Third Notice | | 2/16/2016 | 3/15/2016 | | DONE |
|
|
|
|
Third Notice | | 1/19/2016 | 2/11/2016 | | DONE |
|
|
|
|
Third Notice | | 12/15/2015 | 1/14/2016 | | DONE |
|
|
|
|
Third Notice | | 11/14/2015 | 12/10/2015 | | DONE |
|
|
|
sent with letter
|
Third Notice | | 10/18/2015 | 11/9/2015 | | DONE |
|
|
|
|
Third Notice | | 9/20/2015 | 10/13/2015 | | DONE |
|
|
|
|
Second Notice | | 8/20/2015 | 9/15/2015 | | DONE |
|
|
|
Mailed 9/16/15
|
First Notice | | 8/9/2015 | 8/10/2015 | | DONE |
|
|
|
Mailed 8/11/15
|
Permanent Occupancy | | | 7/30/2015 | | DONE |
|
|
|
|
BLD-Final | 7/28/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-####
|
FIRE-Final Inspection | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | DONE |
Phil Shearer
|
|
|
Dan Phone #: ###-####
|
BLD-Final | 7/23/2015 | 7/24/2015 | 7/24/2015 | P | NR |
Phil Shearer
|
|
|
Dan Phone #: ###-####
|
FIRE-Final Inspection | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | FAIL |
Troy Cobbley
|
|
|
Previous corrections have been addressed however there are issues with the project related fire alarm permit. The life safety can be finaled when the fire alarm permit is passed.
|
BLD-Final | 7/8/2015 | 7/9/2015 | 7/9/2015 | P | PART |
Phil Shearer
|
|
|
For temp - Dan Phone #: ###-####. OK for temp
|
FIRE-Final Inspection | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | PART |
Jim Page
|
|
|
TCO authorized per conversation with Scott Arellano for stocking of shelves/employee training for 30 days, no public access under TCO. Emergency egress lighting tested/operational, fire extinguishers in place, exit signs noted on city approved plans are in place. Instructed general contractor the discharge landings need egress lighting installed, exit sign needs to be installed over doorway discharging from storage/cooler area to main floor, will verify at final tenant inspection.
|
BLD-Energy code compliance | 6/16/2015 | 6/17/2015 | 6/17/2015 | P | PASS |
Jim Sly
|
|
|
Glen Phone #: ###-####
|
BLD-Framing/Rough-in | 6/15/2015 | 6/16/2015 | 6/16/2015 | A | PASS |
Phil Shearer
|
|
|
Glen Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/29/2015 | | DONE |
|
|
|
|
Inspector's copy Bld permit | | | 5/29/2015 | | DONE |
|
|
|
|
Inspector's copy Bld permit | | | 5/29/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/29/2015 | | DONE |
|
|
|
|
Routing - FIRE | 5/13/2015 | 5/13/2015 | 5/22/2015 | | PASS |
Scott Arellano
|
|
|
Attached revised comments to plans.
|
Routing - PLAN CHECK | 5/22/2015 | | 5/22/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/22/2015 | | DONE |
|
|
|
all requirments met
|
Plan assigned to (CDM) | 4/15/2015 | | 5/22/2015 | | PASS |
Carl D Madsen
|
|
|
level 3 due 5/8 First review completed
|
Routing - PLAN CHECK | 5/13/2015 | | 5/19/2015 | | FAIL |
Carl D Madsen
|
|
|
Only two of the four plan review items have been addressed.
|
1st review completed | | | 5/8/2015 | | FAIL |
|
|
|
|
Routing - Design Review | 4/15/2015 | | 5/8/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 4/15/2015 | | 5/8/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 4/15/2015 | | 4/27/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to architect. Attached report to case.
|
Routing - PLUMBING | 4/15/2015 | | 4/20/2015 | | PASS |
Daryl Spivey
|
|
|
DCVA required on building water service and may require additional backflow protection on icemaker and other equipment.
|
Routing - PUBLIC WORKS | 4/15/2015 | | 4/16/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/15/2015 | | DONE |
|
|
|
|
Routing - Addressing | 4/15/2015 | | 4/15/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - Design Review | 4/15/2015 | | 4/15/2015 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 4/10/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 4/8/2015 | | FAIL |
Tim L. Woodard
|
|
|
David,
Please upload the following required items: "Interior Lighting / Exterior Lighting Com-check" and "Mechanical Com-check".
Best regards,
Tim Woodard
Plans Examiner II
City of Boise
twoodard@cityofboise.org
###-####
|
Telephone call | | | 4/8/2015 | | DONE |
Tim L. Woodard
|
|
|
Talked with ESC ok with referenceing ESC15-00285 since same contractor and interior slab removal was supposidly already done under past vanilla TI permit BLD15-00456.
|
Application received | | | 3/19/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 19 2015 10:54AM
|
Routing - Erosion and Sediment | 4/15/2015 | | | | CANC |
Evan Jenkins
|
|
|
No Permit Required under this permit.
|