BLD-Final | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | PASS |
Jim Sly
|
|
|
Call half hour before // Shawn Phone #: ###-####
|
DOC - Permit Finaled | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 7/29/2015 | 7/30/2015 | 7/30/2015 | A | PASS |
Tony Young
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Tony Young
|
|
|
Shawn Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Tony Young
|
|
|
|
Routing Walk-In (BLD) | 7/8/2015 | 7/8/2015 | 7/8/2015 | A | PASS |
Tisha Gallop
|
|
|
wanted to add small window in attic at gable end below gable vent. Told him ok as long as verify with truss engineering.
|
Routing - MECHANICAL | 7/1/2015 | | 7/1/2015 | | PASS |
Troy James
|
|
|
|
BLD-Foundation | 4/28/2015 | 4/29/2015 | 4/29/2015 | P | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 4/24/2015 | 4/27/2015 | 4/27/2015 | A | PASS |
Tony Young
|
|
|
Ryan Phone #: ###-####
|
Routing Walk-In (BLD) | 4/21/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Perry Paine
|
|
|
discussed th possibility of adding a 440s.f. attached garage to this structure. SRS CTC....Need to get with LNL approvals
|
OVERRIDE | | | 4/7/2015 | | |
|
|
|
|
Plan assigned to (PEP) | 4/7/2015 | 4/7/2015 | 4/7/2015 | | PASS |
Perry Paine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2015 | | DONE |
|
|
|
as per Perry-ready to be issued
|
Permit Ready to Issue | | | 4/7/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/7/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 4/7/2015 | | 4/7/2015 | | PASS |
Leon Letson
|
|
|
All issues resolved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 4/1/2015 | | 4/1/2015 | | FAIL |
Leon Letson
|
|
|
Applicant must provide recorded Deed Restriction and ADU Conditions of Approval.
|
Routing Walk-In (BLD) | 3/31/2015 | 3/31/2015 | 3/31/2015 | A | PASS |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 3/3/2015 | 3/3/2015 | 3/31/2015 | | PASS |
Perry Paine
|
|
|
fail in planning...ownership mproblems
|
Inspection Record Card- Bld | | | 3/31/2015 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 3/31/2015 | | DONE |
Candy A. Nichols
|
|
|
as per Leon-needs to do a plan review for the adu
|
Plan assigned to (LEG) Tisha | 2/24/2015 | | 3/3/2015 | | DEFR |
Tisha Gallop
|
|
|
2/24/15 need zoning approval....to perry
|
Routing Walk-In (BLD) | 2/24/2015 | 2/24/2015 | 3/2/2015 | P | PASS |
Perry Paine
|
|
|
|
Plan assigned to (JG) | | 2/17/2015 | 2/24/2015 | | DEFR |
Javier Guzman
|
|
|
3/02 M L1 ADU
|
Routing - PLAN CHECK | 2/23/2015 | | 2/24/2015 | | FAIL |
Tisha Gallop
|
|
|
need zoning approval
|
Telephone call | | | 2/24/2015 | | DONE |
|
|
|
called Shawn Corbeil and told him need zoning approval before building review. Told him upon preliminary review need deck details and egress window in basement.
|
1st review completed | | | 2/24/2015 | | FAIL |
|
|
|
|
Routing - MECHANICAL | 2/19/2015 | | 2/23/2015 | | PASS |
Troy James
|
|
|
Applicant stated the home will be heated with electric baseboard heaters. Any changes to heating design may require heating load calcs.
|
Routing - PLANNING | 2/19/2015 | | 2/19/2015 | | FAIL |
Sue Cummings
|
|
|
FAIL - needs planning approval for an ADU prior to issuing a BLD.
|
Routing - PUBLIC WORKS | 2/19/2015 | | 2/19/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 2/17/2015 | | 2/19/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/18/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 2/18/2015 | | PASS |
Candy A. Nichols
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/17/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 2/17/2015 | | | |
|
|
|
|