Telephone call | | | 8/19/2015 | | DONE |
Rita DeYoung
|
|
|
contated Melissa (Applicant) Arch and Eng cost includes and furniture cost was included.
|
Telephone call | | | 8/19/2015 | | DONE |
|
|
|
Left a message for Jeffrey to check that the final value for the ELE was correct because he gave the difference of 10,197 from what the initial value was
|
First Notice | | 7/23/2015 | 8/10/2015 | | DONE |
Christina Prado
|
|
|
mailed 8/11/15
|
Print Occupancy Form | | | 7/13/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/13/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Temporary Occupancy | 7/1/2015 | 9/29/2015 | 7/1/2015 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 7/1/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-#### final ok pending fire sign off for pull station
|
FIRE-Final Inspection | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given until the existing manual pull station has been relocated back to its original position. All other life safety items appear ok.
|
BLD-Ceiling Grid Inspection | 6/1/2015 | 6/2/2015 | 6/2/2015 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
FIRE-Conference | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | DONE |
Katie Marron
|
|
|
Fire conference on relocation of existing fire extinguisher and pull station per note on plans. Existing fire extinguisher cabinet placement is still acceptable. Fire pull to move to adjacent wall and to the side of fire extinguisher cabinet.
|
BLD-Framing/Rough-in | 5/4/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Jim Storey
|
|
|
Call 5 min before to be let in // John Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2015 | | |
|
|
|
|
Routing - PLAN CHECK | 3/30/2015 | | 4/2/2015 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/2/2015 | | DONE |
|
|
|
Need Revised Cert of Value and GC Form-4-13-15-Candy has the GC and Rev cert of val. Fees have been put in system
|
Plan assigned to (TLW) | 3/5/2015 | | 4/2/2015 | | PASS |
Tim L. Woodard
|
|
|
Greenbelt Marker BOI
|
Plan resubmittals received | | | 3/30/2015 | | DONE |
Tim L. Woodard
|
|
|
Revised occupant load calculation on cover sheet for 2nd floor retail. TLW
|
Routing - PLAN CHECK | 3/5/2015 | | 3/19/2015 | | FAIL |
Tim L. Woodard
|
|
|
Waiting to sign off in e-plan. TLW
|
1st review completed | | | 3/19/2015 | | DONE |
Tim L. Woodard
|
|
|
Failed plan review. TLW
|
Routing PW Sewer Rating | 3/6/2015 | | 3/10/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PUBLIC WORKS | 3/5/2015 | | 3/6/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Application received | | | 3/5/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 5 2015 10:19AM
|
Intake Approval | | | 3/5/2015 | | FAIL |
|
|
|
The City of Boise adopted the 2012 International Energy Code as of January 1st 2015. Please revise cover sheet, sheet E3-1 and any necessary sheets required to address the change.
|
Intake Approval | | | 3/5/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Addressing | 3/5/2015 | | 3/5/2015 | | PASS |
Emily Dixon
|
|
|
|