Permit Information
Permit NumberBLD15-00802
StatusFinaled
Name MCMILLEN LLC
Site Address 625 N WHITEWATER PARK BLVD
Project NameEsther Simplot Park
Customer Number 
ePlanReviewYes
Description
Buildings and structures for the new Esther Simplot Park adjacent to the Boise River Park.1,689 sq.ft. restroom and 744 sq.ft. (shelter A). 1,264 sq.ft. (shelter B). All park routes and pathways are required to comply as accessible routes see accessibility notes on the plans. See attached documents for crusher fines with stabilizer. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/25/201611/21/2016 DONE
This permit finaled on the web by Joel Niederklein
First Notice 11/13/201611/15/2016 DONE
Mailed 11-16-16
BLD-Final11/3/201611/3/201611/3/2016PPASS
DetailsTony Young
Joel Phone #: ###-####,, ok for perm occ.
FIRE-Final Inspection11/2/201611/3/201611/3/2016APASS
DetailsKatie Marron
Life safety pass. Fire Lane sign posted at rules board. No FE required.
Permanent Occupancy  11/3/2016 DONE
BLD-Final8/22/20168/23/20168/23/2016PPART
DetailsTony Young
Joel Phone #: ###-####,, ok pending final letter of affidavit on all special inspections and engineering
FIRE-Final Inspection8/23/20168/23/20168/23/2016PFAIL
DetailsJim Page
City approved drawings with small documentation not on site at time of inspection, city approved drawings and small documentation need to be onsite for inspection. Need to have signage installed for no parking fire lane, no signage installed at time of inspection. Need to verify if the 3 new structures (two covered outdoor seating area's and one restroom building) require fire extinguishers, based on labeled occupancy type of A3 and B fire extinguishers should be installed for each structure.
Zoning Approval8/19/20168/19/20168/19/2016 PASS
DetailsDavid Moser
Hal, Cody and I walk the site and it looked good
BLD-Aging Inspection7/21/20167/21/20167/22/2016 PASS
DetailsTony Young
BLD-Aging Inspection7/20/20167/20/20167/22/2016 PASS
DetailsTony Young
BLD-Framing/Rough-in3/8/20163/8/20163/8/2016PPART
DetailsTony Young
Nick Phone #: ###-####,, rest room roof and ceiling ok to cover
BLD-Footing11/11/201511/12/201511/12/2015APART
DetailsTony Young
As early as possible Phone #: 2086088340 >> Inspection requested via mobile web by Ryan Casch ,, channel crossing bridge,, cut off walls,, ok pending S. I report
BLD-Foundation11/4/201511/5/201511/5/2015APART
DetailsTony Young
Rebar // Rayn Phone #: ###-####,, rest room footings,, work in progress,, ok pending special inspector report
BLD-Foundation11/2/201511/3/201511/3/2015APASS
DetailsPhil Shearer
Rebar; Ryan Phone #: ###-####
BLD-Foundation10/27/201510/28/201510/28/2015PPART
DetailsTony Young
Ryan Phone #: ###-####,, ok pending special inspection
BLD-Foundation10/22/201510/23/201510/23/2015APASS
DetailsMike Jordan
Ryan Phone #: ###-####. COlumn pad footings for Shelter B ok. Will have special inspection as well.
BLD-Foundation10/16/201510/16/201510/16/2015PPASS
DetailsDave Hannah
rebar; Ryan Phone #: ###-####
Issue PAID IN FULL permit  9/28/2015 DONE
DetailsCarlos Velazquez
Print Occupancy Form  9/28/2015 DONE
DetailsCarlos Velazquez
Routing - PLAN CHECK9/16/2015 9/16/2015 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/16/2015 DONE
Permit Ready to Issue  9/16/2015 DONE
DetailsChristina Prado
** All requirements met as of 9/21/15***
*NEED RP, ACHD**** all others received, GC form and Certificate of value from GC for current value- the last cert of value we have is from april
no ESC on the b.permit-received GC and rev cert of val
Plan assigned to (CDM)4/7/2015 9/16/2015 PASS
DetailsCarl D Madsen
New duew 5-7 First review completed
Routing PW Flood Plain9/9/2015 9/10/2015 PASS
DetailsJim Wyllie
Routing - PUBLIC WORKS9/9/2015 9/9/2015 PASS
DetailsJennifer Bruner
BLD-Concrete7/31/20157/31/20158/3/2015PPART
DetailsDave Hannah
Approved fishing dock abutment for concrete placement. 3rd party inspection had been performed and passed on geotech and reinforced concrete. Contractor was informed that they were proceeding at own risk as permit has not been issued. Inspection request made by John Tensen/Jim Wylie.
Override - Parcel Holds  8/3/2015  
Routing Off Site - STRUCTURAL5/27/2015 6/22/2015 PASS
DetailsCarl D Madsen
Routing - PLUMBING6/22/2015 6/22/2015 PASS
DetailsDaryl Spivey
See redline notes on plumbing plans
Routing - PLAN CHECK5/27/2015 6/22/2015 FAIL
DetailsCarl D Madsen
Routing PW Flood Plain5/27/2015 6/22/2015 FAIL
DetailsJim Wyllie
Failed in E-Plan
Routing - FIRE5/27/2015 6/1/2015 PASS
DetailsScott Arellano
Attached Fire Review comments to plans.
Routing - PUBLIC WORKS5/27/2015 5/27/2015 PASS
DetailsJennifer Bruner
Routing - PLAN CHECK5/14/2015 5/19/2015 FAIL
DetailsCarl D Madsen
there are over 20 new sheets that have been uploaded incorrectly.
Routing - PUBLIC WORKS5/14/2015 5/14/2015 PASS
DetailsJennifer Bruner
Route to Impact Fee Review5/8/20155/11/20155/12/2015 PASS
DetailsCindy M. Gould
Routing PW Flood Plain4/7/2015 5/8/2015 FAIL
DetailsJim Wyllie
Routing PW Solid Waste4/7/2015 5/8/2015 PASS
DetailsPeter J. McCullough
1st review completed  5/8/2015 FAIL
Routing - PUBLIC WORKS4/7/2015 5/8/2015 PASS
DetailsConnie Baumgartner
per Connie Baumgartner
Routing Off Site - STRUCTURAL4/7/2015 5/6/2015 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK4/7/2015 5/6/2015 FAIL
DetailsCarl D Madsen
Routing - FIRE4/7/2015 4/14/2015 FAIL
DetailsScott Arellano
Emailed report to architect. Attached report to case.
Routing PW Sewer Design4/7/2015 4/9/2015 PASS
DetailsKyle S. Rosenmeyer
Separate submittal for mainline sewer extension being review by Public Works.
Routing - PLANNING4/7/2015 4/8/2015 PASS
DetailsDavid Moser
Intake Approval  4/7/2015 PASS
DetailsJohn Menard
Routing PW Sewer Rating4/7/2015 4/7/2015 PASS
DetailsConnie Baumgartner
Routing - PLUMBING4/7/2015 4/7/2015 FAIL
DetailsDaryl Spivey
Need set of engineered stamped set of plumbing plans.
Application received  3/19/2015 DONE
Application submitted via PDS Online on Mar 19 2015 9:59AM
Routing - PLUMBING5/14/2015   CANC
No plumbing plans attached.
Pending Assignment by JCM4/7/2015    
DetailsJohn Menard