First Notice | | 4/25/2016 | 5/5/2020 | | DONE |
|
|
|
This permit finaled on the web by Samantha Tallman
|
BLD-Final | 4/14/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Tony Young
|
|
|
Keegan Phone #: ###-####,, ok for c of o
|
FIRE-Final Inspection | 4/14/2016 | 4/15/2016 | 4/15/2016 | A | PASS |
Jim Page
|
|
|
Overhead fire sprinkler inspection complete (FIR15-00687), fire sprinkler underground inspection complete (FIR15-00547), fire alarm inspection complete (FIR15-00911) fire alarm communicator inspection complete (FIR16-00262). Fire extinguishers in place with current inspection tags, egress illumination verified (interior and discharge landing). Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 4/14/2016 | 4/15/2016 | 4/15/2016 | P | CANC |
Katie Marron
|
|
|
Keegan Phone #: ###-####
|
Permanent Occupancy | | | 4/15/2016 | | DONE |
|
|
|
|
Zoning Approval | 4/14/2016 | 4/14/2016 | 4/14/2016 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Conference | 3/29/2016 | 3/30/2016 | 3/30/2016 | P | DONE |
Mike Jordan
|
|
|
Keegan Phone #: ###-####
|
BLD-Other | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | PART |
Jim Sly
|
|
|
Keegan// fire calking inspection for the first floor corridor Phone #: ###-#### All firestopping above hard ceiling in main floor corridor......OK
|
BLD-Other | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | NR |
Tony Young
|
|
|
Fire caulking - Keegan Phone #: ###-####,, need to add some in areas in main floor corridor
|
BLD-Conference | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PEND |
Tony Young
|
|
|
Solar Panel; Keagan Phone #: ###-####,,
|
BLD-Conference | 1/27/2016 | 1/28/2016 | 1/28/2016 | A | PEND |
Tony Young
|
|
|
Solar Panel; Keagan Phone #: ###-####,, need to verify
|
BLD-Other | 1/26/2016 | 1/27/2016 | 1/27/2016 | A | PEND |
Tony Young
|
|
|
Solar Panel; Keagan Phone #: ###-####,, will need fire and electrical approval 1st,, need to verify this was part of scope of the work,, need to verify trusses were designed for added load
|
BLD-Other | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | PART |
Tony Young
|
|
|
Fire caulking east 7 lower units - Keegan Phone #: ###-####,, east 7 units ok,,
|
BLD-Other | 1/19/2016 | 1/20/2016 | 1/20/2016 | A | PART |
Tony Young
|
|
|
Fire caulking - Keegan Phone #: ###-####,, work in progress,, 7 lower east side,, ok
|
BLD-Framing/Rough-in | 1/15/2016 | 1/15/2016 | 1/17/2016 | P | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, upper east 7 units ok
|
BLD-Framing/Rough-in | 12/29/2015 | 12/31/2015 | 12/31/2015 | A | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, 2nd phase ok to prerock
|
BLD-Framing/Rough-in | 12/17/2015 | 12/18/2015 | 12/18/2015 | A | PART |
Tony Young
|
|
|
Kegan Phone #: ###-####,, work in progress,, ok to insulate
|
BLD-Conference | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | DEFR |
Tony Young
|
|
|
Kegan Phone #: ###-####
|
BLD-Framing/Rough-in | 12/11/2015 | 12/14/2015 | 12/14/2015 | A | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, ok to continue,, phase one,, west 8 units,, with insulation,, need to see prior to cover,, needs sprinkler inspection to see tenting also
|
BLD-Framing/Rough-in | 12/10/2015 | 12/11/2015 | 12/11/2015 | A | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, need sprinkler rough in pass,, mech is ok for now, the rest will be below drop ceiling,, prior corrections done,, also ok to procede with washer boxes
|
BLD-Framing/Rough-in | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | PART |
Tony Young
|
|
|
First Floor framing - Keagan Phone #: ###-####,, walk through only with plan reviewer, mechanical inspection reviewer.. need to finish and recall
|
BLD-Conference | 12/3/2015 | 12/4/2015 | 12/4/2015 | P | PART |
Tony Young
|
|
|
Keagan Phone #: ###-####,, frame ?s
|
BLD-Framing/Rough-in | 11/24/2015 | 11/25/2015 | 11/25/2015 | A | CANC |
Tony Young
|
|
|
Keigan Phone #: ###-####
|
BLD-Wall cover | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | PART |
Jim Sly
|
|
|
Shear // Keegan Phone #: ###-#### South side of Bldg.......OK.
|
BLD-Framing/Rough-in | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | PART |
Jim Sly
|
|
|
Keegan Phone #: ###-#### Phase 1 corridor 1st floor and Electrical room 1st floor OK to cover.
