Permit Information
Permit NumberBLD15-00669
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 10482 W UTAHNA RD
Project NameVineyard at Eagle Promenade
Customer Number 
ePlanReviewYes
Description
(VINEYARD AT EAGLE PROMENADE – APARTMENT BUILDING) (11-3-15 PLAN MODIFICATION TO DUCT OUTSIDE AIR TO EACH AIR HANDLING UNIT THAT SERVES EACH APARTMENT.) An NFPA 13-R fire sprinkler system is required for occupancy. To construct a new 37,353 square foot apartment building for seniors (19,283 square feet 1st story and 18,070 square feet 2nd story). A total of 30 dwelling units will be provided. Occupants do not live in a supervised environment and do not receive custodial care (i.e. this building is not an I-1 Occupancy). Two dwelling units will comply as Type A and 28 dwelling units will comply as Type B. Work is to include concrete footings, concrete piers, concrete stem walls, concrete slabs on grade, exterior wood stud bearing walls, interior wood stud bearing walls, wood beams, wood columns, wood shear walls, a wood joist floor system, a wood truss roof system, architectural laminated asphalt roof shingles, horizontal lap hardboard siding, board and batten style hardboard siding, shake style hardboard siding, manufactured stone veneer wainscot, interior 1-hr corridors, interior 1-hr stairway enclosures, interior doors, exterior doors, exterior windows, a gas fireplace, millwork, and finishes. A separate permit is required for the solar panels on the roof. Special Inspection is required for soils, concrete, and post installed anchors to concrete. The engineered trusses are a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. A blower door test will be required for each dwelling unit to show that the air changes per hour are not less than 5 and not more than 7, otherwise, an outside air duct connected to each return air plenum is required. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/25/20165/5/2020 DONE
This permit finaled on the web by Samantha Tallman
BLD-Final4/14/20164/15/20164/15/2016PPASS
DetailsTony Young
Keegan Phone #: ###-####,, ok for c of o
FIRE-Final Inspection4/14/20164/15/20164/15/2016APASS
DetailsJim Page
Overhead fire sprinkler inspection complete (FIR15-00687), fire sprinkler underground inspection complete (FIR15-00547), fire alarm inspection complete (FIR15-00911) fire alarm communicator inspection complete (FIR16-00262). Fire extinguishers in place with current inspection tags, egress illumination verified (interior and discharge landing). Final life fire safety inspection passed/complete.
FIRE-Final Inspection4/14/20164/15/20164/15/2016PCANC
DetailsKatie Marron
Keegan Phone #: ###-####
Permanent Occupancy  4/15/2016 DONE
Zoning Approval4/14/20164/14/20164/14/2016 DONE
DetailsAndrea Tuning
BLD-Conference3/29/20163/30/20163/30/2016PDONE
DetailsMike Jordan
Keegan Phone #: ###-####
BLD-Other2/24/20162/24/20162/24/2016PPART
DetailsJim Sly
Keegan// fire calking inspection for the first floor corridor Phone #: ###-####
All firestopping above hard ceiling in main floor corridor......OK
BLD-Other2/16/20162/17/20162/17/2016ANR
DetailsTony Young
Fire caulking - Keegan Phone #: ###-####,, need to add some in areas in main floor corridor
BLD-Conference1/28/20161/29/20161/29/2016APEND
DetailsTony Young
Solar Panel; Keagan Phone #: ###-####,,
BLD-Conference1/27/20161/28/20161/28/2016APEND
DetailsTony Young
Solar Panel; Keagan Phone #: ###-####,, need to verify
BLD-Other1/26/20161/27/20161/27/2016APEND
DetailsTony Young
Solar Panel; Keagan Phone #: ###-####,, will need fire and electrical approval 1st,, need to verify this was part of scope of the work,, need to verify trusses were designed for added load
