left message on his cell-PLEASE DO NOT RE ISSUE
Routing - PLAN CHECK11/5/2015 11/13/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  11/13/2015 DONE
Permit Ready to Issue  11/13/2015 DONE
PWK15-00208 and PWK15-002015 fees need paid, then please do not re issue
Plan assigned to (TLW)10/23/2015 11/13/2015 PASS
DetailsTim L. Woodard
Routing PW Drainage11/12/2015 11/12/2015 PASS
DetailsJason C. Taylor
Project approved. JCT
Plan Modification Accepted  11/5/2015 DONE
received (3) sets of grading and drainage plans (L1.10, L1.15) and specifications
Routing PW Drainage10/27/2015 10/27/2015 FAIL
DetailsJason C. Taylor
Geotechnical report has hadpan confining layer under swale. Grading plan must be revised to reflect percolation rate of a minimum 1/2" per hour. Jason Taylor ###-####.
Routing - PLAN CHECK10/23/2015 10/26/2015 PASS
DetailsTim L. Woodard
Drainage plans only. TLW
Routing PW Drainage10/26/2015 10/26/2015 FAIL
DetailsJason C. Taylor
Need 2 full size copies of Sheet L2.15 to process application. Jason Taylor ###-####
Plan Modification Accepted  10/23/2015 DONE
received (2) sets of grading & drainage plans and calculations & Erosion plans
BLD-Foundation9/30/201510/1/201510/1/2015PPASS
DetailsJim Sly
Wes Phone #: ###-####
BLD-Footing9/29/20159/30/20159/30/2015APASS
DetailsJim Sly
Wes Phone #: ###-####
BLD-Footing9/25/20159/28/20159/28/2015PNR
DetailsJim Sly
Jerry Phone #: ###-####
BLD-Footing9/24/20159/25/20159/25/2015PCANC
DetailsJim Sly
Dane Phone #: ###-####
Case Summary (BLD)  9/10/2015 DONE
DetailsAdele J Schaffeld-Griffin
Issue PAID IN FULL permit  9/9/2015 DONE
Place hold on job9/1/2015 9/9/2015 DONE
DetailsBrittany Hill
DO NOT ISSUE WITHOUT BLD15-00378
OVERRIDE  9/1/2015  
Inspection Record Card- Bld  9/1/2015 DONE
Telephone call  9/1/2015 DONE
DetailsChristina Prado
Called Robyn toadvise both permits are ready pending ACHD, RP, GC & Revised cert of value for issuance
Permit Ready to Issue  9/1/2015 DONE
***MET*** GC Form and Revised Cert of Value
PLANS/APPL TAKEN TO FRONT DESK  8/31/2015 DONE
Routing - PLAN CHECK8/28/2015 8/31/2015 PASS
DetailsTim L. Woodard
Approved for showing compliance with previously mentioned items only. A complete re-review was not done. This plans was previously fully reviewed by John Menard. TLW
Plan assigned to (TLW)5/5/2015 8/31/2015 PASS
DetailsTim L. Woodard
1st Review Complete New Commercial - Reassigned from John Menard
Routing Off Site - STRUCTURAL8/18/2015 8/31/2015 PASS
DetailsTim L. Woodard
Routing - Erosion and Sediment8/19/2015 8/31/2015 PASS
DetailsEvan Jenkins
Approved and stamped approved on Plans by EEJ. TLW
Routing - MECHANICAL8/28/2015 8/28/2015 PASS
DetailsTroy James
Routing - Design Review8/19/2015 8/19/2015 PASS
DetailsAndrea Tuning
Plan resubmittals received  8/4/2015 DONE
Two copies of Strategic SOS Stormwater Runoff Management and Treatment Calculations, Two copies of Storm Drainage System Operation and Maintenance Requirements, Three copies of Revised Structural Calculations, Two Copies of sheets A0.1, A0.2, A1.1, A1.2, A1.3, A1.4, A1.5, A1.6, A2.1, A3.1, A3.2, A3.3, A3.4, S1.0, S1.1, S1.1.1, S2.1, S1.2.1, L0.00, L1.10, L1.15, L2.10, L2.15, L3.1, M-1.0, M-2.0, P-1, P-2, E-0.0, E-0.1, E-1.0, E-2.0, E-3.0, E-4.0, and E-5.0. Taken to Tim W
Plan assigned to (JCM)2/13/2105 5/5/2015 DEFR
DetailsJohn Menard
1st Review Complete 3/12/2105
Reassigned to Tim Woodard
Route to Impact Fee Review3/17/20153/20/20153/26/2015 PASS
DetailsCindy M. Gould
Routing - FIRE3/12/2015 3/17/2015 PASS
DetailsScott Arellano
Attached comments to plans.
