Case Summary (BLD) | | | 2/29/2016 | | DONE |
|
|
|
|
Second Notice | | 8/21/2015 | 8/13/2015 | | DONE |
|
|
|
This permit finaled on the web by Kirk Ledbetter
|
First Notice | | 7/19/2015 | 8/11/2015 | | DONE |
Candy A. Nichols
|
|
|
mailed notice
|
BLD-Final | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | PASS |
Mike Jordan
|
|
|
Joel Phone #: ###-####. Ok for perm occ.
|
Permanent Occupancy | | | 7/9/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Request to Exit button has been installed at doors and has been tested.
|
FIRE-Final Inspection | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | FAIL |
Troy Cobbley
|
|
|
All items have been addressed except the door mags at the main entrance. Per my conversation with Carl in plan review the door mags need to be code compliant and tested.
|
FIRE-Final Inspection | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | FAIL |
Troy Cobbley
|
|
|
Repair exit sign, provide annual inspection tag for the fire extinguisher, remove dead bolt at the top of the exit door, meet IFC and IBC requirements for door magnets that have been installed on the exit doors.
|
BLD-Final | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | NR |
Mike Jordan
|
|
|
Joel Phone #: ###-####. Needs fire/life/safety final.
|
BLD-Ceiling Grid Inspection | 5/29/2015 | 6/1/2015 | 6/1/2015 | A | PART |
Mike Jordan
|
|
|
Joel Phone #: ###-####. ceiling grid ok, pending electrucal and mech. rough in inspections.
|
BLD-Energy code compliance | 4/28/2015 | 4/29/2015 | 4/29/2015 | A | PASS |
Mike Jordan
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PASS |
Mike Jordan
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 4/20/2015 | 4/21/2015 | 4/21/2015 | A | NR |
Mike Jordan
|
|
|
Joel Phone #: ###-####. Needs rough in inspections.
|
OVERRIDE | | | 4/9/2015 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/9/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/9/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/9/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/16/2015 | | 4/2/2015 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/2/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2015 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 3/16/2015 | 3/16/2015 | 3/19/2015 | | PASS |
Carl D Madsen
|
|
|
Level 2 Due 3/30
|
Routing - PUBLIC WORKS | 3/16/2015 | | 3/17/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Sewer Rating | 3/17/2015 | | 3/17/2015 | | PASS |
Jennifer Bruner
|
|
|
West Boise Sewer District
|
Routing - Erosion and Sediment | 3/16/2015 | | 3/16/2015 | | PASS |
Evan Jenkins
|
|
|
The complete interior remodel & demising of 2,370 sq ft from the existing 5,569 sq ft bank space. There is no exterior work with this project. All interior finishes will be new. This is a down size of the existing space.
|
Routing - Addressing | 3/16/2015 | | 3/16/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 3/16/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Application received | | | 3/12/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 12 2015 9:32AM
|