Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD15-00445
StatusIssued
Name AQUATECH POOLS BY CHI
Site Address 1010 N HOUSTON RD
Project Name 
Customer Number 
ePlanReviewNo
Description
To place a new incround concrete swimming pool with R-1C setbacks approved by Colleen Carroll.Separate electrical permit is required and bonding of all metal parts is required to be approved by the electrical division prior to approval for placement of any concrete by the structural division. New Pool A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor 384-3946. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing4/23/20154/24/20154/24/2015PPASS
DetailsDave Hannah
Jim Phone #: ###-####
BLD-Foundation4/22/20154/23/20154/24/2015PPASS
DetailsDave Hannah
Jim Phone #: ###-####
PubWorks Subgrade Approval4/24/20154/24/20154/24/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  4/16/2015 DONE
OVERRIDE  4/8/2015  
Telephone call  4/8/2015 DONE
Left Message on anwering machine at Aquatech Pools for Jim
Permit Ready to Issue  4/8/2015 DONE
Can't be issued until grading is ready
Routing Walk-In (Erosion)4/7/20154/7/20154/7/2015APASS
DetailsEvan Jenkins
(SITE PREP INSPECTION AND APPROVAL REQUIRED PRIOR TO EARTH DISTURBANCE)
New Pool at a SFH, landscaping and the modification/reconstruction of the existing retaining wall system. ESC Plan states there are a series of retaining walls in the back portion of the property. A seepage pit is proposed as part of the project.
Routing Walk-In (BLD)4/7/20154/7/20154/7/2015ADONE
DetailsPerry Paine
Routing Walk-In (PW Hillside)4/3/20154/3/20154/7/2015PPASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor ###-####.
Inspection Record Card- Bld  4/7/2015  
PLANS/APPL TAKEN TO FRONT DESK  4/7/2015 DONE
Routing Walk-In (Zoning)2/23/20152/23/20152/23/2015APASS
DetailsColleen T Carroll
Routing Walk-In (PW Hillside)2/23/20152/23/20152/23/2015AFAIL
DetailsJason C. Taylor
Need soils report and grading plan prior to approval of pool or landscaping. Jason Taylor ###-####.
1st review completed  2/23/2015 FAIL
DetailsPerry Paine
Application received 2/23/2015