DOC - Permit Finaled | | | 12/29/2015 | | |
|
|
|
pass 5-11-15
|
BLD-Final | 5/6/2015 | 5/7/2015 | 5/11/2015 | A | PASS |
Dave Hannah
|
|
|
Lincoln Phone #: ###-#### ok to final I reveiwed submitted engineering everything checkes out .
|
Override - Parcel Holds | 5/6/2015 | 1/1/1900 | 5/6/2015 | | |
|
|
|
as per David Hannah-schedule inspection-Lincoln Lewis is emailing the engineered plans to him and the plans will be at the job site
|
Routing Walk-In (Zoning) | 2/27/2015 | 2/27/2015 | 2/27/2015 | A | PASS |
Scott Beecham
|
|
|
as fper p& z ok/pass
|
Routing Walk-In (BLD) | 2/27/2015 | 2/27/2015 | 2/27/2015 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 2/27/2015 | 2/27/2015 | 2/27/2015 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2015 | | DONE |
|
|
|
|
1st review completed | | | 2/27/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2015 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2015 | | |
|
|
|
|
Override - Parcel Holds | | | 2/27/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 2/27/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/27/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/27/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 2/27/2015 | | | |
|
|
|
|