BLD-Other1/20/20161/21/20161/21/2016APART
DetailsTony Young
Fire caulking east 7 lower units - Keegan Phone #: ###-####,, east 7 units ok,,
BLD-Other1/19/20161/20/20161/20/2016APART
DetailsTony Young
Fire caulking - Keegan Phone #: ###-####,, work in progress,, 7 lower east side,, ok
BLD-Framing/Rough-in1/15/20161/15/20161/17/2016PPART
DetailsTony Young
Keagan Phone #: ###-####,, upper east 7 units ok
BLD-Framing/Rough-in12/29/201512/31/201512/31/2015APART
DetailsTony Young
Keagan Phone #: ###-####,, 2nd phase ok to prerock
BLD-Framing/Rough-in12/17/201512/18/201512/18/2015APART
DetailsTony Young
Kegan Phone #: ###-####,, work in progress,, ok to insulate
BLD-Conference12/17/201512/17/201512/17/2015PDEFR
DetailsTony Young
Kegan Phone #: ###-####
BLD-Framing/Rough-in12/11/201512/14/201512/14/2015APART
DetailsTony Young
Keagan Phone #: ###-####,, ok to continue,, phase one,, west 8 units,, with insulation,, need to see prior to cover,, needs sprinkler inspection to see tenting also
BLD-Framing/Rough-in12/10/201512/11/201512/11/2015APART
DetailsTony Young
Keagan Phone #: ###-####,, need sprinkler rough in pass,, mech is ok for now, the rest will be below drop ceiling,, prior corrections done,, also ok to procede with washer boxes
BLD-Framing/Rough-in12/7/201512/8/201512/8/2015APART
DetailsTony Young
First Floor framing - Keagan Phone #: ###-####,,
walk through only with plan reviewer, mechanical inspection reviewer.. need to finish and recall
BLD-Conference12/3/201512/4/201512/4/2015PPART
DetailsTony Young
Keagan Phone #: ###-####,, frame ?s
BLD-Framing/Rough-in11/24/201511/25/201511/25/2015ACANC
DetailsTony Young
Keigan Phone #: ###-####
BLD-Wall cover11/12/201511/13/201511/13/2015APART
DetailsJim Sly
Shear // Keegan Phone #: ###-####
South side of Bldg.......OK.
BLD-Framing/Rough-in11/12/201511/13/201511/13/2015APART
DetailsJim Sly
Keegan Phone #: ###-####
Phase 1 corridor 1st floor and Electrical room 1st floor OK to cover.
CHANGE STATUS TO (ISS)  11/12/2015 DONE
DetailsChristina Prado
Plan mod fees paid in full
OVERRIDE  11/3/2015  
Plan assigned to (CJW)10/15/201510/15/201511/3/2015 PASS
DetailsCarl Westfall
Vineyard - Plan Mod
Plan Reviewer's activity  11/3/2015 PASS
Plan Modification approved
Permit Ready to Issue  11/3/2015 DONE
DO NOT REISSUE PLAN MOD
Routing - PLAN CHECK10/27/2015 11/3/2015 PASS
DetailsCarl Westfall
Outside air ducts provided to each air handling unit.
Routing - MECHANICAL10/27/2015 11/2/2015 PASS
DetailsTroy James
BLD-Foundation10/29/201510/29/201510/29/2015PCANC
DetailsJim Sly
Shear // Keegan Phone #: ###-####
BLD-Wall Bracing10/29/201510/29/201510/29/2015PPART
DetailsJim Sly
OK to install Wainscot rock at North wall .......Exterior nailing ok at that area only.
Plan Modification Accepted  10/27/2015 DONE
BLD-Framing/Rough-in10/23/201510/26/201510/26/2015PPART
DetailsTony Young
Northwest portion - Keegan Phone #: ###-####,, n/west roof ok,, also west wall bracing on upper and lower ok
Plan Modification Accepted  10/15/2015 DONE
DetailsChristina Prado
Plan mod requested by Mark Sanders to modify plans by adding fresh air intake to apartments
BLD-Wall Bracing10/9/201510/13/201510/13/2015APART
DetailsTony Young
Shear // Keegan Phone #: ###-####,, see plan for notes on where shear has been approved
BLD-Other9/30/20159/30/201510/1/2015PPART
DetailsTony Young
Concrete // Keegin Phone #: ###-####,, flat work
BLD-Other9/21/20159/22/20159/22/2015PDEFR
DetailsMike Jordan
later the better please for slab rebar & mesh - Keegan Phone #: ###-####. Pend. special inspection.
