Telephone call | | | 9/17/2015 | | DONE |
|
|
|
Spoke with Clay Keller about the final values given for MEC and ELE. He stated that he was out of the office and had someone else fill out the paper work. Said after looking at it the numbers on those are wrong and that he will redo the final value and send the correct numbers in
|
First Notice | 8/24/2015 | 8/24/2015 | 9/15/2015 | | DONE |
Candy A. Nichols
|
|
|
mailed 9-15-15
|
Print Statement | | | 9/15/2015 | | DONE |
|
|
|
|
BLD-Final | 8/20/2015 | 8/21/2015 | 8/24/2015 | P | PASS |
Jim Sly
|
|
|
Jeff Phone #: ###-####
|
DOC - Permit Finaled | 8/24/2015 | 8/24/2015 | 8/24/2015 | P | PASS |
Jim Sly
|
|
|
|
Zoning Approval | 8/21/2015 | 8/21/2015 | 8/21/2015 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 8/13/2015 | 8/19/2015 | 8/19/2015 | P | PART |
Jim Storey
|
|
|
Change day and time per Jeff Phone #: ###-#### need health and zonning sign offs
|
FIRE-Final Inspection | 8/13/2015 | 8/17/2015 | 8/17/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
BLD-Ceiling Grid Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 | P | PASS |
Jim Storey
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Jim Storey
|
|
|
late morning - Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Jim Storey
|
|
|
late morning - Jeff Phone #: ###-####
|
BLD-Final | 7/6/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Jim Storey
|
|
|
Jeff Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/21/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/21/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/16/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 3/16/2015 | 3/16/2015 | 4/16/2015 | | PASS |
Carl Westfall
|
|
|
STARBUCKS - Level 3 TI - ePlanReview (15 days - April 1)
|
Routing - PLUMBING | 4/13/2015 | | 4/16/2015 | | PASS |
Bill VanDegrift
|
|
|
1) r.p. required upstream of filtered water system
2) additional cross connection protection will be required at the equipment.
3) increase venting to comply with the Idaho State Plumbing code
4) two inch minimum waste below slab
5) flow control must be accesible
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/16/2015 | | DONE |
|
|
|
need responsible person for issuance
|
Routing - Design Review | 4/13/2015 | | 4/13/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 4/10/2015 | | 4/13/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved after the resubmittal review
|
Plan resubmittals received | | | 4/10/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/2/2015 | | DONE |
|
|
|
|
1st review completed | | | 4/2/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/16/2015 | | 4/2/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing Off Site - C.D.H | 3/16/2015 | | 3/30/2015 | | PASS |
Carl Westfall
|
|
|
Lori Badigian
|
Routing - FIRE | 3/16/2015 | 3/16/2015 | 3/23/2015 | | PASS |
Scott Arellano
|
|
|
No separate comments attached. Approved as shown.
|
Routing PW Environmental | 3/16/2015 | | 3/23/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing - Design Review | 3/16/2015 | | 3/19/2015 | | FAIL |
Sarah Schafer
|
|
|
Sarah Schafer - New exterior trellis and new exterior roll-up door in east elevation - Zoning Certificate required for exterior changes. Applicant has been notified and will file within the next 24 hours.
|
Routing - Erosion and Sediment | 3/16/2015 | | 3/17/2015 | | PASS |
Evan Jenkins
|
|
|
(STARBUCKS) Major interior remodel of an existing Starbucks store. The remodel includes but is not limited to new lighting, new interior and exterior furniture, and new cafe finishes and ceiling treatment. The remodel also includes a reconfigured back bar with new and reused equipment. The existing workroom will remain untouched and the restrooms will receive new finishes only with all existing equipment and items to remain. New garage door to be installed on the east facade and replace the current storefront system. A new trellis with heaters and lighting will be added to the exterior seating area.
|
Routing PW Sewer Rating | 3/16/2015 | | 3/17/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLUMBING | 3/16/2015 | | 3/17/2015 | | FAIL |
Bill VanDegrift
|
|
|
1) remove "not for construction" from all plumbing plans.
2) show location of filtered water system with r.p. back flow preventor upstream.
3) size venting per Idaho State Plumbing Code
4) 2" min. piping below slab per Idaho Plumbing Code.
5) show location and type of cross connection protection on all equipment.
|
Routing - Addressing | 3/16/2015 | | 3/16/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 3/16/2015 | | 3/16/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Pending Assignment by JCB | 3/16/2015 | | 3/16/2015 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 3/12/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by John Menard and plan review fees paid.
|
Intake Approval | | | 3/3/2015 | | FAIL |
John Menard
|
|
|
Please submit Energy Lighting ComCheck showing compliance with the 2012 IECC. Also please revise the cover sheet to reference the 2012 IECC.
|
Application received | | | 2/27/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 27 2015 12:55PM
|