BLD-Final | 12/30/2015 | 12/30/2015 | 12/30/2015 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
DOC - Permit Finaled | 12/30/2015 | 12/30/2015 | 12/30/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 12/29/2015 | 12/29/2015 | 12/29/2015 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | PEND |
Tony Young
|
|
|
would like call ahead; Josh Phone #: ###-####,, all ok,,, just needs hillside sign off
|
BLD-Final | 12/11/2015 | 12/14/2015 | 12/14/2015 | A | NR |
Tony Young
|
|
|
JOSH - CALL 30 MINS PRIOR FOR ACCESS Phone #: ###-####
|
BLD-Final | 12/11/2015 | 12/11/2015 | 12/11/2015 | P | NR |
Tony Young
|
|
|
JOSH - CALL 30 MINS PRIOR FOR ACCESS Phone #: ###-####,, c/n posted
|
BLD-Final | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | NR |
Jim Storey
|
|
|
would like call ahead; Josh Phone #: ###-#### need mech and public works
|
BLD-Conference | 8/24/2015 | 8/25/2015 | 8/25/2015 | A | FAIL |
Tony Young
|
|
|
porch follow up,, still waiting on justification missed bearing on porch footings,, fixes
|
BLD-Conference | 8/7/2015 | 8/10/2015 | 8/10/2015 | A | PEND |
Tony Young
|
|
|
porch follow up,,, will call in for conference
|
BLD-Conference | 8/6/2015 | 8/7/2015 | 8/7/2015 | P | NH |
Tony Young
|
|
|
porch follow up,,
|
BLD-Conference | 8/6/2015 | 8/6/2015 | 8/6/2015 | P | FAIL |
Tony Young
|
|
|
porch follow up,, post bases missed,, need engineering for as built or justify, no inspections were called in , DO NOT COVER
|
BLD-Other | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PASS |
Phil Shearer
|
|
|
Josh Phone #: ###-####. Sofit
|
BLD-Framing/Rough-in | 6/2/2015 | 6/2/2015 | 6/3/2015 | P | PASS |
Phil Shearer
|
|
|
Josh Phone #: ###-####
|
BLD-Energy code compliance | 6/2/2015 | 6/2/2015 | 6/3/2015 | P | PASS |
Phil Shearer
|
|
|
Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PART |
Tony Young
|
|
|
Josh Phone #: ###-####,, c/n posted on plans,, see Josh,, seal draft stop, redo porch supports,, need soffit inspection,, ok to insulate
|
BLD-Wall Bracing | 5/19/2015 | 5/19/2015 | 5/19/2015 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Wall Bracing | 5/18/2015 | 5/19/2015 | 5/19/2015 | A | NR |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Wall Bracing | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | FAIL |
Tony Young
|
|
|
Josh Phone #: ###-####,, need to redo shear/brace panels per plan
|
BLD-Foundation | 4/15/2015 | 4/15/2015 | 4/15/2015 | P | PART |
Tony Young
|
|
|
JR Phone #: ###-####,, work in progress
|
BLD-Foundation | 4/14/2015 | 4/15/2015 | 4/15/2015 | A | NR |
Tony Young
|
|
|
JR Phone #: ###-####,, late am
|
BLD-Footing | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | PASS |
Tony Young
|
|
|
JR Phone #: ###-####
|
BLD-Footing | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | PART |
Tony Young
|
|
|
JR Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 4/14/2015 | 4/14/2015 | 4/14/2015 | | DONE |
Jason C. Taylor
|
|
|
* ALL FOOTINGS AND PADS**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | FAIL |
Tony Young
|
|
|
JR Phone #: ###-####,, need hillside report,, need reviewed plans to show rebar
|
Issue PAID IN FULL permit | | | 3/30/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 3/24/2015 | | |
|
|
|
|
Plan assigned to (JG) | | 3/11/2015 | 3/24/2015 | | DONE |
Javier Guzman
|
|
|
3/27 F L2 Hillside**
|
Routing - PLAN CHECK | | | 3/24/2015 | | PASS |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 3/24/2015 | | DONE |
|
|
|
|
Telephone call | | | 3/24/2015 | | DONE |
Candy A. Nichols
|
|
|
called George to let know permit is ready and how much is owed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2015 | | DONE |
|
|
|
All Requirements Met
|
1st review completed | | | 3/24/2015 | | DONE |
Javier Guzman
|
|
|
|
Routing - FIRE | 3/13/2015 | 3/11/2015 | 3/16/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to applicant. Attached report to case.
|
Routing - Erosion and Sediment | 3/13/2015 | | 3/13/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE)
WUI zone A, class A roof, Permit for the construction of a new 1401 sq. ft., two story (first story 641 sq. ft., second story 760 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 371 sq. ft. of covered patio/porch and a 472 sq. ft. attached garage per the approved plans
|
Routing - MECHANICAL | 3/12/2015 | | 3/13/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/12/2015 | | 3/12/2015 | | PASS |
David Moser
|
|
|
|
Routing - PUBLIC WORKS | 3/11/2015 | | 3/12/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | | | 3/11/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | | | 3/11/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/11/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 3/11/2015 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/11/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/23/2015 | | FAIL |
Christina Prado
|
|
|
Fuondation engineering, 2nd fl wall bracing & 3rd grading set
|
Application received | | 2/23/2015 | | | |
|
|
|
|