Third Notice | | 1/18/2016 | 1/19/2016 | | DONE |
|
|
|
This permit finaled on the web by Jody Wilson
|
Second Notice | | 12/20/2015 | 1/13/2016 | | DONE |
|
|
|
Mailed 1-14-16
|
First Notice | | 11/12/2015 | 12/10/2015 | | DONE |
|
|
|
Mailed 12-11-15
|
Letter of compliance/Occupancy | | | 11/2/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/2/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/2/2015 | | DONE |
|
|
|
|
BLD-Final | 10/30/2015 | 10/30/2015 | 10/30/2015 | P | PASS |
Jim Storey
|
|
|
no card on site
|
Zoning Approval | 10/30/2015 | 10/30/2015 | 10/30/2015 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 9/25/2015 | 9/28/2015 | 9/28/2015 | A | DONE |
Jim Storey
|
|
|
Steve Phone #: ###-####
|
BLD-Final | 9/24/2015 | 9/28/2015 | 9/28/2015 | A | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-#### // change day and time per Steve from K2 final ok pending others
|
Temporary Occupancy | 9/28/2015 | 12/27/2015 | 9/28/2015 | | DONE |
Christina Prado
|
|
|
|
PubWorks Occupancy Approval | 9/28/2015 | 9/28/2015 | 9/28/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval Temp | 9/28/2015 | 9/28/2015 | 9/28/2015 | | PASS |
Josh Wilson
|
|
|
90 day temp occ.- bond is in place for landscaping and lighting in place
|
FIRE-Final Inspection | 9/24/2015 | 9/25/2015 | 9/25/2015 | P | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
BLD-Conference | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | DONE |
Jim Storey
|
|
|
Steve Phone #: ###-#### occ load sign all sign offs
|
BLD-Wall Bracing | 9/11/2015 | 9/14/2015 | 9/14/2015 | A | PASS |
Jim Storey
|
|
|
Steve-wall barrier Phone #: ###-#### c/n made ok vapor above ceilling ok
|
BLD-Ceiling Grid Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 | P | PASS |
Jim Storey
|
|
|
Steve-wall barrier Phone #: ###-#### pending others ok to cover
|
BLD-Ceiling Grid Inspection | 9/3/2015 | 9/8/2015 | 9/8/2015 | A | NR |
Mike Jordan
|
|
|
Steve Phone #: ###-####. Needs electrical and mech. rough in inspections first.
|
BLD-Energy code compliance | 8/11/2015 | 8/12/2015 | 8/12/2015 | A | PASS |
Jim Storey
|
|
|
Steve-wants 1st thing AM Phone #: ###-#### above ceilling need vapor barrior to meet flame spread.
|
BLD-Framing/Rough-in | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | PASS |
Jim Storey
|
|
|
Late morning - Steve Phone #: ###-####
|
BLD-Wall cover | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | PASS |
Jim Storey
|
|
|
nailing for roof also // Steve Phone #: ###-#### hd at restarm ok to cover
|
BLD-Other | 7/20/2015 | 7/21/2015 | 7/21/2015 | P | PASS |
Jim Storey
|
|
|
slab on grade reinforcement - Steve Phone #: ###-####
|
BLD-Footing | 7/9/2015 | 7/10/2015 | 7/10/2015 | A | PASS |
Jim Storey
|
|
|
rebar for stem walls, requesting 11 AM - Steve Phone #: ###-#### si on site
|
BLD-Foundation | 7/7/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Jim Storey
|
|
|
Change day Per Steve-rebar Phone #: ###-####
|
Plan Reviewer's activity | | | 7/6/2015 | | DONE |
|
|
|
Minor changes by ACHD were shown to Brian M. (Grading and Drainage) and Josh W. (DR). Changes do not need Plan Mod. so the new sheets were uploaded and batch stamped. TLW
|
Issue PAID IN FULL permit | | | 6/25/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/25/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/24/2015 | | |
|
|
|
|
Routing - PLANNING Land Div | 6/24/2015 | | 6/24/2015 | | PASS |
Leon Letson
|
|
|
Approved in E-Plan Review. TLW
|
Routing - Addressing | 6/24/2015 | | 6/24/2015 | | PASS |
Emily Dixon
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/24/2015 | | DONE |
Christina Prado
|
|
|
**ALL REQUIREMENTS MET 6-24-15 BLH** Pending Gc, RP & Revised Cert of value for issuance
|
Plan assigned to (TLW) | 5/4/2015 | | 6/24/2015 | | PASS |
Tim L. Woodard
|
|
|
2nd Review Complete New Commercial - ePlan - Popeye's - Reassigned from John
|
Routing - Addressing | 6/9/2015 | | 6/16/2015 | | FAIL |
Emily Dixon
|
|
|
|
Routing - PLANNING Land Div | 6/9/2015 | | 6/16/2015 | | FAIL |
Dave Abo
|
|
|
Must complete Record of Survey but recording deeds and obtaining new tax parcel numbers.
|
Routing - PLUMBING | 6/9/2015 | | 6/11/2015 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Plan resubmittals received | | | 6/9/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/28/2015 | | 5/18/2015 | | PASS |
John Menard
|
|
|
|
Routing PW Sewer Rating | 4/28/2015 | | 5/5/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plan assigned to (JCM) | 3/24/2015 | | 5/4/2015 | | DEFR |
John Menard
|
|
|
1st Review Complete 3/31/2015
Reassigned to Tim Woodard.
|
Routing - PLUMBING | 4/28/2015 | | 5/1/2015 | | FAIL |
Daryl Spivey
|
|
|
Fixtures on grease line are required to be vented per ISPC.