|
CHANGE STATUS TO (ISS) | | | 11/12/2015 | | DONE |
Christina Prado
|
|
|
Plan mod fees paid in full
|
OVERRIDE | | | 11/3/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 10/15/2015 | 10/15/2015 | 11/3/2015 | | PASS |
Carl Westfall
|
|
|
Vineyard - Plan Mod
|
Plan Reviewer's activity | | | 11/3/2015 | | PASS |
|
|
|
Plan Modification approved
|
Permit Ready to Issue | | | 11/3/2015 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Routing - PLAN CHECK | 10/27/2015 | | 11/3/2015 | | PASS |
Carl Westfall
|
|
|
Outside air ducts provided to each air handling unit.
|
Routing - MECHANICAL | 10/27/2015 | | 11/2/2015 | | PASS |
Troy James
|
|
|
|
BLD-Foundation | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | CANC |
Jim Sly
|
|
|
Shear // Keegan Phone #: ###-####
|
BLD-Wall Bracing | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PART |
Jim Sly
|
|
|
OK to install Wainscot rock at North wall .......Exterior nailing ok at that area only.
|
Plan Modification Accepted | | | 10/27/2015 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/23/2015 | 10/26/2015 | 10/26/2015 | P | PART |
Tony Young
|
|
|
Northwest portion - Keegan Phone #: ###-####,, n/west roof ok,, also west wall bracing on upper and lower ok
|
Plan Modification Accepted | | | 10/15/2015 | | DONE |
Christina Prado
|
|
|
Plan mod requested by Mark Sanders to modify plans by adding fresh air intake to apartments
|
BLD-Wall Bracing | 10/9/2015 | 10/13/2015 | 10/13/2015 | A | PART |
Tony Young
|
|
|
Shear // Keegan Phone #: ###-####,, see plan for notes on where shear has been approved
|
BLD-Other | 9/30/2015 | 9/30/2015 | 10/1/2015 | P | PART |
Tony Young
|
|
|
Concrete // Keegin Phone #: ###-####,, flat work
|
BLD-Other | 9/21/2015 | 9/22/2015 | 9/22/2015 | P | DEFR |
Mike Jordan
|
|
|
later the better please for slab rebar & mesh - Keegan Phone #: ###-####. Pend. special inspection.
|
BLD-Ceiling Grid Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | CANC |
Mike Jordan
|
|
|
Kevin// the later the better Phone #: ###-####
|
BLD-Other | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | PART |
Mike Jordan
|
|
|
Kevin// the later the better Phone #: ###-####. Work in progress for welded wire mesh at slab on grade, pend. special inspection.
|
BLD-Other | 9/4/2015 | 9/4/2015 | 9/4/2015 | P | PART |
Tony Young
|
|
|
slab pour cover, NW corner - keagan Phone #: ###-####,, special inspector on site
|
BLD-Foundation | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PART |
Tony Young
|
|
|
rebar; Kevin Phone #: ###-####,, SI on site
|
BLD-Foundation | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####,, piers ok
|
BLD-Foundation | 8/11/2015 | 8/13/2015 | 8/13/2015 | P | DONE |
Mike Jordan
|
|
|
Kevin Phone #: ###-####. Completed in the am.
|
BLD-Footing | 8/12/2015 | 8/13/2015 | 8/13/2015 | A | PART |
Mike Jordan
|
|
|
Late morning if possible // Kevin Phone #: ###-####. Work in progress. Special inspector on site. Need to verify that special inspector is ICC certified.
|
BLD-Footing | 8/11/2015 | 8/12/2015 | 8/12/2015 | P | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####,, SP. INSP. will be on site
|
BLD-Foundation | 8/7/2015 | 8/7/2015 | 8/7/2015 | P | PASS |
Dave Hannah
|
|
|
rebar; Kevin Phone #: ###-####
|
BLD-Footing | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | PASS |
Tony Young
|
|
|
Rebar // Kevin Phone #: ###-####
|
BLD-Foundation | 7/30/2015 | 8/3/2015 | 8/3/2015 | A | PART |
Tony Young
|
|
|
Rebar // Kevin Phone #: ###-####,, exterior footings,, special inspector will be on site
|
Issue PAID IN FULL permit | | | 7/10/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/10/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/11/2015 | | |
|
|
|
|
Routing - PLAN CHECK | 6/10/2015 | | 6/11/2015 | | DONE |
Carl Westfall
|
|
|
Waiting for someone to reassign Scot Arellano's task to Katie Marron so that she can sign off. Everyone who has the rights to do this are gone.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/11/2015 | | DONE |
|
|
|
Needs; G.C. form, Revised certificate of value, & Responsible Person
|
Plan assigned to (CJW) | 3/18/2015 | | 6/11/2015 | | PASS |
Carl Westfall
|
|
|
VINEYARD AT EAGLE PROMENADE (15 days - April 7 --- 30 days - April 28) New building - ePlan
|
Routing - PLAN CHECK | 6/9/2015 | | 6/10/2015 | | PASS |
Carl Westfall
|
|
|
Approved by Consultant Structural Engineer
|
Routing - FIRE | 6/1/2015 | | 6/9/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to plans
|
Routing PW Drainage | 6/1/2015 | | 6/9/2015 | | PASS |
Brian Murphy
|
|
|
|
Telephone call | | | 6/9/2015 | | DONE |
|
|
|
Left a phone message for Mark Sanders. Noted that the 2nd structural review had been completed and changemarks were available in ePlan. Noted that blower door tests will be required if natural ventilation is used. Noted that a document had not upload properly.
