DOC - Permit Finaled | | | 10/31/2017 | | DONE |
Jim Sly
|
|
|
Jim Sly passed final on 7-6-2016
|
BLD-Final | 7/6/2016 | 7/6/2016 | 7/6/2016 | P | PASS |
Jim Sly
|
|
|
Bond for paved driveway, grading and re-vegetation and stabilization has been put in place per Jason Taylor - BND16-00072 Phone #: ###-#### Inspection requested via web by Gary Beck All inspections appear to be OK........Structural inspection OK except items on Bond scope of work by Jason Taylor.
|
PubWorks Occupancy Approval | 7/5/2016 | 7/5/2016 | 7/5/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Aging Inspection | 4/22/2016 | 4/22/2016 | 4/22/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Wall cover | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck
|
BLD-Energy code compliance | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck
|
BLD-Framing/Rough-in | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck
|
BLD-Framing/Rough-in | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck. Fireblock mech chase at ceiling level in masterbedroom, fireblock all furouts in basement. Ok to insulate.
|
BLD-Wall cover | 11/10/2015 | 11/10/2015 | 11/10/2015 | P | PASS |
Phil Shearer
|
|
|
Shear// Garry Phone #: ###-####
|
Telephone call | | | 10/23/2015 | | DONE |
|
|
|
called Gary to let know that the plan mod plans have not been pickewd up yet. i told him there would be a hold on the permit until they come in and pick it up
|
Routing PW Grading-Hillside | 7/13/2015 | | 7/13/2015 | | PASS |
Jason C. Taylor
|
|
|
New plans have been approved, shallow injection well approved. Jason Taylor ###-####.
|
Telephone call | | | 7/13/2015 | | DONE |
|
|
|
called Gary to let know plan mod was ready.
|
BLD-Foundation | 7/8/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
Plan Modification Accepted | | | 7/7/2015 | | DONE |
|
|
|
Plans taken to Jason Taylor. Two copies of Letter, two copies of Shallow Injection Well Inventory Form, Two copies of Sheets CS-101 and CG-101. BLH
|
BLD-Footing | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | PASS |
Phil Shearer
|
|
|
Jay Phone #: ###-####
|
OVERRIDE | | | 7/6/2015 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/6/2015 | | DONE |
Christina Prado
|
|
|
|
Routing PW Grading-Hillside | 7/6/2015 | | 7/6/2015 | | PASS |
Jason C. Taylor
|
|
|
Need as-built plans and shallow injection well form. JCT
|
Telephone call | | | 7/6/2015 | | DONE |
|
|
|
Spoke with Cat and informed her that the Revised Plans for Structural were ready. She stated she would wait for Jason T side to be done to pick them all up at the same time.
|
CHANGE STATUS TO (ISS) | | | 7/6/2015 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/6/2015 | | DONE |
Christina Prado
|
|
|
Jason Taylor will accept plans as is now and will require as-builts prior to Final structural inspection is approved
|
Plan assigned to (AJS) | 6/22/2015 | 6/22/2015 | 7/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
plan modification
|
Routing - PLAN CHECK | 6/23/2015 | | 7/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
structural changes to foundaion and roof framing
|
Routing PW Grading-Hillside | 6/30/2015 | | 7/2/2015 | | FAIL |
Jason C. Taylor
|
|
|
Revised plans needed.
1. 2 Copies of the IDWR Shallow Injection Well Form
2. 3 Copies of the revised grading and drainage plans with the following modifications:
a. Place rip-rap at roof drain daylight locations
b. Need swales on the side yards that direct water to the rear yard area.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2015 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 6/30/2015 | | DONE |
|
|
|
plan mod submitted 2 sets of each CS-101, CG-101, S-2.0, S-2.2, truss & truss modification calcs-took Adele
|
Plan resubmittals received | | | 6/22/2015 | | DONE |
|
|
|
received; site plan (CS-101), grading plan (CG-101), foundation plan (S-1.0)
|
BLD-Foundation | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 6/5/2015 | 6/5/2015 | 6/5/2015 | A | PART |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears. Garage footing ok
|
BLD-Footing | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PART |
Phil Shearer
|
|
|
Request inspection about 2 Phone #: ###-#### Inspection requested via web by Ben Sears. Basement footings only.
|
PubWorks Subgrade Approval | 6/3/2015 | 6/3/2015 | 6/3/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/7/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 3/31/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 3/21/2015 | 3/21/2015 | 3/31/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed 3/26 TH L2 Hillside**
|
Telephone call | | | 3/31/2015 | | DONE |
|
|
|
Call to Gary
|
Routing - PLAN CHECK | 3/31/2015 | | 3/31/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 3/31/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/31/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/31/2015 | | DONE |
|
|
|
requirements met
|
Routing - PLAN CHECK | 3/23/2015 | | 3/30/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
need revised structural sheets stamped by engineer will leave up front to be picked up per applicants request.
need cover of structral cals cover sheet with stamp.
|
Plan resubmittals received | | | 3/30/2015 | | DONE |
|
|
|
resubmittals recieved 2 sets of each-S-1.0, & S-2.0-took to Adele S
|
Plan resubmittals received | | | 3/24/2015 | | DONE |
|
|
|
received an 8x10 copy of site plan and 2 copies of sheet A-1.0- gave to Colleen Carroll
|
1st review completed | | | 3/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Plan resubmittals received | | | 3/23/2015 | | DONE |
|
|
|
received 2 copies of sheets A-2.2, A-3.1, S-1.0, S-2.0- put on Adele's desk
|
Routing - PLAN CHECK | 3/20/2015 | | 3/23/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
designer is resubmitting a new layout for building and site, no review done will review when plans submitted.
|
Plan assigned to (JG) | | 3/10/2015 | 3/21/2015 | | DEFR |
Javier Guzman
|
|
|
3/26 TH L2 Hillside**
|
Route to Impact Fee Review | 3/10/2015 | 3/13/2015 | 3/16/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 3/13/2015 | 3/10/2015 | 3/16/2015 | | PASS |
Scott Arellano
|
|
|
Approved as shown. This project has been evaluated for Fire Department Vehicle Access and Fire Hydrant availability.
|
Routing - Erosion and Sediment | 3/13/2015 | | 3/13/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE)
The construction of a new 4332 sq. ft., two story (first story 2556 sq. ft., second story 683 sq. ft., basement is 1093 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 660 sq. ft. of covered patio’s/porches and 1200 sq. ft. attached garage per the approved plans,
|
Routing - MECHANICAL | 3/12/2015 | | 3/13/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/12/2015 | | 3/12/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | 3/11/2015 | | 3/12/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 3/11/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 3/10/2015 | | 3/11/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/10/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 3/10/2015 | | PASS |
Candy A. Nichols
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/10/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 3/10/2015 | | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 6/23/2015 | | | | |
Jason C. Taylor
|
|
|
|