Not addressed from last review and changemark.
|
Routing PW Drainage | 4/28/2015 | | 4/30/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 4/28/2015 | | 4/30/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Design Review | 4/28/2015 | | 4/30/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 4/28/2015 | | 4/29/2015 | | PASS |
John Menard
|
|
|
|
Routing - Addressing | 4/28/2015 | | 4/29/2015 | | FAIL |
Emily Dixon
|
|
|
Parcel have not yet been consolidated.
|
Routing Off Site - C.D.H | 4/28/2015 | | 4/29/2015 | | PASS |
John Menard
|
|
|
|
Routing - MECHANICAL | 4/28/2015 | | 4/28/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING Land Div | 4/28/2015 | | 4/28/2015 | | FAIL |
Dave Abo
|
|
|
Parcels must be combined. Assessor's map on 4/28/15 still show original lot lines.
|
Routing - PUBLIC WORKS | 4/28/2015 | | 4/28/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 4/28/2015 | | 4/28/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
POPEYES RESTAURANT - To construct a new 2,925 square foot, one story, wood framed fast food restaurant building with drive-thru window. This permit also includes related site improvements. AND SITE WORK, plus major Grading, Swales and Seepage Beds
|
Route to Impact Fee Review | 4/14/2015 | 4/17/2015 | 4/15/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing Off Site - C.D.H | 3/24/2015 | | 4/15/2015 | | FAIL |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 3/24/2015 | | 4/8/2015 | | FAIL |
John Menard
|
|
|
|
1st review completed | | | 4/8/2015 | | DONE |
John Menard
|
|
|
|
Routing PW Sewer Design | 3/25/2015 | | 4/3/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Please use existing sewer stub, believed to be within a couple feet of the tap location shown.
|
Routing - Design Review | 3/24/2015 | | 4/1/2015 | | FAIL |
Josh Wilson
|
|
|
Modify street tree speceis to comply with DRH15-00046
|
Routing - FIRE | 3/24/2015 | | 4/1/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLAN CHECK | 3/24/2015 | | 3/31/2015 | | FAIL |
John Menard
|
|
|
|
Routing - PLANNING | 3/24/2015 | | 3/31/2015 | | PASS |
Leon Letson
|
|
|
|
Routing - MECHANICAL | 3/24/2015 | | 3/30/2015 | | FAIL |
Troy James
|
|
|
Need P4 sheet, missing
|
Routing PW Drainage | 3/25/2015 | | 3/27/2015 | | FAIL |
Brian Murphy
|
|
|
needs variance for seepage bed design
|
Routing PW Solid Waste | 3/25/2015 | | 3/26/2015 | | PASS |
Megan Durrell
|
|
|
Occupant be advised that access to trash enclosure restricted if cars in the drive-thru or in adjacent parking stalls.
|
Routing PW Environmental | 3/25/2015 | | 3/25/2015 | | PASS |
Terry Alber
|
|
|
1500-Gallon Grease Interceptor shown is acceptable.
|
Routing PW Street Lights | 3/25/2015 | | 3/25/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lgihting required.
|
Routing PW Sewer Rating | 3/25/2015 | | 3/25/2015 | | FAIL |
Jennifer Bruner
|
|
|
Finaled parcel needed for sewer rating.
|
Routing - PUBLIC WORKS | 3/24/2015 | | 3/25/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 3/24/2015 | | 3/25/2015 | | FAIL |
Evan Jenkins
|
|
|
It appears you have broken the Parcel into 2 separate ones. You will need an ESC Permit for Both (ESC Narrative & Site Maps For Both Parcels),due to mass grading, installation of seepage beds and swales, and the same requirement goes with the adjacent parcels that were purchased and broken up into separate Commercial Properties.
NEW 3000 S.F. POPEYES AND SITE WORK, plus major Grading, Swales and Seepage Beds
|
Routing - PLUMBING | 3/24/2015 | | 3/24/2015 | | FAIL |
Daryl Spivey
|
|
|
Grease lines not vented per code and filtered water required a RPBP and other equipment may require additional protection as needed.
|
Routing - PLANNING Land Div | 3/24/2015 | | 3/24/2015 | | FAIL |
Dave Abo
|
|
|
Must combine lots to create buildable parcels prior to issuance of building permit.
|
Routing - Addressing | 3/24/2015 | | 3/24/2015 | | FAIL |
Emily Dixon
|
|
|
Address should be 1612 S Broadway Ave. Please use parcel from ROS15-00025 once it is finalized.
|
Intake Approval | | | 3/24/2015 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 3/24/2015 | | 3/24/2015 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 3/23/2015 | | FAIL |
Tim L. Woodard
|
|
|
Jeff,
Please submit the following forms and plans for this permit submittal: Soils and geotech report, #310 Special Inspection Form, Shallow Injection Well Inventory Form, Site Drainage Report, Drainage System O&M Plan, ESC Narritive, and ESC PLAN.
Best regards,
Tim Woodard
City of Boise / Plan Reviewer II
twoodard@cityofboise.org
|
Application received | | | 3/20/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 20 2015 12:22PM
|