|
Routing Off Site - STRUCTURAL | 6/9/2015 | | 6/9/2015 | | PASS |
Carl Westfall
|
|
|
Approved by Chris Holladay
|
Routing Off Site - STRUCTURAL | 6/1/2015 | | 6/8/2015 | | FAIL |
Carl Westfall
|
|
|
Chris Holladay
|
Routing - Design Review | 6/1/2015 | | 6/8/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - MECHANICAL | 6/1/2015 | | 6/8/2015 | | FAIL |
Troy James
|
|
|
emailed tim with dc engineering
|
Routing - MECHANICAL | 6/8/2015 | | 6/8/2015 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Design | 6/1/2015 | | 6/4/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Solid Waste | 6/1/2015 | | 6/3/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Street Lights | 6/3/2015 | | 6/3/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing - PLUMBING | 6/1/2015 | | 6/3/2015 | | PASS |
Daryl Spivey
|
|
|
Unless required by Eagle Water the RPBP on water service can be changed to a DCVA.
|
Routing PW Street Lights | 6/1/2015 | | 6/2/2015 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - PLAN CHECK | 5/29/2015 | | 6/1/2015 | | PEND |
Carl Westfall
|
|
|
Waiting for 2nd review by structural
|
Plan resubmittals received | | | 5/29/2015 | | DONE |
|
|
|
|
Route to Impact Fee Review | 4/29/2015 | 5/2/2015 | 4/30/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 4/29/2015 | | DONE |
|
|
|
|
1st review completed | | | 4/28/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/18/2015 | | 4/28/2015 | | FAIL |
Carl Westfall
|
|
|
|
Routing PW Sewer Design | 3/18/2015 | | 4/3/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Record new 17 ft easement for sewer main (offset 4.5ft/12.5ft). Space sewer service as far as possible from column footings.
Contact Boise Public Works 48 hours prior to sewer connection to obtain tap permit and schedule inspection.
|
Routing Off Site - STRUCTURAL | 3/18/2015 | | 3/31/2015 | | FAIL |
Carl Westfall
|
|
|
Chris Holladay
|
Routing - FIRE | 3/18/2015 | | 3/30/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to architect. Attached report to case.
|
Routing PW Drainage | 3/18/2015 | | 3/27/2015 | | FAIL |
Brian Murphy
|
|
|
need c-33
|
Routing - MECHANICAL | 3/18/2015 | | 3/23/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 3/23/2015 | | 3/23/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Solid Waste | 3/18/2015 | | 3/20/2015 | | PASS |
Megan Durrell
|
|
|
Megan Durrell
|
Routing PW Sewer Rating | 3/18/2015 | | 3/19/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Street Lights | 3/18/2015 | | 3/19/2015 | | FAIL |
Mike D Hedge
|
|
|
Street light info missing.
|
Routing - Erosion and Sediment | 3/18/2015 | | 3/19/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO ANY EARTH DISTURBANCE) Only meets Boise City's BCC 8-17 Requirements, not Federal EPA's Requirements
Building 1: Construct a 30 unit apartment project. New senior housing building with associated parking, sidewalks, minor street improvements and landscaping. 1.73 Acres in size. PD claims he qualifies for a LEW. Disclosed he may want to rethink this decision. 30 Living Units
|
Routing - PLANNING Land Div | 3/18/2015 | | 3/18/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 3/18/2015 | | 3/18/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 3/18/2015 | | 3/18/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Design Review | 3/18/2015 | | 3/18/2015 | | FAIL |
Andrea Tuning
|
|
|
The applicant should revise the drawings to show 8 Class II or Class III street trees along Utahna and relocate the pole lighting outside of the required landscape planters.
|
Intake Approval | | | 3/18/2015 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 3/18/2015 | | 3/18/2015 | | DONE |
John Menard
|
|
|
|
Application received | | | 3/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 11 2015 10:51AM
|