Permit Information
Permit NumberBLD15-00405
StatusFinaled
Name SCHULTZ DEAN V
Site Address 2305 N CLAREMONT DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**WUI Zone A** Permit to install new manufactured truss roof over existing low slope hand stacked roof system, a 558 sq. ft. addition consisting of new master bed/bath and new 120 sq. ft. covered patio. All new construction is to comply with WUI Zone A requirements. All work is to be done according to approved plans, attached Engineering and local codes. Separate electrical, plumbing, mechanical and erosion permits are required. **A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/14/20159/18/20159/18/2015APASS
DetailsTony Young
Dean Phone #: ###-####
DOC - Permit Finaled9/18/20159/18/20159/18/2015PPASS
DetailsTony Young
c of c issued
BLD-Energy code compliance5/7/20155/7/20155/7/2015PPASS
DetailsTony Young
Dean Phone #: ###-####
BLD-Energy code compliance5/6/20155/7/20155/7/2015ANR
DetailsTony Young
Dean Phone #: ###-####
BLD-Framing/Rough-in5/6/20155/6/20155/6/2015PPART
DetailsTony Young
Dean Phone #: ###-####,, ok to insulate,, need mechanical prior to cover
BLD-Conference4/27/20154/28/20154/29/2015PPART
DetailsTony Young
Dean Phone #: ###-####-please call to meet,, WUI ?s,, referred to R.G. with fire
BLD-Conference4/27/20154/27/20154/27/2015PPART
DetailsTony Young
Dean Phone #: ###-####-please call to meet,, walk through,, need water barrior under siding,, gave him Romeos # for soffit ?
BLD-Wall Bracing4/17/20154/20/20154/20/2015APASS
DetailsDave Hannah
Dean Phone #: ###-####
BLD-Framing/Rough-in4/17/20154/20/20154/17/2015ACANC
DetailsTony Young
Can. Per Dean Phone #: ###-####
BLD-Foundation3/19/20153/20/20153/20/2015ADONE
DetailsTony Young
Dean Phone #: ###-####
BLD-Footing3/12/20153/12/20153/12/2015PPASS
DetailsTony Young
Dean Phone #: ###-####
PubWorks Subgrade Approval3/12/20153/12/20153/12/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
CHANGE STATUS TO (ISS)  3/2/2015 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  2/24/2015 DONE
OVERRIDE  2/23/2015  
Routing Walk-In (BLD)2/20/20152/20/20152/23/2015APASS
DetailsTisha Gallop
Routing - Erosion and Sediment2/20/2015 2/23/2015 PASS
DetailsEvan Jenkins
per activities in ESC permit
1st review completed  2/23/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/23/2015 DONE
Inspection Record Card- Bld  2/23/2015 DONE
Permit Ready to Issue  2/23/2015 DONE
FEES DUE
Telephone call  2/23/2015 DONE
called Dean- told him permit is ready for pick up and fees due
Plan assigned to (LEG) Tisha2/20/2015 2/23/2015 PASS
DetailsTisha Gallop
Routing Walk-In (BLD)2/19/20152/19/20152/19/2015ADONE
DetailsTisha Gallop
Routing Walk-In (Zoning)2/19/20152/19/20152/19/2015ADONE
DetailsJason C. Taylor
Routing Walk-In (PW Hillside)2/19/20152/19/20152/19/2015APASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (Zoning)2/19/20152/19/20152/19/2015APASS
DetailsSue Cummings
Application received 2/19/2015