Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-00769
StatusFinaled
Name GAMMILL CONSTRUCTION
Site Address 360 N HEARTHSTONE DR
Project NameStreet Master Suite
Customer Number 
ePlanReviewYes
Description
Master suite remodel per attached drawings. Bedroom addition over existing deck framing. Misc. interior framing per attached plans. Separate electrical, mechanical, hvac.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/27/20158/27/20158/27/2015PPASS
DetailsTony Young
DOC - Permit Finaled8/27/20158/27/20158/27/2015PPASS
DetailsTony Young
BLD-Final8/26/20158/27/20158/27/2015ANR
DetailsTony Young
Tim Phone #: ###-####
BLD-Final8/26/20158/26/20158/26/2015PPEND
DetailsTony Young
Tim Phone #: ###-####
BLD-Final8/25/20158/26/20158/26/2015AFAIL
DetailsTony Young
Tim Phone #: ###-####,, needs plumbing final 1st,, then ok
BLD-Final8/24/20158/25/20158/25/2015APEND
DetailsTony Young
Kim Phone #: ###-####,, ok pending plumbing final
BLD-Final8/21/20158/24/20158/24/2015APEND
DetailsTony Young
Kim Phone #: ###-####
BLD-Final8/21/20158/21/20158/21/2015PPEND
DetailsTony Young
Kim Phone #: ###-####,, ok pending plumbing final
BLD-Energy code compliance4/9/20154/10/20154/10/2015APASS
DetailsTony Young
Someone should be on site late am.. Call Tim at 8660653 if not. Phone #: ###-#### Inspection requested via web by Timothy Gammill
BLD-Wall cover4/8/20154/9/20154/9/2015PNR
DetailsTony Young
Someone should be on site. Call Tim at 8660653 if not. Phone #: ###-#### Inspection requested via web by Timothy Gammill
BLD-Framing/Rough-in4/8/20154/9/20154/9/2015APASS
DetailsTony Young
Someone should be on site. Call Tim at 8660653 if not. Phone #: ###-#### Inspection requested via web by Timothy Gammill
Issue PAID IN FULL permit  3/27/2015 DONE
DetailsChristina Prado
Inspection Record Card- Bld  3/27/2015 DONE
DetailsChristina Prado
Plan assigned to (PEP)3/19/20153/19/20153/26/2015 PASS
DetailsPerry Paine
Routing - FRONT DESK3/26/2015 3/26/2015 PASS
DetailsSue Cummings
Not to be use as a second dwelling unit or an ADU
Routing PW Grading-Hillside3/26/2015 3/26/2015 PASS
DetailsJason C. Taylor
No new foundations are to be poured without hillside approval. JCT ###-####
1st review completed  3/26/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/26/2015 DONE
Permit Ready to Issue  3/26/2015 DONE
requirements met
Routing PW Grading-Hillside3/19/2015 3/20/2015 FAIL
DetailsJason C. Taylor
Overall Site Plan needed. I cannot determine where this demo/addition is to be built fromt he drawing attached. Please show where constrctuion is to occure in overall building layout as the house sits on the lot. Geotechnical report, grading plan, and subgrade may be required based on scope of work. Please provide more information. Jason Taylor ###-####
Intake Approval  3/19/2015 PASS
Recd Pcfee & Taken To Pln CK  3/19/2015 DONE
no fees at intake so they will pay plan review fee when permit is ready
Application received  3/17/2015 DONE
Application submitted via PDS Online on Mar 17 2015 6:25AM
Routing - PLAN CHECK3/19/2015    
DetailsPerry Paine