BLD-Aging Inspection | 7/8/2016 | 7/8/2016 | 7/8/2016 | | DONE |
Tony Young
|
|
|
no inspection,, done
|
DOC - Permit Finaled | 7/8/2016 | 7/8/2016 | 7/8/2016 | P | PASS |
Tony Young
|
|
|
done
|
PubWorks Occupancy Approval | 4/5/2016 | 4/5/2016 | 4/5/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Bond may be returned.Jason Taylor ###-####.
|
BLD-Grading Inspection | 3/17/2016 | 3/17/2016 | 3/18/2016 | P | CANC |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Foundation | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, work in progress on retaining wall
|
Reopen Permit (ISS) | | | 2/25/2016 | | DONE |
|
|
|
per Jason Taylor
|
BLD-Final | 1/19/2016 | 1/20/2016 | 1/20/2016 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
DOC - Permit Finaled | 1/20/2016 | 1/20/2016 | 1/20/2016 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 1/15/2016 | 1/19/2016 | 1/19/2016 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, need handrails per code,, need address per code,,
|
PubWorks Occupancy Approval | 1/14/2016 | 1/14/2016 | 1/14/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading, retaining walls, and revegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Footing | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | CANC |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | FAIL |
Tony Young
|
|
|
Pat Phone #: ###-####,, need engineering and plan approved for new retaing wall prior to final,, also still need soils report for same
|
BLD-Footing | 12/16/2015 | 12/16/2015 | 12/16/2015 | P | PEND |
Tony Young
|
|
|
Pat Phone #: ###-####,,, need soils report approved by public works
|
BLD-Footing | 12/15/2015 | 12/15/2015 | 12/15/2015 | P | CANC |
Tony Young
|
|
|
Pat Phone #: ###-####,, not ready for the retaining wall footing
|
BLD-Other | 10/15/2015 | 10/15/2015 | 10/16/2015 | P | PASS |
Tony Young
|
|
|
Wiring inspection in soffit boxes for can lights. Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Other | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | PASS |
Tony Young
|
|
|
Wiring inspection in soffit boxes for can lights. Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Other | 10/13/2015 | 10/14/2015 | 10/15/2015 | P | NR |
Tony Young
|
|
|
Wiring inspection in soffit boxes for can lights. Phone #: ###-#### Inspection requested via web by SHANE JAYO,, electrical ok
|
BLD-Energy code compliance | 10/8/2015 | 10/9/2015 | 10/9/2015 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, need interior stairs,, need soffit issue resolved,, ok to sheet rock if needed,, BUT.. now is a good time to resolve soffit issue due to being able to see some from inside
|
BLD-Framing/Rough-in | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PART |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO. Stairs not complete.
|
Plan Modification Accepted | | | 9/3/2015 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 9/3/2015 | | 9/3/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Other | 8/26/2015 | 8/26/2015 | 8/26/2015 | P | FAIL |
Tony Young
|
|
|
Shane- ###-####/// this inspection is for the soffit
|
BLD-Other | 8/25/2015 | 8/26/2015 | 8/26/2015 | A | FAIL |
Tony Young
|
|
|
Shane- ###-####/// this inspection is for the soffit,, needs electrical pass for soffits
|
BLD-Other | 8/24/2015 | 8/25/2015 | 8/25/2015 | A | NR |
Tony Young
|
|
|
Shane- ###-####/// this inspection is for the soffit,, needs electrical 1st
|
BLD-Other | 8/21/2015 | 8/24/2015 | 8/24/2015 | A | NR |
Tony Young
|
|
|
Shane- ###-####/// this inspection is for the soffit need electrical rough in 1st
|
BLD-Other | 8/20/2015 | 8/21/2015 | 8/21/2015 | A | NR |
Tony Young
|
|
|
Shane- ###-####/// this inspection is for the soffit need electrical 1st,, ok to cover other areas without electrical
|
BLD-Other | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PART |
Tony Young
|
|
|
Shane- ###-####/// this inspection is for the can light ,, boxes for lights ok,, still need electrical inspection prior to cover,, ok to start soffit areas without electrical
|
PubWorks Subgrade Approval | 6/11/2015 | 6/11/2015 | 6/11/2015 | | DONE |
Jason C. Taylor
|
|
|
**GARAGE FOOTINGS**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
PubWorks Subgrade Approval | 6/3/2015 | 6/3/2015 | 6/3/2015 | | DONE |
