Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-00778
StatusFinaled
Name KELLER MOVING & CONSTRUCTION
Site Address 14 S LEONA CIR
Project Name 
Customer Number 
ePlanReviewNo
Description
******previous home demo'd****Permit for the construction of a new 1573 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, and a 443 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/14/201510/15/201510/15/2015PPASS
DetailsPhil Shearer
Chris Phone #: ###-####
DOC - Permit Finaled10/15/201510/15/201510/15/2015PPASS
DetailsPhil Shearer
BLD-Final10/12/201510/13/201510/13/2015PFAIL
DetailsPhil Shearer
Chris Phone #: ###-####. *Fire door, Penetrations in the garage, Carbon monoxide detector outside master, House numbers. CN posted
BLD-Wall cover7/29/20157/30/20157/30/2015PPASS
DetailsDave Hannah
Chris Phone #: ###-####
Plan Modification Accepted  7/30/2015 DONE
new manual j
Routing - MECHANICAL7/30/2015 7/30/2015 PASS
DetailsTroy James
resubmitted manual j report
BLD-Framing/Rough-in7/27/20157/28/20157/28/2015PPASS
DetailsPhil Shearer
Kris Phone #: ###-####
BLD-Framing/Rough-in7/24/20157/27/20157/27/2015ANR
DetailsPhil Shearer
Kris Phone #: ###-####
BLD-Framing/Rough-in7/22/20157/24/20157/24/2015AFAIL
DetailsPhil Shearer
Kris Phone #: ###-####. Header over sliding door wrong size header per aproved plans. Air seal.
BLD-Wall Bracing6/25/20156/26/20156/26/2015APASS
DetailsPhil Shearer
Chris Phone #: ###-####
BLD-Wall Bracing6/24/20156/25/20156/25/2015PFAIL
DetailsPhil Shearer
Kris Phone #: ###-#### Nail spacing
BLD-Footing4/27/20154/27/20154/27/2015PPASS
DetailsJim Sly
would like late pm; Fred Phone #: ###-####
BLD-Footing4/21/20154/22/20154/22/2015PCANC
DetailsPhil Shearer
Fred Phone #: ###-####
Issue PAID IN FULL permit  4/9/2015 DONE
OVERRIDE  4/7/2015  
Plan assigned to (CDM)3/26/20153/26/20154/7/2015 PASS
DetailsCarl D Madsen
SFD First review completed
Inspection Record Card- Bld  4/7/2015 DONE
Inspection Record Card- Bld  4/7/2015 DONE
Telephone call  4/7/2015 DONE
called Kris toi let know permit is ready and how much is owed-talked to wife
PLANS/APPL TAKEN TO FRONT DESK  4/7/2015 DONE
Permit Ready to Issue  4/7/2015 DONE
All Requirements Met. ACHD is not needed for previous demo
Routing - MECHANICAL4/6/2015 4/6/2015 PASS
DetailsTroy James
Route to Impact Fee Review3/17/20153/20/20153/26/2015 PASS
DetailsCindy M. Gould
Plan assigned to (JG) 3/17/20153/26/2015 DEFR
DetailsJavier Guzman
3/27 F L1*
Defered to CDM
Routing - PLAN CHECK4/25/2015 3/26/2015 PASS
DetailsCarl D Madsen
1st review completed  3/26/2015 FAIL
Failed pending mechanical
Case Summary (BLD)  3/26/2015 DONE
Routing - MECHANICAL3/19/2015 3/25/2015 FAIL
DetailsTroy James
emailed corrections to air comfort zone
Routing - PLANNING3/19/2015 3/19/2015 PASS
DetailsColleen T Carroll
Routing - Addressing3/17/2015 3/19/2015 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS3/19/2015 3/19/2015 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  3/17/2015 DONE
Intake Approval  3/17/2015 PASS
Recd Pcfee & Taken To Pln CK  3/17/2015 DONE
DetailsCandy A. Nichols
Application received 3/17/2015