Third Notice | | 6/15/2016 | 7/11/2016 | | DONE |
|
|
|
|
Third Notice | | 5/16/2016 | 6/10/2016 | | DONE |
|
|
|
|
Second Notice | | 4/22/2016 | 5/11/2016 | | DONE |
|
|
|
mailed 5-12-16
|
First Notice | | 1/2/2016 | 4/12/2016 | | DONE |
|
|
|
sent in mail 4-13-16
|
Permanent Occupancy | | | 12/23/2015 | | DONE |
|
|
|
|
BLD-Final | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | PASS |
Jim Storey
|
|
|
Rick Phone #: ###-####
|
BLD-Final | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | PART |
Jim Storey
|
|
|
Rick Phone #: ###-#### ref ok to load.
|
FIRE-Final Inspection | 5/7/2015 | 5/7/2015 | 5/7/2015 | P | PASS |
Katie Marron
|
|
|
Fire life safety passed.
|
BLD-Framing/Rough-in | 5/1/2015 | 5/4/2015 | 5/4/2015 | A | PASS |
Jim Storey
|
|
|
Rick Phone #: ###-#### office and cooller ok
|
BLD-Framing/Rough-in | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | DEFR |
Jim Storey
|
|
|
Rick Phone #: ###-####out of time.
|
OVERRIDE | | | 4/30/2015 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/30/2015 | | DONE |
|
|
|
Plan mod
|
OVERRIDE | | | 4/17/2015 | | |
|
|
|
|
Plan assigned to (AJS) | | 4/17/2015 | 4/17/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 4/17/2015 | | 4/17/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLUMBING | 4/17/2015 | | 4/17/2015 | | PASS |
Bill VanDegrift
|
|
|
1) vent all traps
2) backwater valves approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/17/2015 | | DONE |
|
|
|
DO NOT RE-ISSUE
|
Plan Modification Accepted | | | 4/17/2015 | | DONE |
|
|
|
plan modification for sewer drainage schematic changes plans taken to 330-Bill and AJS
|
OVERRIDE | | | 4/1/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 3/5/2015 | 3/5/2015 | 4/1/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
my review completecd Level 3 TI - Paper - Northwest Produce
|
Print Occupancy Form | | | 4/1/2015 | | DONE |
|
|
|
|
Telephone call | | | 4/1/2015 | | DONE |
Christina Prado
|
|
|
called Mike to advise permit review is complete and RP, GC FOrm & revised Cert of value are needed for issuance.
No Cert of value as application filled by contractor
RP given - Rick Ruth///cdp
|
Issue PAID IN FULL permit | | | 4/1/2015 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 3/30/2015 | | 4/1/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 4/1/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/1/2015 | | DONE |
|
|
|
NEED RP, GC form, and Certificate of Value
|
Routing - FIRE | 3/23/2015 | 3/21/2015 | 3/30/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
1st review completed | | | 3/30/2015 | | FAIL |
|
|
|
Failed Plan Check, Mechanical, Planning.
|
Routing - MECHANICAL | 3/26/2015 | | 3/27/2015 | | PASS |
Troy James
|
|
|
routed sheets M-100 to mechanical for review
|
Plan resubmittals received | | | 3/26/2015 | | DONE |
|
|
|
received 2 copies of sheet M-100- put on Adele's desk
|
Plan resubmittals received | | | 3/24/2015 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked G-001, G-002, G-003, G-004, A-101, A-111, A-141, A-311, A-321, A-322 & A421 as well as two sets response letter and revised structural calcs; Plans stamped and taken to Adele for further review
|
Routing - PLANNING Land Div | 3/23/2015 | | 3/23/2015 | | PASS |
Dave Abo
|
|
|
New Tax Parcel Number R3219900042 consolidating Lots 7-8 and portion of Lot 6 as shown on ROS 3520.
|
Routing - PLAN CHECK | 3/18/2015 | | 3/21/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 3/16/2015 | | 3/18/2015 | | PASS |
Sarah Schafer
|
|
|
Andrea Tuning - CZC15-00035
|
Routing - PLANNING Land Div | 3/13/2015 | | 3/15/2015 | | FAIL |
Dave Abo
|
|
|
Prior to issuance of building permit, property lines as shown on Ada County Assessor's map must be removed. Can be done with a Record of Survey/Parcel Consolidation.
|
Routing - MECHANICAL | 3/11/2015 | | 3/13/2015 | | FAIL |
Troy James
|
|
|
emailed correction to applicant
|
Routing - PUBLIC WORKS | 3/6/2015 | | 3/11/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 3/11/2015 | | 3/11/2015 | | PASS |
Evan Jenkins
|
|
|
Project consists of a concrete pad for the cooler, installation of a 16ft x 6" trench drain. Minimal interior saw cutting.
|
Routing PW Environmental | 3/6/2015 | | 3/10/2015 | | PASS |
Rick Christenson
|
|
|
Floor drain in prep room shall be protected to prevent large debris from entering.
|
Routing PW Sewer Rating | 3/6/2015 | | 3/6/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 3/5/2015 | | 3/6/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Pending Assignment by JCB | 3/5/2015 | | 3/5/2015 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/4/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 3/4/2015 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/4/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 2/18/2015 | | FAIL |
|
|
|
|
Application received | | 2/18/2015 | | | |
|
|
|
|