BLD-Ceiling Grid Inspection9/15/20159/15/20159/15/2015PCANC
DetailsMike Jordan
Kevin// the later the better Phone #: ###-####
BLD-Other9/15/20159/15/20159/15/2015PPART
DetailsMike Jordan
Kevin// the later the better Phone #: ###-####. Work in progress for welded wire mesh at slab on grade, pend. special inspection.
BLD-Other9/4/20159/4/20159/4/2015PPART
DetailsTony Young
slab pour cover, NW corner - keagan Phone #: ###-####,, special inspector on site
BLD-Foundation8/18/20158/19/20158/19/2015APART
DetailsTony Young
rebar; Kevin Phone #: ###-####,, SI on site
BLD-Foundation8/17/20158/18/20158/18/2015APASS
DetailsTony Young
Kevin Phone #: ###-####,, piers ok
BLD-Foundation8/11/20158/13/20158/13/2015PDONE
DetailsMike Jordan
Kevin Phone #: ###-####. Completed in the am.
BLD-Footing8/12/20158/13/20158/13/2015APART
DetailsMike Jordan
Late morning if possible // Kevin Phone #: ###-####. Work in progress. Special inspector on site. Need to verify that special inspector is ICC certified.
BLD-Footing8/11/20158/12/20158/12/2015PPART
DetailsTony Young
Kevin Phone #: ###-####,, SP. INSP. will be on site
BLD-Foundation8/7/20158/7/20158/7/2015PPASS
DetailsDave Hannah
rebar; Kevin Phone #: ###-####
BLD-Footing8/3/20158/4/20158/4/2015APASS
DetailsTony Young
Rebar // Kevin Phone #: ###-####
BLD-Foundation7/30/20158/3/20158/3/2015APART
DetailsTony Young
Rebar // Kevin Phone #: ###-####,, exterior footings,, special inspector will be on site
Issue PAID IN FULL permit  7/10/2015 DONE
Print Occupancy Form  7/10/2015 DONE
OVERRIDE  6/11/2015  
Routing - PLAN CHECK6/10/2015 6/11/2015 DONE
DetailsCarl Westfall
Waiting for someone to reassign Scot Arellano's task to Katie Marron so that she can sign off. Everyone who has the rights to do this are gone.
PLANS/APPL TAKEN TO FRONT DESK  6/11/2015 DONE
Permit Ready to Issue  6/11/2015 DONE
Needs; G.C. form, Revised certificate of value, & Responsible Person
Plan assigned to (CJW)3/18/2015 6/11/2015 PASS
DetailsCarl Westfall
VINEYARD AT EAGLE PROMENADE (15 days - April 7 --- 30 days - April 28) New building - ePlan
Routing - PLAN CHECK6/9/2015 6/10/2015 PASS
DetailsCarl Westfall
Approved by Consultant Structural Engineer
Routing - FIRE6/1/2015 6/9/2015 PASS
DetailsKatie Marron
Comments attached to plans
Routing PW Drainage6/1/2015 6/9/2015 PASS
DetailsBrian Murphy
Telephone call  6/9/2015 DONE
Left a phone message for Mark Sanders. Noted that the 2nd structural review had been completed and changemarks were available in ePlan. Noted that blower door tests will be required if natural ventilation is used. Noted that a document had not upload properly.
