Zoning Approval | 11/13/2015 | 11/13/2015 | 11/13/2015 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Final | 9/15/2015 | 9/16/2015 | 9/16/2015 | P | PASS |
Phil Shearer
|
|
|
Tony, please call before you go out to inspect 850.8424. thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
DOC - Permit Finaled | 9/16/2015 | 9/16/2015 | 9/16/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 9/4/2015 | 9/8/2015 | 9/8/2015 | P | NR |
Tony Young
|
|
|
Steve Phone #: ###-####
|
Zoning Approval | 9/8/2015 | 9/8/2015 | 9/8/2015 | | FAIL |
Matthew A Halitsky
|
|
|
Windows not installed per HPC approval. No landscaping ground cover.
|
BLD-Framing/Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | PASS |
Dave Hannah
|
|
|
This is the final item - the outside foundation fix - has been done! Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Framing/Rough-in | 6/4/2015 | 6/4/2015 | 6/4/2015 | P | PART |
Dave Hannah
|
|
|
reinspect Phone #: ###-#### Inspection requested via web by Andrew George still needs to fix foundation but ok to sheetrock
|
BLD-Framing/Rough-in | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PART |
Phil Shearer
|
|
|
reinspect Phone #: ###-#### Inspection requested via web by Andrew George. Interior shear OK. ,, get fix on floor in master bath (foundation),,
|
BLD-Wall cover | 5/29/2015 | 6/1/2015 | 5/31/2015 | A | NR |
Tony Young
|
|
|
verify shear on interior,, also get fix on floor in master bath (foundation),, b vent soffit?
|
BLD-Wall cover | 5/28/2015 | 5/29/2015 | 5/29/2015 | A | NR |
Tony Young
|
|
|
verify shear on interior,, also get fix on floor in master bath (foundation),, b vent soffit?
|
BLD-Conference | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PART |
Tony Young
|
|
|
verify hangers,, shear fix on interior,, also get fix on floor in master bath/// hangers ok,, need interior shear,, verify b -vent soffit or?,, and need master bath floor / foundation
|
BLD-Framing/Rough-in | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | NR |
Tony Young
|
|
|
verify hangers,, shear fix on interior,, also get fix on floor in master bath
|
BLD-Framing/Rough-in | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George,, ok to insulate
|
BLD-Framing/Rough-in | 5/26/2015 | 5/26/2015 | 5/26/2015 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George,, ok to insulate
|
BLD-Wall Bracing | 5/7/2015 | 5/8/2015 | 5/8/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Foundation | 3/26/2015 | 3/26/2015 | 3/26/2015 | A | PASS |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 3/19/2015 | 3/20/2015 | 3/20/2015 | A | PASS |
Tony Young
|
|
|
Phone #: 2056971241 >> Inspection requested via mobile web by Heron,, basement and garage
|
BLD-Footing | 3/19/2015 | 3/19/2015 | 3/19/2015 | A | PASS |
Jim Wyllie
|
|
|
House footing layout does not encroach into Flume easement. Okay to remove parcel hold. Jim Wyllie / ###-####
|
Override - Parcel Holds | | | 3/19/2015 | | |
|
|
|
|
OVERRIDE | | | 3/10/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/10/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 3/10/2015 | | DONE |
|
|
|
called Steve- told him permit is ready for pick up
|
Override - Parcel Holds | | | 3/10/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/10/2015 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 3/6/2015 | | 3/10/2015 | | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 3/6/2015 | | 3/10/2015 | | DONE |
Tisha Gallop
|
|
|
PW Floodplain failed, routed to front desk by mistake.
|
Routing PW Flood Plain | 3/10/2015 | | 3/10/2015 | | PASS |
Jim Wyllie
|
|
|
Copy of recorded Crane Creek Easement document has been received.
Applicant shall have a Professional Land Surveyor field locate and mark the easement boundary. Prior to placement of foundations, City building inspector shall verify foundation construction does not encroach into the recorded easement. (Jim Wyllie / ###-####)
|
Routing - PLANNING | 3/10/2015 | | 3/10/2015 | | PASS |
Matthew A Halitsky
|
|
|
OK mod 22 x 22 garage.
|
Case Summary (BLD) | | | 3/10/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/10/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 3/10/2015 | | DONE |
Candy A. Nichols
|
|
|
requirements met
|
Plan resubmittals received | | | 3/6/2015 | | DONE |
|
|
|
resubmittals were stamped received 2/25/15, but not routed through the permit desk. Routed today 3/6/15 to PW and floodplain.
|
Routing - PUBLIC WORKS | 3/6/2015 | | 3/6/2015 | | FAIL |
Jennifer Bruner
|
|
|
See Floodplain
|
Routing PW Flood Plain | 3/6/2015 | | 3/6/2015 | | FAIL |
Jim Wyllie
|
|
|
Provide a copy of the recorded Crane Creek Easement document.
Applicant shall have a Professional Land Surveyor field locate and mark the easement boundary. Prior to placement of foundations, City Building inspector shall verify foundation construction does not encroach into the recorded easement. (Jim Wyllie / ###-####)
|
OVERRIDE | | | 3/2/2015 | | |
|
|
|
|
Plan assigned to (JG) | 2/18/2015 | 2/18/2015 | 3/2/2015 | | DEFR |
Javier Guzman
|
|
|
3/02 M L1***
|
Routing - PLAN CHECK | 2/24/2015 | | 3/2/2015 | | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2015 | | DONE |
|
|
|
|
Telephone call | | | 3/2/2015 | | DONE |
|
|
|
called Steve- told him fees due and permit is ready for pick up
|
Plan assigned to (LEG) Tisha | 2/18/2015 | | 3/2/2015 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 3/2/2015 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 3/2/2015 | | DONE |
|
|
|
all requirements met- fees due
|
1st review completed | | | 3/2/2015 | | DONE |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 2/23/2015 | | 2/24/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/20/2015 | | 2/20/2015 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH14-00166, DRH14-00452 and CVA 14-00020
|
Routing - PUBLIC WORKS | 2/19/2015 | | 2/20/2015 | | FAIL |
Jennifer Bruner
|
|
|
See floodplain
|
Routing PW Sewer Rating | 2/20/2015 | | 2/20/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Flood Plain | 2/19/2015 | | 2/19/2015 | | FAIL |
Jim Wyllie
|
|
|
Garage encroaches into the Flume Easement. Approved garage width was 22 feet. A 24 foot wide garage is shown. Garage width cannot exceed 22 feet. Jim Wyllie / ###-####
|
Routing - Addressing | 2/18/2015 | | 2/19/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/18/2015 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/18/2015 | | DONE |
|
|
|
|
Intake Approval | | | 2/18/2015 | | PASS |
|
|
|
|
Application received | | 2/17/2015 | | | |
|
|
|
|