(CRADLEPOINT – Boise Building – 4th Floor and Basement) This permit is to add enclosed offices to the 40,315 square foot area Cradlepoint currently occupies on the 4th floor (Occupancy issued under BLD15-00133) and to reconfigure an exit hallway in the basement. All work must be in compliance with the approved plans. The fourth floor is actually 5 levels above grade. Work to include miscellaneous interior demolition work, new interior walls, interior doors, interior finish, fire sprinkler work, and electrical work. Existing ceiling to remain. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/14/20155/19/2015 DONE
This permit finaled on the web by Justin Dauby
First Notice4/10/20154/10/20155/4/2015 DONE
DetailsCandy A. Nichols
mailed first notice 5-4-15
BLD-Final4/9/20154/10/20154/10/2015APASS
DetailsJim Sly
Mark Phone #: ###-####
DOC - Permit Finaled4/10/20154/10/20154/10/2015PPASS
DetailsJim Sly
FIRE-Final Inspection4/9/20154/10/20154/10/2015APASS
DetailsTroy Cobbley
life safety passed
Letter of compliance/Occupancy  4/10/2015 DONE
BLD-Final4/8/20154/9/20154/9/2015PNR
DetailsDave Hannah
Mark Phone #: ###-#### faled fire
FIRE-Final Inspection4/3/20154/6/20154/6/2015APART
DetailsTroy Cobbley
Life safety passed on fourth floor only. Life safety will be ok to pass for basement scope of work wient permit is issued/passed for access control egress doors interconnection permit with the existing fire alarm system. This new work will require a permit.
BLD-Ceiling Grid Inspection3/27/20153/30/20153/30/2015APASS
DetailsDave Hannah
Mark Phone #: ###-####
FIRE-Conference3/17/20153/18/20153/18/2015ADONE
DetailsForrest France
On site conference and discussion with contractor regarding fire life safety inspection items, project related fire sprinkler and alarm work, egress door hardware, etc.
FIRE-Conference3/16/20153/17/20153/17/2015ADONE
DetailsForrest France
Regarding project schedule.
BLD-Framing/Rough-in3/10/20153/10/20153/10/2015PPART
DetailsTony Young
call half hour before // Mark Phone #: ###-####,, walls ok
BLD-Framing/Rough-in3/6/20153/10/20153/10/2015ADEFR
DetailsTony Young
call half hour before // Mark Phone #: ###-####,, needs ele 1st
Issue PAID IN FULL permit  3/5/2015 DONE
Plan assigned to (TLW)2/25/2015 3/3/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  3/3/2015 DONE
Case Summary (BLD)  3/3/2015 DONE
Permit Ready to Issue  3/3/2015 DONE
DetailsCandy A. Nichols
need GC & rev cert of val
Inspection Record Card- Bld  3/3/2015 DONE
Telephone call  3/3/2015 DONE
Call to Lowell
Routing - PLAN CHECK2/25/2015 3/2/2015 PASS
DetailsTim L. Woodard
Approved with Redlines for Occupancy Sensors. TLW
1st review completed  3/2/2015 DONE
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  2/25/2015 DONE
Recd Pcfee & Taken To Pln CK  2/25/2015 DONE
Application received 2/25/2015