Permit Information
Permit NumberBLD15-00708
StatusIssued
Name ANGOOD CONSTRUCTION LLC
Site Address 5300 W FAIRVIEW AVE
Project NameBoise Auto Clearance-Addition
Customer Number 
ePlanReviewNo
Description
(BOISE AUTO CLEARANCE – Addition) Permit is to Demo an existing 540 square feet garage bay and replace it with a 1,260 square foot larger garage bay. This new addition will create a 4,514 square foot auto repair and showroom office. Approval contingent upon adhering to the approved plans on file and attached engineering. Work to include: demolition of existing garage bay, construct new 14 ft exterior walls to define new service garage area, construct new manufactured roof truss system, install new ramp to connect existing garage to new garage finish floor level, new lighting, reinstall and reuse existing mechanical unit heater, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is not fire sprinkled. This facility is not approved for any flammable finish operations without separate Fire Code evaluation and approval.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/7/20158/10/20158/10/2015APASS
DetailsMike Jordan
Won''t in until 9 // Brad Phone #: ###-####. Ok for perm occ.
Zoning Approval8/10/20158/10/20158/10/2015 PASS
DetailsJosh Wilson
PubWorks Occupancy Approval7/29/20157/29/20157/29/2015 DONE
DetailsTiffany Lowery
BLD-Final7/22/20157/23/20157/23/2015ANR
DetailsJim Sly
Jeff Phone #: ###-####
C/N need many signatures....
FIRE-Final Inspection7/22/20157/22/20157/22/2015PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Wall Bracing7/7/20157/7/20157/7/2015PPASS
DetailsJim Sly
Jeff Phone #: ###-####
BLD-Energy code compliance7/2/20157/2/20157/2/2015PPART
DetailsJim Sly
Sean Phone #: ###-####
Still need to see brace panel S. wall. Insulation .....OK


BLD-Framing/Rough-in6/30/20156/30/20156/30/2015PPASS
DetailsJim Sly
Sean Phone #: ###-####
BLD-Wall Bracing6/23/20156/24/20156/24/2015APART
DetailsJim Sly
Jeff Phone #: ###-####
Ext. nailing OK. Still need to see brace panel at South wall.
BLD-Wall Bracing6/16/20156/17/20156/17/2015AFAIL
DetailsJim Sly
Jeff-plans inside on table Phone #: ###-####
More nailing and Brace panel at S. wall.
BLD-Wall Bracing5/20/20155/21/20155/21/2015APART
DetailsJim Sly
Dave Phone #: ###-####
FOUNDATION WALL OK
BLD-Footing5/18/20155/19/20155/19/2015APASS
DetailsJim Sly
David Phone #: ###-####
BLD-Footing5/14/20155/15/20155/15/2015AFAIL
DetailsJim Storey
As early as possible // David Phone #: ###-#### remove water
Route to Impact Fee Review4/30/20155/3/20155/12/2015 PASS
DetailsCindy M. Gould
BLD-Conference5/8/20155/11/20155/11/2015ADONE
DetailsJim Sly
Jeff Phone #: ###-####
Called Sarah McClendon Struct Eng. She says no Req. For special inspection. Contr to order 3500 PSI mud for footing/walls .....4000 for slab. Concrete Contr. Notified.
Issue PAID IN FULL permit  5/5/2015 DONE
OVERRIDE  5/1/2015  
Print Occupancy Form  5/1/2015 DONE
Telephone call  5/1/2015 DONE
Left message for David to inform him we need a RP, GC Form and Revised Cert of Value for the final fees.
Routing - PLAN CHECK5/1/2015 5/1/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/1/2015 DONE
Case Summary (BLD)  5/1/2015 DONE
Permit Ready to Issue  5/1/2015 DONE
NEED GC form, Cert of Value, and RP
Routing - MECHANICAL  5/1/2015 PASS
Plan assigned to (TLW)3/20/2015 5/1/2015 PASS
DetailsTim L. Woodard
Routing - FIRE4/28/2015 4/30/2015 PASS
DetailsScott Arellano
Plans are approved with red lined comments. Attached plan review report to plans.