Routing Off Site - STRUCTURAL6/9/2015 6/9/2015 PASS
DetailsCarl Westfall
Approved by Chris Holladay
Routing Off Site - STRUCTURAL6/1/2015 6/8/2015 FAIL
DetailsCarl Westfall
Chris Holladay
Routing - Design Review6/1/2015 6/8/2015 PASS
DetailsAndrea Tuning
Routing - MECHANICAL6/1/2015 6/8/2015 FAIL
DetailsTroy James
emailed tim with dc engineering
Routing - MECHANICAL6/8/2015 6/8/2015 PASS
DetailsTroy James
Routing PW Sewer Design6/1/2015 6/4/2015 PASS
DetailsKyle S. Rosenmeyer
Routing PW Solid Waste6/1/2015 6/3/2015 PASS
DetailsMegan Durrell
Routing PW Street Lights6/3/2015 6/3/2015 PASS
DetailsMike D Hedge
Routing - PLUMBING6/1/2015 6/3/2015 PASS
DetailsDaryl Spivey
Unless required by Eagle Water the RPBP on water service can be changed to a DCVA.
Routing PW Street Lights6/1/2015 6/2/2015 FAIL
DetailsMike D Hedge
Routing - PLAN CHECK5/29/2015 6/1/2015 PEND
DetailsCarl Westfall
Waiting for 2nd review by structural
Plan resubmittals received  5/29/2015 DONE
Route to Impact Fee Review4/29/20155/2/20154/30/2015 PASS
DetailsCindy M. Gould
Plan resubmittals requested  4/29/2015 DONE
1st review completed  4/28/2015 DONE
Routing - PLAN CHECK3/18/2015 4/28/2015 FAIL
DetailsCarl Westfall
Routing PW Sewer Design3/18/2015 4/3/2015 FAIL
DetailsKyle S. Rosenmeyer
Record new 17 ft easement for sewer main (offset 4.5ft/12.5ft). Space sewer service as far as possible from column footings.

Contact Boise Public Works 48 hours prior to sewer connection to obtain tap permit and schedule inspection.
Routing Off Site - STRUCTURAL3/18/2015 3/31/2015 FAIL
DetailsCarl Westfall
Chris Holladay
Routing - FIRE3/18/2015 3/30/2015 FAIL
DetailsScott Arellano
Emailed plan review report to architect. Attached report to case.
Routing PW Drainage3/18/2015 3/27/2015 FAIL
DetailsBrian Murphy
need c-33
Routing - MECHANICAL3/18/2015 3/23/2015 FAIL
DetailsTroy James
Routing - PLUMBING3/23/2015 3/23/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing PW Solid Waste3/18/2015 3/20/2015 PASS
DetailsMegan Durrell
Megan Durrell
Routing PW Sewer Rating3/18/2015 3/19/2015 PASS
DetailsBeverly Mountain
Routing PW Street Lights3/18/2015 3/19/2015 FAIL
DetailsMike D Hedge
Street light info missing.
Routing - Erosion and Sediment3/18/2015 3/19/2015 PASS
DetailsEvan Jenkins
(SITE PREP INSPECTION REQUIRED PRIOR TO ANY EARTH DISTURBANCE) Only meets Boise City's BCC 8-17 Requirements, not Federal EPA's Requirements
Building 1: Construct a 30 unit apartment project. New senior housing building with associated parking, sidewalks, minor street improvements and landscaping. 1.73 Acres in size. PD claims he qualifies for a LEW. Disclosed he may want to rethink this decision. 30 Living Units
Routing - PLANNING Land Div3/18/2015 3/18/2015 PASS
DetailsDave Abo
Routing - Addressing3/18/2015 3/18/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS3/18/2015 3/18/2015 PASS
DetailsJennifer Bruner
Routing - Design Review3/18/2015 3/18/2015 FAIL
DetailsAndrea Tuning
The applicant should revise the drawings to show 8 Class II or Class III street trees along Utahna and relocate the pole lighting outside of the required landscape planters.
Intake Approval  3/18/2015 PASS
DetailsJohn Menard
Pending Assignment by JCM3/18/2015 3/18/2015 DONE
DetailsJohn Menard
Application received  3/11/2015 DONE
Application submitted via PDS Online on Mar 11 2015 10:51AM