Telephone call | | | 2/28/2017 | | DONE |
|
|
|
business owner called-wanted C of O-i emailed it to him along with the fees due from final values-he said he'd get it paid
|
Print Statement | | | 2/8/2017 | | DONE |
|
|
|
1st statement, 90 days past due
|
Print Statement | | | 10/21/2016 | | DONE |
|
|
|
|
First Notice | | 9/24/2016 | 10/11/2016 | | DONE |
|
|
|
mailed 10-12-16
|
BLD-Final | 9/14/2016 | 9/14/2016 | 9/14/2016 | P | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
Permanent Occupancy | | | 9/14/2016 | | DONE |
|
|
|
|
BLD-Final | 9/6/2016 | 9/7/2016 | 9/12/2016 | P | NR |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Final | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | DEFR |
Jim Storey
|
|
|
Randy Phone #: ###-#### to wed pm
|
FIRE-Final Inspection | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/10/2016 | 8/11/2016 | 8/11/2016 | A | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-#### temp ok pending others
|
Temporary Occupancy | 8/11/2016 | 11/9/2016 | 8/11/2016 | | DONE |
Brittany Hill
|
|
|
|
BLD-Final | 8/9/2016 | 8/10/2016 | 8/10/2016 | A | NR |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
BLD-Final | 8/5/2016 | 8/8/2016 | 8/9/2016 | P | NR |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
FIRE-Final Inspection | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | PART |
Troy Cobbley
|
|
|
Pending approval of other trade inspection groups; a temporary occupancy is ok for life safety with Scott's permission. I need the project related fire alarm and fire sprinkler permits addressed, a permanant address, riser room signage, the swimming pool permit finaled, occupant load sign and door hardware for pool area installed.
|
FIRE-Final Inspection | 8/5/2016 | 8/8/2016 | 8/8/2016 | A | FAIL |
Troy Cobbley
|
|
|
Need to finish life safety. Today I verified smoke alarms, fire dept access, fire hydrants, need for new address numbers, ships ladder to roof. I let the contractor know that the separate permit for the swimming pool needs to be finaled prior to the main building being signed off. To finish out I need to have the project related fire alarm and fire sprinkler permits finaled, fire extinguishers verifed, exit signs and emergency light verified, door hardware, roof access signage, riser room signage, fire dept access signage.
|
Zoning Approval | 8/8/2016 | 8/8/2016 | 8/8/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Ceiling Grid Inspection | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
Jim Storey
|
|
|
Randy// 1st floor Phone #: ###-####
|
BLD-Other | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Jim Storey
|
|
|
Randy// cover inspection for a soffit Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PART |
Mike Jordan
|
|
|
Bob Phone #: ###-####// 1st floor vestible. Needs to hand patch pan decking were roof drain is.
|
BLD-Ceiling Grid Inspection | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Mike Jordan
|
|
|
Bob// 2nd floor Phone #: ###-####. 2nd floor corridor ok.
|
BLD-Ceiling Grid Inspection | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PASS |
Jim Storey
|
|
|
3rd and 4th floor // Bob Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | FAIL |
Jim Storey
|
|
|
Bob Phone #: ###-#### need clips/fire chalk
|
BLD-Other | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Jim Storey
|
|
|
hard lid; Bob Phone #: ###-#### drops 1st floor
|
BLD-Other | 6/9/2016 | 6/10/2016 | 6/10/2016 | A | PASS |
Jim Storey
|
|
|
upper hardlid, 2nd Floor: Bob Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Other | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Jim Storey
|
|
|
Randy// drop lid inspection for 2nd floor Phone #: ###-####
|
BLD-Final | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | CANC |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Other | 5/26/2016 | 5/27/2016 | 5/27/2016 | P | PASS |
Phil Shearer
|
|
|
hard lid rock ceiling; Keegan Phone #: 8091366. 3rd, 4th floor OK
|
BLD-Conference | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | PART |
Jim Storey
|
|
|
would like call ahead; Randy Phone #: ###-#### box spk pipe
|
BLD-Ceiling Grid Inspection | 5/19/2016 | 5/20/2016 | 5/20/2016 | P | FAIL |
Jim Storey
|
|
|
3rd, 4th floor; Keagan Phone #: ###-####
|
BLD-Framing/Rough-in | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Jim Storey
|
|
|
Randy// inspection for 1st floor Phone #: ###-####
|
BLD-Framing/Rough-in | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | PASS |
Jim Storey
|
|
|
1st floor; Randy Phone #: ###-####
|
BLD-Framing/Rough-in | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | PASS |
Jim Storey
|
|
|
RC resilance channel 1st floorceilling only
|
BLD-Energy code compliance | 4/28/2016 | 4/28/2016 | 4/28/2016 | P | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Framing/Rough-in | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | PART |
