BLD-Footing | 4/23/2015 | 4/24/2015 | 4/24/2015 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Foundation | 4/22/2015 | 4/23/2015 | 4/24/2015 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
PubWorks Subgrade Approval | 4/24/2015 | 4/24/2015 | 4/24/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/16/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/8/2015 | | |
|
|
|
|
Telephone call | | | 4/8/2015 | | DONE |
|
|
|
Left Message on anwering machine at Aquatech Pools for Jim
|
Permit Ready to Issue | | | 4/8/2015 | | DONE |
|
|
|
Can't be issued until grading is ready
|
Routing Walk-In (Erosion) | 4/7/2015 | 4/7/2015 | 4/7/2015 | A | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION AND APPROVAL REQUIRED PRIOR TO EARTH DISTURBANCE)
New Pool at a SFH, landscaping and the modification/reconstruction of the existing retaining wall system. ESC Plan states there are a series of retaining walls in the back portion of the property. A seepage pit is proposed as part of the project.
|
Routing Walk-In (BLD) | 4/7/2015 | 4/7/2015 | 4/7/2015 | A | DONE |
Perry Paine
|
|
|
|
Routing Walk-In (PW Hillside) | 4/3/2015 | 4/3/2015 | 4/7/2015 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor ###-####.
|
Inspection Record Card- Bld | | | 4/7/2015 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2015 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 2/23/2015 | 2/23/2015 | 2/23/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (PW Hillside) | 2/23/2015 | 2/23/2015 | 2/23/2015 | A | FAIL |
Jason C. Taylor
|
|
|
Need soils report and grading plan prior to approval of pool or landscaping. Jason Taylor ###-####.
|
1st review completed | | | 2/23/2015 | | FAIL |
Perry Paine
|
|
|
|
Application received | | 2/23/2015 | | | |
|
|
|
|