Jason C. Taylor
|
|
|
* SINGLE STORY PORTION ON EAST SIDE**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | NR |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Wall Bracing | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | NR |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 5/14/2015 | 5/15/2015 | 5/15/2015 | A | FAIL |
Tony Young
|
|
|
Pat// ###-####,, need soils report
|
BLD-Foundation | 5/14/2015 | 5/14/2015 | 5/14/2015 | P | NR |
Tony Young
|
|
|
Pat// ###-####
|
BLD-Footing | 5/6/2015 | 5/7/2015 | 5/7/2015 | A | FAIL |
Tony Young
|
|
|
Chris// pour time 12pm Phone #: ###-####,, need soils approval 1st
|
BLD-Footing | 5/6/2015 | 5/6/2015 | 5/6/2015 | P | PEND |
Tony Young
|
|
|
Chris// pour time 12pm Phone #: ###-####
|
BLD-Footing | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | FAIL |
Tony Young
|
|
|
Chris// pour time 12pm Phone #: ###-####,, need soils 1st,, then ok to pour
|
BLD-Footing | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | NR |
Tony Young
|
|
|
Chris// pour time 12pm Phone #: ###-####,, need soils report 1st,, then ok
|
Issue PAID IN FULL permit | | | 5/5/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 5/4/2015 | | |
|
|
|
|
Plan assigned to (JG) | 4/7/2015 | 4/7/2015 | 5/4/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 4/23 TH L2 Hilside***
|
Routing PW Grading-Hillside | 4/7/2015 | | 5/4/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Inspection Record Card- Bld | | | 5/4/2015 | | DONE |
|
|
|
|
Telephone call | | | 5/4/2015 | | DONE |
|
|
|
called Shane to let know permit is ready and how much is owed-left message on office phone
|
Case Summary (BLD) | | | 5/4/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/4/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/4/2015 | | DONE |
|
|
|
All requirements met
|
Routing - PLAN CHECK | 4/22/2015 | | 5/4/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 4/22/2015 | 4/22/2015 | 4/27/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
1st review completed | | | 4/22/2015 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 4/7/2015 | | 4/22/2015 | | FAIL |
Javier Guzman
|
|
|
emailed review report to applicant
|
Plan resubmittals received | | | 4/16/2015 | | DONE |
|
|
|
received two copies of sheet 1 of 15- put with plans
|
Routing - MECHANICAL | 4/16/2015 | | 4/16/2015 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 4/14/2015 | | 4/15/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to applicant. Attached report to case.
|
Routing - Erosion and Sediment | 4/13/2015 | | 4/14/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION AND APPROVAL REQUIRED PRIOR TO EARTH DISTURBANCE)
Located on Lot 3, Block 8. Construction of a residential buliding, connection of utilities, concrete hardscape, and landscaping. Reference GRD15-00009 for Grading. WUI zone A, class A roof, Permit for the construction of a new 3,863 sq. ft., three story (upper level 2,249 sq. ft., lower level 573 sq. ft., basement 1,041) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 308 sq. ft. of covered patio/porch and a 980 sq. ft. attached garage
|
Routing - MECHANICAL | 4/10/2015 | | 4/13/2015 | | FAIL |
Troy James
|
|
|
emailed corrections to idaho hvac
|
Routing - Addressing | 4/8/2015 | | 4/10/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 4/10/2015 | | 4/10/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 4/10/2015 | | 4/10/2015 | | PASS |
Brent Moore
|
|
|
Extension off west side of garage is not allowed. Eaves on the garage may only extend 2' out on the west side.
|
Intake Approval | | | 4/7/2015 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/7/2015 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 3/6/2015 | | 3/11/2015 | | FAIL |
Jason C. Taylor
|
|
|
Need CAT II Hillside Application prior to Building Permit Plan Intake. Jason Taylor ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 3/6/2015 | | DONE |
|
|
|
|
Intake Approval | | | 3/6/2015 | | FAIL |
|
|
|
contacted Jayo const. to go through the CFH process with planning
|
Recd Pcfee & Taken To Pln CK | | | 3/6/2015 | | DONE |
|
|
|
|
Application received | | 3/6/2015 | | | |
|
|
|
|