Third Notice | | 10/18/2015 | 10/20/2015 | | DONE |
|
|
|
This permit finaled on the web by Todd Weltner
|
Third Notice | | 9/20/2015 | 10/13/2015 | | DONE |
|
|
|
|
Third Notice | | 8/15/2015 | 9/15/2015 | | DONE |
|
|
|
|
Second Notice | | 7/19/2015 | 8/10/2015 | | DONE |
|
|
|
Mailed 8/11
|
First Notice | | 7/6/2015 | 7/9/2015 | | DONE |
|
|
|
Mailed 7-10-15
|
Permanent Occupancy | | | 6/26/2015 | | DONE |
|
|
|
|
BLD-Final | 6/24/2015 | 6/25/2015 | 6/25/2015 | P | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-####
|
FIRE-Final Inspection | 6/24/2015 | 6/25/2015 | 6/25/2015 | A | PASS |
Jim Page
|
|
|
Amendment made to original city approved drawings, removal of exit light & installation of lockable door for an area on second floor mezzanine no longer designated as emergency exit/egress. Decorative glass panel installed with new door, causing an overspace issue with fire sprinklers, new sprinkler added on other side of glass panel to provide adequate sprinkler protection, correcting the overspaced issue. Life fire safety inspection passed/complete
|
CHANGE STATUS TO (ISS) | | | 6/24/2015 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/16/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 6/15/2015 | 6/15/2015 | 6/16/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
plan modification
|
Routing - PLAN CHECK | 6/15/2015 | | 6/16/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/16/2015 | | DONE |
|
|
|
requirments met- DO NOT RE-ISSUE
|
Temporary Occupancy | 6/12/2015 | 9/10/2015 | 6/12/2015 | | DONE |
Brittany Hill
|
|
|
|
Temporary Occupancy | 6/12/2015 | 9/10/2015 | 6/12/2015 | | DONE |
Brittany Hill
|
|
|
|
BLD-Final | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | PEND |
Dave Hannah
|
|
|
Per Kent with Veterical Phone #: ###-#### ok for temp occ ok for perm occ after elec and fire oks for perm occ
|
FIRE-Final Inspection | 6/11/2015 | 6/12/2015 | 6/11/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
Zoning Approval | 6/11/2015 | 6/11/2015 | 6/11/2015 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | FAIL |
Jim Page
|
|
|
Exit signs missing
|
BLD-Conference | 5/20/2015 | 5/21/2015 | 5/22/2015 | A | PEND |
Dave Hannah
|
|
|
Kent Phone #: ###-#### ceiling grid ok after elec oks
|
BLD-Framing/Rough-in | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | PASS |
Jim Storey
|
|
|
Kent Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/8/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/8/2015 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 3/17/2015 | 3/17/2015 | 4/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed D.L Evans Bank
|
Routing - PLAN CHECK | 4/2/2015 | | 4/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/2/2015 | | DONE |
|
|
|
NEED GC form and Certificate of Value- 4-6-15 received GC and rev cert of val-emailed Todd the fees due CAN
|
1st review completed | | | 3/26/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 3/17/2015 | | 3/26/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Rating | 3/17/2015 | | 3/19/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Design Review | 3/18/2015 | | 3/19/2015 | | PASS |
Sarah Schafer
|
|
|
Approved per CZC15-00021.
|
Routing - Addressing | 3/17/2015 | | 3/18/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 3/17/2015 | | 3/17/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 3/17/2015 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/17/2015 | | DONE |
|
|
|
|
Application received | | | 3/16/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 16 2015 1:22PM
|