Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD15-00763
StatusFinaled
Name VERTICAL CORP
Site Address 890 W MAIN ST
Project NameDL Evans Bank Branch
Customer NumberXREF - BLD15-00776
ePlanReviewYes
Description
(D.L. EVANS BANK BRANCH) Plan modification to install windows in wall enclosure around secondary 2nd floor stairway. This is not a rated enclosure nor a required exit based on occupant load, interior access stairway. **ajs** 6/16/15 Permit for renovation of an existing space for a new DL Evans bank. This space was previously occupied by Zion’s bank BLD01-01556. Minor demotion per approved plans included in this permit. Scope of work to include; interior non-bearing walls, new millwork, new interior doors and hardware, all new finishes and the installation of an ATM and night deposit on the Main Street elevation. The lobby located from the building off 9th street is a 1 hour rated enclosure and the rating shall be maintained. . This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/18/201510/20/2015 DONE
This permit finaled on the web by Todd Weltner
Third Notice 9/20/201510/13/2015 DONE
Third Notice 8/15/20159/15/2015 DONE
Second Notice 7/19/20158/10/2015 DONE
Mailed 8/11
First Notice 7/6/20157/9/2015 DONE
Mailed 7-10-15
Permanent Occupancy  6/26/2015 DONE
BLD-Final6/24/20156/25/20156/25/2015PPASS
DetailsDave Hannah
Kent Phone #: ###-####
FIRE-Final Inspection6/24/20156/25/20156/25/2015APASS
DetailsJim Page
Amendment made to original city approved drawings, removal of exit light & installation of lockable door for an area on second floor mezzanine no longer designated as emergency exit/egress. Decorative glass panel installed with new door, causing an overspace issue with fire sprinklers, new sprinkler added on other side of glass panel to provide adequate sprinkler protection, correcting the overspaced issue. Life fire safety inspection passed/complete
CHANGE STATUS TO (ISS)  6/24/2015 DONE
DetailsChristina Prado
OVERRIDE  6/16/2015  
Plan assigned to (AJS)6/15/20156/15/20156/16/2015 PASS
DetailsAdele J Schaffeld-Griffin
plan modification
Routing - PLAN CHECK6/15/2015 6/16/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  6/16/2015 DONE
Permit Ready to Issue  6/16/2015 DONE
requirments met- DO NOT RE-ISSUE
Temporary Occupancy6/12/20159/10/20156/12/2015 DONE
DetailsBrittany Hill
Temporary Occupancy6/12/20159/10/20156/12/2015 DONE
DetailsBrittany Hill
BLD-Final6/10/20156/11/20156/11/2015APEND
DetailsDave Hannah
Per Kent with Veterical Phone #: ###-#### ok for temp occ ok for perm occ after elec and fire oks for perm occ
FIRE-Final Inspection6/11/20156/12/20156/11/2015APASS
DetailsJim Page
Life fire safety passed/complete
Zoning Approval6/11/20156/11/20156/11/2015 PASS
DetailsJosh Wilson
FIRE-Final Inspection6/10/20156/10/20156/10/2015PFAIL
DetailsJim Page
Exit signs missing
BLD-Conference5/20/20155/21/20155/22/2015APEND
DetailsDave Hannah
Kent Phone #: ###-#### ceiling grid ok after elec oks
BLD-Framing/Rough-in4/17/20154/17/20154/17/2015PPASS
DetailsJim Storey
Kent Phone #: ###-####
Issue PAID IN FULL permit  4/8/2015 DONE
Print Occupancy Form  4/8/2015 DONE
Plan assigned to (AJS)3/17/20153/17/20154/2/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed D.L Evans Bank
Routing - PLAN CHECK4/2/2015 4/2/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  4/2/2015 DONE
Permit Ready to Issue  4/2/2015 DONE
NEED GC form and Certificate of Value- 4-6-15 received GC and rev cert of val-emailed Todd the fees due CAN
1st review completed  3/26/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK3/17/2015 3/26/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Sewer Rating3/17/2015 3/19/2015 PASS
DetailsJennifer Bruner
Routing - Design Review3/18/2015 3/19/2015 PASS
DetailsSarah Schafer
Approved per CZC15-00021.
Routing - Addressing3/17/2015 3/18/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS3/17/2015 3/17/2015 PASS
DetailsJennifer Bruner
Intake Approval  3/17/2015 PASS
Plans ACCEPTED BY PLAN CHECK  3/17/2015 DONE
Application received  3/16/2015 DONE
Application submitted via PDS Online on Mar 16 2015 1:22PM