Jim Storey
|
|
|
Bob Phone #: ###-#### all but 2hr east shaft and stair
|
BLD-Other | 4/18/2016 | 4/19/2016 | 4/19/2016 | A | PASS |
Jim Storey
|
|
|
Randy-R C Channel Phone #: ###-####
|
BLD-Other | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Jim Storey
|
|
|
4th floor pony walls, 3rd floor vapor barrier/insulation; Bob Phone #: ###-#### 3 and 4 ok to cover
|
BLD-Framing/Rough-in | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PART |
Jim Storey
|
|
|
Fire caulking on 4th & 3rd - Randy Phone #: ###-#### wip/ plm ceilling 3rd ok
|
BLD-Other | 4/8/2016 | 4/11/2016 | 4/11/2016 | A | DEFR |
Jim Storey
|
|
|
Fire caulking on 4th & 3rd - Randy Phone #: ###-####
|
BLD-Other | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Jim Storey
|
|
|
Walt-fire stop mechanical shafts Phone #: ###-#### 4th floor
|
BLD-Wall cover | 4/1/2016 | 4/4/2016 | 4/4/2016 | A | PART |
Jim Storey
|
|
|
Inside // Bob Phone #: ###-#### 4th floor ok pending sharts w hvac
|
BLD-Energy code compliance | 4/1/2016 | 4/4/2016 | 4/4/2016 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-#### 4th floor r25 ok
|
BLD-Framing/Rough-in | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | PART |
Jim Storey
|
|
|
4th floor // Bob Phone #: ###-#### exterior walls ok to insulate
|
BLD-Framing/Rough-in | 3/8/2016 | 3/8/2016 | 3/8/2016 | P | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-#### corridors ok to cover1 thur 4
|
BLD-Framing/Rough-in | 3/1/2016 | 3/2/2016 | 3/2/2016 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-#### first floor ceilling ok to cover
|
BLD-Wall Bracing | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | PASS |
Jim Storey
|
|
|
Randy-strap and nail Phone #: ###-#### hardware and nailling ok on roof deck.
|
BLD-Wall Bracing | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | DEFR |
Jim Storey
|
|
|
Randy-strap and nail Phone #: ###-#### out of time rolled to am
|
BLD-Wall Bracing | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | PASS |
Jim Storey
|
|
|
Shear // Randy Phone #: ###-#### west/south/north up to off set roof drain up to 4 th floor exteior ok
|
OVERRIDE | | | 12/21/2015 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/21/2015 | | DONE |
Christina Prado
|
|
|
No fees for Plan mod - permit re-issued
|
Permit Ready to Issue | | | 12/21/2015 | | DONE |
Christina Prado
|
|
|
Plan mod - All requirements met
|
Routing PW Sewer Design | 10/21/2015 | | 12/18/2015 | | PASS |
Mike D Hedge
|
|
|
Approved in E-Plan Review. TLW
|
Plan assigned to (TLW) | 10/20/2015 | | 12/18/2015 | | PASS |
Tim L. Woodard
|
|
|
|
BLD-Other | 12/8/2015 | 12/9/2015 | 12/9/2015 | P | PASS |
Jim Storey
|
|
|
Diamond steel colimn grouting - Randy Phone #: ###-#### interiors ok
|
BLD-Other | 10/29/2015 | 10/30/2015 | 10/30/2015 | A | PASS |
Jim Storey
|
|
|
Slab pour // Randy Phone #: ###-####
|
BLD-Foundation | 10/27/2015 | 10/28/2015 | 10/28/2015 | A | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
Routing - PLAN CHECK | 10/21/2015 | | 10/21/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 10/21/2015 | | 10/21/2015 | | PASS |
Daryl Spivey
|
|
|
the building sewer for this project is an engineered system to be inspected by the design engineer in compliance with section 304.1 and appendix L of the idaho State Plumbing Code.
|
Routing - PUBLIC WORKS | 10/21/2015 | | 10/21/2015 | | PASS |
Beverly Mountain
|
|
|
|
Plan Modification Accepted | | | 10/20/2015 | | DONE |
Christina Prado
|
|
|
Received request for plan mod from architect. Plan mod for changes to the storm drain system
|
BLD-Foundation | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PEND |
Dave Hannah
|
|
|
Randy Phone #: ###-#### ok after spec inspection sign off
|
BLD-Footing | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####pwsi
|
BLD-Foundation | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | PART |
Jim Storey
|
|
|
Randy Phone #: ###-#### placed w si
|
BLD-Footing | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PART |
Jim Storey
|
|
|
Bob Phone #: ###-####wip /psi
|
BLD-Foundation | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PART |
Jim Storey
|
|
|
would like early as possible; Randy Phone #: ###-#### placed w/si pending report
|
BLD-Foundation | 9/14/2015 | 9/17/2015 | 9/17/2015 | P | PART |
Jim Storey
|
|
|
Pouring at 12:30 - Randy Phone #: ###-#### placed w/si pending report
|
BLD-Footing | 9/14/2015 | 9/15/2015 | 9/15/2015 | A | PASS |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Footing | 8/27/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Jim Storey
|
|
|
Change day per Randy Phone #: ###-#### si pending /rebar ok from10-25 a -d // 25 - 20
|
Telephone call | | | 8/17/2015 | | DONE |
|
|
|
called contractor and notified them that the permit has been paid for and is ready to be picked up.
