Case Summary (BLD) | | | 2/8/2016 | | DONE |
|
|
|
|
BLD-Final | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PASS |
Dave Hannah
|
|
|
Scott Phone #: ###-####
|
DOC - Permit Finaled | 1/29/2016 | 1/29/2016 | 1/29/2016 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 1/25/2016 | 1/25/2016 | 1/25/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 1/21/2016 | 1/21/2016 | 1/22/2016 | P | PEND |
Dave Hannah
|
|
|
Scott Phone #: ###-#### needs hill side final
|
BLD-Other | 10/14/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Dave Hannah
|
|
|
fire/dry wall // Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 9/29/2015 | 9/30/2015 | 10/1/2015 | P | PASS |
Dave Hannah
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PART |
Jim Storey
|
|
|
Scott Phone #: ###-#### ok to insulate exterior and cover/ fire blk 10 ft horazonal 2nd floor ceilling.
|
BLD-Wall Bracing | 8/6/2015 | 8/7/2015 | 8/7/2015 | A | PASS |
Dave Hannah
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 8/3/2015 | 8/4/2015 | 8/5/2015 | P | PART |
Dave Hannah
|
|
|
Roof // Scott Phone #: ###-#### trusses ok ok to sheet ceiling on ent
|
BLD-Wall Bracing | 6/15/2015 | 6/16/2015 | 6/16/2015 | A | PART |
Dave Hannah
|
|
|
Scott Phone #: ###-#### second floor ok to cover
|
BLD-Foundation | 4/21/2015 | 4/22/2015 | 4/22/2015 | P | PASS |
Dave Hannah
|
|
|
Rebar // Scott Phone #: ###-####
|
BLD-Footing | 4/20/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Dave Hannah
|
|
|
Steve// late as possible Phone #: ###-####
|
BLD-Foundation | 4/10/2015 | 4/13/2015 | 4/14/2015 | P | PASS |
Dave Hannah
|
|
|
Rebar // Scott Phone #: ###-#### mono pour for the house
|
PubWorks Subgrade Approval | 3/31/2015 | 3/31/2015 | 3/31/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Override - Parcel Holds | | | 3/17/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/17/2015 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 3/16/2015 | | |
|
|
|
|
Plan assigned to (JG) | | 2/24/2015 | 3/16/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 3/12 TH L2 Hillside
|
Routing - PLAN CHECK | 3/6/2015 | | 3/16/2015 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 3/16/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/16/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 3/16/2015 | | DONE |
Candy A. Nichols
|
|
|
requirements met
|
Inspection Record Card- Bld | | | 3/16/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 3/12/2015 | | DONE |
|
|
|
RECEIVED 2 COPIES OF SHEETS A2.01, A3.03, A5.01, A5.04, A5.05, A8.04, A8.05, M2.01, M2.02, AND STRUCTURAL CALCS- Also received letter for engineering & design, Enerform letter, Detailed FPSF design method- heating buildings, heat-recovery ventilators- ducted, ICC-ES Evaluation report, and UL evaluation report// Put on Javier's desk with plans
|
Routing - PUBLIC WORKS GRADING | 3/11/2015 | | 3/11/2015 | | PASS |
Jason C. Taylor
|
|
|
Grading permit pulled out and issued seperately. See GRD15-00007. Jason Taylor ###-####
|
1st review completed | | | 3/10/2015 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | | | 3/10/2015 | | FAIL |
Javier Guzman
|
|
|
emailed review report to applicant
|
Routing - FIRE | 3/3/2015 | 2/24/2015 | 3/6/2015 | | PASS |
Scott Arellano
|
|
|
Approved as shown. No comments attached.
|
Routing - Erosion and Sediment | 3/2/2015 | | 3/3/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE)
As per ESC conditions, ESC site map and narrative submitted for foothill lot. BMPs listed include stabilized construction access, preservation of existing vegetation outside clearing limits, perimeter wattles between lot and existing home, fugitive dust control, and storm drain catch basin protection downstream from site. Must protect existing stormwater infiltration swale at south end of property. Schedule and pass ESC site prep inspection after setting up BMPs and before excavation ###-####
|
Routing - MECHANICAL | 2/27/2015 | | 3/2/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/26/2015 | | 2/27/2015 | | PASS |
Ted Vanegas
|
|
|
|
Routing - Addressing | 2/24/2015 | | 2/26/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 2/26/2015 | | 2/26/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | | | 2/26/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 2/24/2015 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/24/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 2/24/2015 | | PASS |
Candy A. Nichols
|
|
|
|
Override - Parcel Holds | | | 2/24/2015 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/23/2015 | | DONE |
Candy A. Nichols
|
|
|
|