BLD-Final | 8/7/2015 | 8/10/2015 | 8/10/2015 | A | PASS |
Mike Jordan
|
|
|
Won''t in until 9 // Brad Phone #: ###-####. Ok for perm occ.
|
Zoning Approval | 8/10/2015 | 8/10/2015 | 8/10/2015 | | PASS |
Josh Wilson
|
|
|
|
PubWorks Occupancy Approval | 7/29/2015 | 7/29/2015 | 7/29/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 7/22/2015 | 7/23/2015 | 7/23/2015 | A | NR |
Jim Sly
|
|
|
Jeff Phone #: ###-#### C/N need many signatures....
|
FIRE-Final Inspection | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Wall Bracing | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | PASS |
Jim Sly
|
|
|
Jeff Phone #: ###-####
|
BLD-Energy code compliance | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | PART |
Jim Sly
|
|
|
Sean Phone #: ###-#### Still need to see brace panel S. wall. Insulation .....OK
|
BLD-Framing/Rough-in | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Jim Sly
|
|
|
Sean Phone #: ###-####
|
BLD-Wall Bracing | 6/23/2015 | 6/24/2015 | 6/24/2015 | A | PART |
Jim Sly
|
|
|
Jeff Phone #: ###-#### Ext. nailing OK. Still need to see brace panel at South wall.
|
BLD-Wall Bracing | 6/16/2015 | 6/17/2015 | 6/17/2015 | A | FAIL |
Jim Sly
|
|
|
Jeff-plans inside on table Phone #: ###-#### More nailing and Brace panel at S. wall.
|
BLD-Wall Bracing | 5/20/2015 | 5/21/2015 | 5/21/2015 | A | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### FOUNDATION WALL OK
|
BLD-Footing | 5/18/2015 | 5/19/2015 | 5/19/2015 | A | PASS |
Jim Sly
|
|
|
David Phone #: ###-####
|
BLD-Footing | 5/14/2015 | 5/15/2015 | 5/15/2015 | A | FAIL |
Jim Storey
|
|
|
As early as possible // David Phone #: ###-#### remove water
|
Route to Impact Fee Review | 4/30/2015 | 5/3/2015 | 5/12/2015 | | PASS |
Cindy M. Gould
|
|
|
|
BLD-Conference | 5/8/2015 | 5/11/2015 | 5/11/2015 | A | DONE |
Jim Sly
|
|
|
Jeff Phone #: ###-#### Called Sarah McClendon Struct Eng. She says no Req. For special inspection. Contr to order 3500 PSI mud for footing/walls .....4000 for slab. Concrete Contr. Notified.
|
Issue PAID IN FULL permit | | | 5/5/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 5/1/2015 | | |
|
|
|
|
Print Occupancy Form | | | 5/1/2015 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2015 | | DONE |
|
|
|
Left message for David to inform him we need a RP, GC Form and Revised Cert of Value for the final fees.
|
Routing - PLAN CHECK | 5/1/2015 | | 5/1/2015 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/1/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2015 | | DONE |
|
|
|
NEED GC form, Cert of Value, and RP
|
Routing - MECHANICAL | | | 5/1/2015 | | PASS |
|
|
|
|
Plan assigned to (TLW) | 3/20/2015 | | 5/1/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 4/28/2015 | | 4/30/2015 | | PASS |
Scott Arellano
|
|
|
Plans are approved with red lined comments. Attached plan review report to plans.
|
1st review completed | | | 4/30/2015 | | |
|
|
|
Failed Mechanical
|
Plan resubmittals received | | | 4/28/2015 | | DONE |
|
|
|
resubmittals received two sheets of A-2 and the comments sheet-took to Tim W
|
Routing - Design Review | 4/28/2015 | | 4/28/2015 | | PASS |
Josh Wilson
|
|
|
OK per DRH14-00396
|
Routing PW Drainage | | | 4/28/2015 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/8/2015 | | 4/28/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Plan Reviewer's activity | | | 4/9/2015 | | DONE |
Sam Zahorka
|
|
|
Responded to an email from the applicant concerning the status of his permit. CC: The building plan reviewer and Jason Blais the building official.
|
Routing - Design Review | 4/6/2015 | | 4/8/2015 | | FAIL |
Josh Wilson
|
|
|
Comply with conditions of DRH14-00396
|
Routing - MECHANICAL | 4/1/2015 | | 4/3/2015 | | FAIL |
Troy James
|
|
|
emailed correction to architect
|
Routing - Erosion and Sediment | 3/31/2015 | | 4/1/2015 | | PASS |
Evan Jenkins
|
|
|
(Boise Auto Clearance) Permit to add 1,260 square feet to the side of an existing auto garage. Permit also includes removing an existing garage bay off the side of the building prior to constructing this one.
|
Routing PW Environmental | 3/24/2015 | | 3/31/2015 | | PASS |
Terry Alber
|
|
|
Dry Shop - No Drains - per architect
|
Plan resubmittals received | | | 3/31/2015 | | DONE |
|
|
|
Two copies of sheet SD. Taken to Brian Murphy
|
Routing PW Drainage | 3/25/2015 | | 3/31/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 3/24/2015 | | 3/31/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Solid Waste | 3/24/2015 | | 3/25/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Sewer Rating | 3/24/2015 | | 3/24/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 3/23/2015 | | 3/24/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING Land Div | 3/23/2015 | | 3/23/2015 | | PASS |
Dave Abo
|
|
|
Lots 9-16 of Block 9 of Cruzen Mountain View Addition
|
Plans ACCEPTED BY PLAN TECH | | | 3/19/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/19/2015 | | DONE |
|
|
|
|
Intake Approval | | | 3/19/2015 | | PASS |
|
|
|
|
Meeting | | | 3/17/2015 | | DONE |
Sam Zahorka
|
|
|
Met with the architect David Hertel and went through the circled items on the submittal checklist. Answered all his intake / Code questions, gave him my business card to call me if further assistance is needed. Also gave him Peter McCullough business card for questions concerning trash enclosure requirements. Went to my desk and printed a ESC waiver request template letter for him. I brought the 2012 IECC code book to the conference room and went over the requirements for his project.
|
Intake Approval | | | 3/17/2015 | | FAIL |
Sam Zahorka
|
|
|
Failed 2nd intake meeting. Circled items on the submittal checklist were not provided. (See 3/17/15 meeting notes).
|
Intake Approval | | | 3/13/2015 | | FAIL |
Sam Zahorka
|
|
|
Refer to circled items on checklist attached to this case. SRZ
|
Plan Reviewer's activity | | | 3/13/2015 | | DONE |
Sam Zahorka
|
|
|
Met with the applicant and tried to conduct his new commercial addition intake meeting. He did not want to wait or have time to conduct the intake meeting. I gave him my direct telephone number and requested he have his design professional give me a call. He gave me and the permit technician a PDS survey with a letter attachment. I gave a copy to the building offical for record.
|
Plan Reviewer's activity | | | 3/13/2015 | | DONE |
Sam Zahorka
|
|
|
emailed the intake checklist to the architect. Requested him to address the circled items on the checklist. offered my telephone number for further assistance if needed.
|
Application received | | 3/12/2015 | | | |
|
|
|
|