|
Issue PAID IN FULL permit | | | 8/17/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/17/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 8/12/2015 | | |
|
|
|
|
Expiration Notice | 8/12/2015 | 9/2/2015 | 8/12/2015 | | DONE |
Brittany Hill
|
|
|
|
Permit Ready to Issue | | | 8/12/2015 | | DONE |
Christina Prado
|
|
|
Need RP, GC & Revised cert of value for issuance- ALL REQUIRMENTS MET 8-12-15 //CEV
|
Routing PW Street Lights | 8/11/2015 | | 8/11/2015 | | PASS |
Mike D Hedge
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2015 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 4/15/2015 | | 8/11/2015 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete
|
Routing - PLAN CHECK | 7/22/2015 | | 8/4/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 7/22/2015 | | 8/4/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Street Lights | 7/22/2015 | | 7/23/2015 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - FIRE | 7/22/2015 | | 7/22/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case
|
Routing - PLAN CHECK | 6/10/2015 | | 6/24/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 6/17/2015 | 6/17/2015 | 6/19/2015 | | FAIL |
Katie Marron
|
|
|
Previous fire resubmittal items have not been adequately addressed.
|
Routing - MECHANICAL | 6/16/2015 | | 6/16/2015 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 6/11/2015 | | 6/11/2015 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - Design Review | 6/10/2015 | | 6/11/2015 | | PASS |
Josh Wilson
|
|
|
Ok per revised exterior elevations
|
Route to Impact Fee Review | 5/7/2015 | 5/10/2015 | 5/12/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Sewer Design | 4/15/2015 | | 5/7/2015 | | PASS |
Mike Sheppard
|
|
|
Per E-Plan Review. TLW
|
1st review completed | | | 5/7/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/15/2015 | | 5/7/2015 | | PASS |
Tim L. Woodard
|
|
|
Corrections required. TLW
|
Routing - PLAN CHECK | 4/15/2015 | | 5/4/2015 | | FAIL |
Tim L. Woodard
|
|
|
Corrections noted as changemarks in E-Plan Review. TLW
|
Routing PW Drainage | 4/15/2015 | | 4/28/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 4/15/2015 | | 4/27/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing - FIRE | 4/15/2015 | | 4/24/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to architect. Attached report to case.
|
Routing - MECHANICAL | 4/15/2015 | | 4/21/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 4/15/2015 | | 4/17/2015 | | PASS |
Daryl Spivey
|
|
|
6 inch sewer line shall be ran at 1/4 inch per foot to accomodate fixture loading at point marked on plan.
|
Routing - Design Review | 4/15/2015 | | 4/17/2015 | | FAIL |
Josh Wilson
|
|
|
Elevations do not comply with conditions of approval from DRH14-00415.
|
Routing PW Sewer Rating | 4/15/2015 | | 4/16/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING Land Div | 4/15/2015 | | 4/16/2015 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 4/15/2015 | | 4/15/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/15/2015 | | 4/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 4/15/2015 | | 4/15/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBING ACTIVITIES)
4 story hotel (HOLIDAY INN EXPRESS & SUITES) Construct a new 4 story hotel building and related site improvments.
|
Routing PW Street Lights | 4/15/2015 | | 4/15/2015 | | FAIL |
Mike D Hedge
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/15/2015 | | DONE |
|
|
|
|
Intake Approval | | | 4/14/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 4/3/2015 | | FAIL |
|
|
|
4-3-15
we are unable to accept the plans prior to the DR approval. For questions on the DR contact Josh Wilson at ###-####
Please provide a building envelope compliance
Please provide a window schedule.
|
Application received | | | 2/26/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 26 2015 11:49AM
|
Intake Approval | | | 2/26/2015 | | FAIL |
|
|
|
Please review the Eplan review submittal requirements. All plan sheets are required to be individually uploaded and not as a single packet contact Alex DeYoung with any upload requirement questions (###-####)
Provide form 520 submittal checklist with all required items.
|