PubWorks Occupancy Approval | 4/5/2016 | 4/5/2016 | 4/5/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####. Bond may be returned.
|
BLD-Final | 12/21/2015 | 12/22/2015 | 12/22/2015 | P | PASS |
Dave Hannah
|
|
|
Garage code is ''4444 enter''. Bond posted monday dec 21st for final drainage/re-vegetation inspection once weather allows. Call with questions. thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
DOC - Permit Finaled | 12/22/2015 | 12/22/2015 | 12/22/2015 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 12/21/2015 | 12/21/2015 | 12/21/2015 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Framing/Rough-in | 9/2/2015 | 9/3/2015 | 9/3/2015 | P | PASS |
Dave Hannah
|
|
|
Fire Box Inspection Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Framing/Rough-in | 9/1/2015 | 9/2/2015 | 9/2/2015 | P | CANC |
Dave Hannah
|
|
|
Fire box // Steve Phone #: ###-#### Inspection cancelled from web by: Kim Winkle
|
BLD-Energy code compliance | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Framing/Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PASS |
Dave Hannah
|
|
|
Fire blocking in basement to be reviewed Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Framing/Rough-in | 8/18/2015 | 8/18/2015 | 8/19/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Wall Bracing | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 8/16/2015 | 8/17/2015 | 8/17/2015 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Wall Bracing | 8/10/2015 | 8/12/2015 | 8/12/2015 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George. INstall the missing floor to floor straps at deck on ither side of door. Nail of STDH14 straps at south wall. Nail off bottom plates around coulmns at arched entry. Correction notice was posted.
|
BLD-Wall Bracing | 8/3/2015 | 8/3/2015 | 8/3/2015 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Foundation | 7/1/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 7/1/2015 | 7/1/2015 | 7/1/2015 | | DONE |
Jason C. Taylor
|
|
|
****MAIN LEVELL FOUNDATIONS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 6/28/2015 | 6/29/2015 | 6/29/2015 | A | NR |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. No city approved plans on site.
|
BLD-Foundation | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PART |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron basement walls ok
|
BLD-Footing | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PART |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron ok to place concrete basement ftgs
|
BLD-Footing | 6/2/2015 | 6/2/2015 | 6/3/2015 | P | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 5/19/2015 | 5/19/2015 | 5/19/2015 | | DONE |
Jason C. Taylor
|
|
|
* BASEMENT LEVEL ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/13/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/10/2015 | | |
|
|
|
|
Plan assigned to (JG) | | 3/24/2015 | 4/10/2015 | | PASS |
Javier Guzman
|
|
|
4/10 F L2 Hillside** (See Change of Status in Tdemark)
|
Routing - FIRE | 3/31/2015 | 3/24/2015 | 4/10/2015 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - PLAN CHECK | | | 4/10/2015 | | PASS |
Javier Guzman
|
|
|
|
Telephone call | | | 4/10/2015 | | DONE |
|
|
|
left message for Steve- told him fees and permit is ready for pick up
|
1st review completed | | | 4/10/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 4/10/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/10/2015 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/10/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - MECHANICAL | 4/1/2015 | | 4/1/2015 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 3/31/2015 | | 3/31/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION AND APPROVAL REQUIRED PRIOR TO EARTH DISTURBANCE)
WUI Zone A, class A roof, Permit for the construction of a new 4239 sq. ft., two story (first floor 2930 sq. ft., basement is 1309 sq. ft.) single family dwelling with 5 bedrooms, 4.5 bathrooms, approximately 556 sq. ft. of covered patio’s/porches and 1154 sq. ft. attached garage
|
Routing - MECHANICAL | 3/31/2015 | | 3/31/2015 | | FAIL |
Troy James
|
|
|
emailed ultimate heating
|
Routing - PLANNING | 3/30/2015 | | 3/31/2015 | | PASS |
David Moser
|
|
|
|
Routing - PUBLIC WORKS | 3/27/2015 | | 3/30/2015 | | PASS |
Jennifer Bruner
|
|
|
If there is no sewer stub to the lot, a sewer tap permit will be required from Public Works. ###-####
|
Routing - Addressing | 3/24/2015 | | 3/27/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Grading-Hillside | 3/24/2015 | | 3/27/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Intake Approval | | | 3/24/2015 | | PASS |
Christina Prado
|
|
|
CFH requirements and structural calcs requirements met
|
CHANGE STATUS TO (REV) | | | 3/24/2015 | | DONE |
Christina Prado
|
|
|
pending requirements met, changed status as review can now begin. Updated approval dates to show correct time frames for review
|
CHANGE STATUS TO (PND) | | | 3/10/2015 | | DONE |
Candy A. Nichols
|
|
|
Patty (?) with Syringa came in-Christina gave the plans back to her.
|
Telephone call | | | 3/3/2015 | | DONE |
Candy A. Nichols
|
|
|
Called Steve-left message on hi phone-we need eng stamped struc calcs and the P & Z permit 114
|
Routing PW Grading-Hillside | | | 3/3/2015 | | FAIL |
Jason C. Taylor
|
|
|
Application failed and returend to front counter techncian (Candy). Application missing P&Z hillside approval,structural engineering, and rock retaining wall engineering and plans. Jason Taylor ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 3/2/2015 | | DONE |
|
|
|
|
Intake Approval | | | 3/2/2015 | | FAIL |
Candy A. Nichols
|
|
|
Status changed to pending see 3/10/2015 JG
|
Recd Pcfee & Taken To Pln CK | | | 2/25/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 2/25/2015 | | DONE |
Candy A. Nichols
|
|
|
lmm that we need the 3rd set of grading and drainage plans before i can start the plans around
|
Application received | | 3/2/2015 | | | |
|
|
|
|