First Notice | | 3/24/2016 | 4/12/2016 | | DONE |
|
|
|
sent in mail 4-13-16
|
BLD-Final | 3/11/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-#### OK for Perm Occ. See Electr notes in activities......102 final ok.
|
FIRE-Final Inspection | 3/11/2016 | 3/14/2016 | 3/14/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Print Occupancy Form | | | 3/14/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/14/2016 | | DONE |
|
|
|
|
BLD-Final | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | NR |
Jim Sly
|
|
|
Eric Phone #: ###-#### Need Public works and Fire finals.
|
FIRE-Final Inspection | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide building address on the street side of the building, remove arrow on exit sign directing people to locked door, provide fire dept access signage per notes.
|
Print Occupancy Form | | | 3/3/2016 | | DONE |
Christina Prado
|
|
|
|
BLD-Ceiling Grid Inspection | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Energy code compliance | 12/21/2015 | 12/22/2015 | 12/23/2015 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 12/14/2015 | 12/15/2015 | 12/15/2015 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
Case Summary (BLD) | | | 9/10/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Place hold on job | 9/1/2015 | | 9/9/2015 | | DONE |
Brittany Hill
|
|
|
DO NOT ISSSUE WITHOUT BLD15-00377
|
Issue PAID IN FULL permit | | | 9/9/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 9/1/2015 | | |
|
|
|
|
Print Occupancy Form | | | 9/1/2015 | | DONE |
|
|
|
|
Telephone call | | | 9/1/2015 | | DONE |
Christina Prado
|
|
|
Called Robyn toadvise both permits are ready pending ACHD, RP, GC & Revised cert of value for issuance
|
Permit Ready to Issue | | | 9/1/2015 | | DONE |
|
|
|
Need RP, Revised Cert of Value
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/17/2015 | | 8/31/2015 | | PASS |
Tim L. Woodard
|
|
|
Approved for showing compliance with previously mentioned items only. A complete re-review was not done. This plans was previously fully reviewed by John Menard. TLW
|
Plan assigned to (TLW) | 5/5/2015 | | 8/31/2015 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete. TI for New Shell - Reassigned from John Menard
|
Routing - PLAN CHECK | 8/28/2015 | | 8/31/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - MECHANICAL | 8/24/2015 | | 8/28/2015 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 8/24/2015 | | 8/24/2015 | | PASS |
Evan Jenkins
|
|
|
(STRATEGIC SOS - Tenant Improvement) - To finish a 4,155 square foot, office space for Strategic SOS Company. This tenant space will include offices, small conference rooms, a large lobby and, accessible restrooms and a break room. This tenant space is being constructed on the east side of a new office shell building. This tenant space is being finished along with the construction of the building shell that is being constructed under building permit BLD15-00377. All construction per the approved plans and attached comment list
|
Plan resubmittals received | | | 8/13/2015 | | DONE |
|
|
|
Three copies of Sheet M-1.0. Taken to Tim
|
Plan assigned to (JCM) | 2/13/2015 | | 5/5/2015 | | DEFR |
John Menard
|
|
|
1st Review Complete 3/12/2105
Reassigned to Tim Woodard
|
Routing - FIRE | 3/12/2015 | | 3/17/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans and case.
|
1st review completed | | | 3/17/2015 | | FAIL |
|
|
|
Failed plan check and mechanical
|
Plan resubmittals requested | | | 3/12/2015 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 2/26/2015 | | 3/12/2015 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 3/3/2015 | | DONE |
|
|
|
Recieved three sets of revised plans marked S2.1, S1.1 and S1.2.1, plans inserted by arch and taken to John M for review
|
Routing - MECHANICAL | 2/24/2015 | | 2/26/2015 | | FAIL |
Troy James
|
|
|
emailed corrections to applicant
|
Plan resubmittals received | | | 2/25/2015 | | DONE |
Christina Prado
|
|
|
Received two sets revised plan sheets marked A0.2, A1.1, S1.1, m-1, P-1 & p-2; Plans inserted by arch and taken back to plan review
|
Routing - PLUMBING | 2/24/2015 | | 2/24/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC. Note on plan for water heater pan drain and t&p drain.
|
Routing - Design Review | 2/23/2015 | | 2/23/2015 | | FAIL |
Sarah Schafer
|
|
|
The applicant is required to provide a 30-foot front setback to preserve the landscape easment along Eagle Road.
|
Routing - PUBLIC WORKS | 2/18/2015 | | 2/20/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Solid Waste | 2/18/2015 | | 2/20/2015 | | PASS |
Megan Durrell
|
|
|
No trash enclosure identified on drawings.
Shared trash enclosure for sub is insufficient for the development. No dumpsters are allowed.
All tenants must use commercial cart trash/recycling services.
A maximum of 4 carts are allowed per tenant.
All carts must be stored inside the enclosure.
|
Routing PW Drainage | 2/18/2015 | | 2/19/2015 | | PASS |
Brian Murphy
|
|
|
APPROVED UNDER PREVIOUS ODI
|
Routing PW Street Lights | 2/18/2015 | | 2/19/2015 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Routing PW Sewer Design | 2/18/2015 | | 2/19/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Rating | 2/18/2015 | | 2/18/2015 | | PASS |
Jennifer Bruner
|
|
|
per Architect see Sheet A1.1
|
Routing - Addressing | 2/13/2015 | | 2/18/2015 | | PASS |
Jason C. Taylor
|
|
|
Business is to be located in Suite 102 and not 101. Jason Taylor
|
Plans ACCEPTED BY PLAN TECH | | | 2/13/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/13/2015 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/13/2015 | | DONE |
Christina Prado
|
|
|
|
Pending Assignment by JCM | 2/13/2015 | | 2/13/2015 | | DONE |
John Menard
|
|
|
|
Application received | | 2/13/2015 | | | |
|
|
|
|