BLD-Final | 10/28/2015 | 10/28/2015 | 10/28/2015 | P | PASS |
Jim Sly
|
|
|
Tyler Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 10/28/2015 | | DONE |
|
|
|
|
Telephone call | | | 10/27/2015 | | DONE |
|
|
|
Left a message for Dave informing him that the PLM and ELE are still open. Told him that I spoke with both inspectors and PLM said there is still work being done, and ELE said they have never called in the final.
|
FIRE-Final Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 10/26/2015 | 10/26/2015 | 10/26/2015 | | DONE |
Cody Riddle
|
|
|
|
BLD-Energy code compliance | 9/16/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Jim Sly
|
|
|
Insulators should be don by 11am, come around then please. Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Framing/Rough-in | 9/16/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Wall Bracing | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Jim Sly
|
|
|
ext shear Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Footing | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | PASS |
Jim Sly
|
|
|
Ken Phone #: ###-#### Slab .....OK
|
BLD-Wall Bracing | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | PASS |
Jim Sly
|
|
|
1st interior shear Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Energy code compliance | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Jim Storey
|
|
|
Rob Phone #: ###-#### foam at stem wall.
|
BLD-Foundation | 6/2/2015 | 6/2/2015 | 6/3/2015 | P | PASS |
Jim Sly
|
|
|
Manual Phone #: ###-####
|
BLD-Footing | 6/1/2015 | 6/1/2015 | 6/1/2015 | P | PASS |
Jim Sly
|
|
|
Manual Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/29/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 5/21/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 5/13/2015 | 5/13/2015 | 5/21/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
New Apts. Bldg 6 - Paper - Reassigned from Sam Zahorka
|
Routing - Addressing | 5/4/2015 | | 5/21/2015 | | PASS |
Jason C. Taylor
|
|
|
County assigned tax parcels have been uploaded into tidemark. Project approved. Jason Taylor ###-####
|
Print Occupancy Form | | | 5/21/2015 | | DONE |
Christina Prado
|
|
|
|
Routing - PUBLIC WORKS | 5/21/2015 | | 5/21/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Sewer Rating | 5/21/2015 | | 5/21/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Solid Waste | 5/21/2015 | | 5/21/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing - PLANNING | 5/21/2015 | | 5/21/2015 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLANNING Land Div | 5/21/2015 | | 5/21/2015 | | PASS |
Todd Tucker
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/21/2015 | | DONE |
Christina Prado
|
|
|
Need GC form
|
Route to Impact Fee Review | 5/13/2015 | 5/16/2015 | 5/19/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Street Lights | 5/19/2015 | | 5/19/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing - FIRE | | 3/12/2015 | 5/13/2015 | | PASS |
Scott Arellano
|
|
|
|
Plan assigned to (SRZ) | | 3/12/2015 | 5/13/2015 | | DEFR |
Sam Zahorka
|
|
|
1st review completed.
Reassigned to Adele Schaffeld-Griffin.
|
Routing - PLAN CHECK | 5/4/2015 | | 5/4/2015 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 5/4/2015 | | DONE |
Sam Zahorka
|
|
|
|
1st review completed | | | 5/4/2015 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | | | 4/17/2015 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - MECHANICAL | 4/8/2015 | | 4/8/2015 | | PASS |
Troy James
|
|
|
See bld14-02369 for acca report
|
Routing - Erosion and Sediment | 4/8/2015 | | 4/8/2015 | | PASS |
Andy J. Long
|
|
|
SWPPP narrative and map for Breckenwood subdivision 4-plexes resubmitted with revisions to show 9 units. Subdivision BMPs implemented under ESC14-01040
|
Routing - MECHANICAL | 4/3/2015 | | 4/7/2015 | | FAIL |
Troy James
|
|
|
emailed correction to architect
|
Routing - PLUMBING | 4/7/2015 | | 4/7/2015 | | PASS |
Daryl Spivey
|
|
|
|
Routing - PUBLIC WORKS | 3/20/2015 | | 4/3/2015 | | FAIL |
Jennifer Bruner
|
|
|
See Solid Waste, Addressing, Sewer Rating, and Street Lights
|
Routing - Erosion and Sediment | 4/3/2015 | | 4/3/2015 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative required per BCC 8-17
4 plex Bld # 6
|
Routing PW Drainage | 3/25/2015 | | 4/2/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 3/23/2015 | | 3/25/2015 | | FAIL |
Megan Durrell
|
|
|
|
Routing PW Sewer Rating | 3/24/2015 | | 3/24/2015 | | FAIL |
Jennifer Bruner
|
|
|
Addressing needs passed before sewer permits can be assigned
|
Routing PW Sewer Design | 3/20/2015 | | 3/23/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Sewer has been installed.
|
Routing - Addressing | 3/18/2015 | | 3/20/2015 | | FAIL |
Jason C. Taylor
|
|
|
Parcels have not recored with county. Must have individual parcel numbers prior to approval. Jason Taylor ###-####.
|
Routing PW Street Lights | 3/20/2015 | | 3/20/2015 | | FAIL |
Mike D Hedge
|
|
|
Street Light info missing.
|
Routing - PLANNING | | | 3/18/2015 | | FAIL |
Todd Tucker
|
|
|
1. Common lot amenities must be installed or bonded for.
2. Detailed information on the gazebo, picnic area, and plaza must be submitted.
|
Routing - PLANNING Land Div | 3/12/2015 | | 3/18/2015 | | FAIL |
Todd Tucker
|
|
|
do not issue building permit until the breckenwood subdivision plat has been recorded.
|
Intake Approval | | | 3/12/2015 | | PASS |
Carl Westfall
|
|
|
The subdivision plat had not been recorded. A letter was provided requesting the project be accepted as had been done in the past for other projects. A valid site plan showing the subdivision property lines is required. Dimensions between buildings and property lines shall be shown. Building walls closer than 10 feet to a property line shall have a 1-hr fire-resistance-rating from both sides. The area of wall openings may be limited and parapets, or an alternative to parapets, may be required.
|
Plans ACCEPTED BY PLAN TECH | | | 3/12/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/12/2015 | | DONE |
Candy A. Nichols
|
|
|
|
First Notice | | 11/7/2015 | | | |
|
|
|
|
Application received | | 3/12/2015 | | | |
|
|
|
|
Application received | | 3/12/2015 | | | |
|
|
|
|