1st review completed  4/30/2015  
Failed Mechanical
Plan resubmittals received  4/28/2015 DONE
resubmittals received two sheets of A-2 and the comments sheet-took to Tim W
Routing - Design Review4/28/2015 4/28/2015 PASS
DetailsJosh Wilson
OK per DRH14-00396
Routing PW Drainage  4/28/2015 PASS
Routing - PLAN CHECK4/8/2015 4/28/2015 PASS
DetailsTim L. Woodard
Plan Reviewer's activity  4/9/2015 DONE
DetailsSam Zahorka
Responded to an email from the applicant concerning the status of his permit. CC: The building plan reviewer and Jason Blais the building official.
Routing - Design Review4/6/2015 4/8/2015 FAIL
DetailsJosh Wilson
Comply with conditions of DRH14-00396
Routing - MECHANICAL4/1/2015 4/3/2015 FAIL
DetailsTroy James
emailed correction to architect
Routing - Erosion and Sediment3/31/2015 4/1/2015 PASS
DetailsEvan Jenkins
(Boise Auto Clearance) Permit to add 1,260 square feet to the side of an existing auto garage. Permit also includes removing an existing garage bay off the side of the building prior to constructing this one.
Routing PW Environmental3/24/2015 3/31/2015 PASS
DetailsTerry Alber
Dry Shop - No Drains - per architect
Plan resubmittals received  3/31/2015 DONE
Two copies of sheet SD. Taken to Brian Murphy
Routing PW Drainage3/25/2015 3/31/2015 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS3/24/2015 3/31/2015 PASS
DetailsJennifer Bruner
Routing PW Solid Waste3/24/2015 3/25/2015 PASS
DetailsMegan Durrell
Routing PW Sewer Rating3/24/2015 3/24/2015 PASS
DetailsJennifer Bruner
Routing - Addressing3/23/2015 3/24/2015 PASS
DetailsJason C. Taylor
Routing - PLANNING Land Div3/23/2015 3/23/2015 PASS
DetailsDave Abo
Lots 9-16 of Block 9 of Cruzen Mountain View Addition
Plans ACCEPTED BY PLAN TECH  3/19/2015 DONE
DetailsCandy A. Nichols
Recd Pcfee & Taken To Pln CK  3/19/2015 DONE
Intake Approval  3/19/2015 PASS
Meeting  3/17/2015 DONE
DetailsSam Zahorka
Met with the architect David Hertel and went through the circled items on the submittal checklist. Answered all his intake / Code questions, gave him my business card to call me if further assistance is needed. Also gave him Peter McCullough business card for questions concerning trash enclosure requirements. Went to my desk and printed a ESC waiver request template letter for him. I brought the 2012 IECC code book to the conference room and went over the requirements for his project.
Intake Approval  3/17/2015 FAIL
DetailsSam Zahorka
Failed 2nd intake meeting. Circled items on the submittal checklist were not provided. (See 3/17/15 meeting notes).
Intake Approval  3/13/2015 FAIL
DetailsSam Zahorka
Refer to circled items on checklist attached to this case. SRZ
Plan Reviewer's activity  3/13/2015 DONE
DetailsSam Zahorka
Met with the applicant and tried to conduct his new commercial addition intake meeting. He did not want to wait or have time to conduct the intake meeting. I gave him my direct telephone number and requested he have his design professional give me a call. He gave me and the permit technician a PDS survey with a letter attachment. I gave a copy to the building offical for record.
Plan Reviewer's activity  3/13/2015 DONE
DetailsSam Zahorka
emailed the intake checklist to the architect. Requested him to address the circled items on the checklist. offered my telephone number for further assistance if needed.
Application received 3/12/2015