1st review completed  3/17/2015 FAIL
Failed DR, Plan Check, Mech, Structural
Plan resubmittals requested  3/12/2015 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK2/26/2015 3/12/2015 FAIL
DetailsJohn Menard
Routing Off Site - STRUCTURAL3/4/2015 3/4/2015 PASS
DetailsJohn Menard
Plan resubmittals received  3/3/2015 DONE
Recieved three sets of revised plans marked S2.1, S1.1 and S1.2.1, plans inserted by arch and taken to John M for review
Plan resubmittals requested  3/2/2015 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL2/13/2015 3/2/2015 FAIL
DetailsJohn Menard
Received comment list from conulting structural engineer requesting revisions. JCM
Routing - MECHANICAL2/24/2015 2/26/2015 FAIL
DetailsTroy James
See TI permit for corrections
Plan resubmittals received  2/25/2015 DONE
DetailsChristina Prado
Received two sets revised plan sheets marked A0.2, A1.1, S1.1, m-1, P-1 & p-2; Plans inserted by arch and taken back to plan review
Routing - PLUMBING2/24/2015 2/24/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC. Note on water heater pan drain and t&p drain.
Routing - Erosion and Sediment2/23/2015 2/24/2015 PASS
DetailsEvan Jenkins
(SITE PREP INSPECTION REQUIRED)
Shell and Core for Commercial Building
Routing - Design Review2/23/2105 2/23/2015 FAIL
DetailsSarah Schafer
The applicant is required to provide a 30-foot front setback to preserve the landscape easment along Eagle Road.
Routing - PUBLIC WORKS2/18/2015 2/20/2015 PASS
DetailsJennifer Bruner
Routing PW Solid Waste2/18/2015 2/20/2015 PASS
DetailsMegan Durrell
No trash enclosure indicated on the drawing.
Trash enclosure for sub is undersized. No dumpsters are allowed.
All tenants must use commercial cart trash/recycling service. 4 carts are allowed. All carts must be stored in the trash enclosure.
Routing PW Sewer Design2/18/2015 2/19/2015 PASS
DetailsKyle S. Rosenmeyer
Sewer constructed under DRI 1375 in 2006.
Routing PW Street Lights2/18/2015 2/19/2015 PASS
DetailsMike D Hedge
No street lighting required.
Routing PW Drainage2/18/2015 2/19/2015 PASS
DetailsBrian Murphy
APPROVED UNDER PREVIOUS ODI
Routing PW Sewer Rating2/18/2015 2/18/2015 PASS
DetailsJennifer Bruner
per Architect see Sheet A1.1; Rate space with future TI
Routing - Addressing2/17/2015 2/18/2015 PASS
DetailsJason C. Taylor
Routing - PLANNING Land Div2/13/2015 2/17/2015 PASS
DetailsTodd Tucker
Building must be moved 10 feet to the east. There is a platted 30 foot wide landscape easement along Eagle Road.
Plans ACCEPTED BY PLAN TECH  2/13/2015 DONE
DetailsChristina Prado
Intake Approval  2/13/2015 PASS
DetailsCarl D Madsen
Recd Pcfee & Taken To Pln CK  2/13/2015 DONE
DetailsChristina Prado
Pending Assignment by JCM2/13/2015 2/13/2015 DONE
DetailsJohn Menard
Application received 2/13/2015