BLD-Final | 10/14/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 10/15/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 10/12/2015 | 10/13/2015 | 10/13/2015 | P | FAIL |
Phil Shearer
|
|
|
Chris Phone #: ###-####. *Fire door, Penetrations in the garage, Carbon monoxide detector outside master, House numbers. CN posted
|
BLD-Wall cover | 7/29/2015 | 7/30/2015 | 7/30/2015 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
Plan Modification Accepted | | | 7/30/2015 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 7/30/2015 | | 7/30/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Framing/Rough-in | 7/27/2015 | 7/28/2015 | 7/28/2015 | P | PASS |
Phil Shearer
|
|
|
Kris Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2015 | 7/27/2015 | 7/27/2015 | A | NR |
Phil Shearer
|
|
|
Kris Phone #: ###-####
|
BLD-Framing/Rough-in | 7/22/2015 | 7/24/2015 | 7/24/2015 | A | FAIL |
Phil Shearer
|
|
|
Kris Phone #: ###-####. Header over sliding door wrong size header per aproved plans. Air seal.
|
BLD-Wall Bracing | 6/25/2015 | 6/26/2015 | 6/26/2015 | A | PASS |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
BLD-Wall Bracing | 6/24/2015 | 6/25/2015 | 6/25/2015 | P | FAIL |
Phil Shearer
|
|
|
Kris Phone #: ###-#### Nail spacing
|
BLD-Footing | 4/27/2015 | 4/27/2015 | 4/27/2015 | P | PASS |
Jim Sly
|
|
|
would like late pm; Fred Phone #: ###-####
|
BLD-Footing | 4/21/2015 | 4/22/2015 | 4/22/2015 | P | CANC |
Phil Shearer
|
|
|
Fred Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/9/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/7/2015 | | |
|
|
|
|
Plan assigned to (CDM) | 3/26/2015 | 3/26/2015 | 4/7/2015 | | PASS |
Carl D Madsen
|
|
|
SFD First review completed
|
Inspection Record Card- Bld | | | 4/7/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/7/2015 | | DONE |
|
|
|
|
Telephone call | | | 4/7/2015 | | DONE |
|
|
|
called Kris toi let know permit is ready and how much is owed-talked to wife
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/7/2015 | | DONE |
|
|
|
All Requirements Met. ACHD is not needed for previous demo
|
Routing - MECHANICAL | 4/6/2015 | | 4/6/2015 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 3/17/2015 | 3/20/2015 | 3/26/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (JG) | | 3/17/2015 | 3/26/2015 | | DEFR |
Javier Guzman
|
|
|
3/27 F L1*
Defered to CDM
|
Routing - PLAN CHECK | 4/25/2015 | | 3/26/2015 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 3/26/2015 | | FAIL |
|
|
|
Failed pending mechanical
|
Case Summary (BLD) | | | 3/26/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 3/19/2015 | | 3/25/2015 | | FAIL |
Troy James
|
|
|
emailed corrections to air comfort zone
|
Routing - PLANNING | 3/19/2015 | | 3/19/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 3/17/2015 | | 3/19/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 3/19/2015 | | 3/19/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/17/2015 | | DONE |
|
|
|
|
Intake Approval | | | 3/17/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/17/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 3/17/2015 | | | |
|
|
|
|