Print Statement | | | 12/22/2015 | | DONE |
|
|
|
|
First Notice | | 11/30/2015 | 12/10/2015 | | DONE |
|
|
|
Mailed 12-11-15
|
BLD-Final | 11/19/2015 | 11/20/2015 | 11/20/2015 | A | PASS |
Jim Storey
|
|
|
Bruce Phone #: ###-####
|
Permanent Occupancy | | | 11/20/2015 | | DONE |
|
|
|
|
Temporary Occupancy | 11/17/2015 | 2/15/2016 | 11/17/2015 | | DONE |
Candy A. Nichols
|
|
|
as per Jason B. ok for a 30 day temp c of o starting from 11-12-15
|
Telephone call | | | 11/16/2015 | | DONE |
|
|
|
called Bruce to let know the temp c of o is expiring-he will email Jason B
|
BLD-Final | 11/3/2015 | 11/4/2015 | 11/4/2015 | A | FAIL |
Mike Jordan
|
|
|
Bruce Phone #: ###-####. Remove deadbolt from 2nd. story exit, handrails are required on exterior ramp.
|
Zoning Approval | 11/3/2015 | 11/3/2015 | 11/3/2015 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 10/28/2015 | 10/29/2015 | 10/29/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete for entire project.
|
BLD-Aging Inspection | 10/22/2015 | 10/22/2015 | 10/23/2015 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 8/13/2015 | 8/14/2015 | 8/14/2015 | P | PART |
Dave Hannah
|
|
|
Early afternoon - Bruce Phone #: ###-#### ok to occ the first floor
|
Temporary Occupancy | 8/14/2015 | 11/12/2015 | 8/14/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Meeting | | | 8/14/2015 | | DONE |
|
|
|
as per Andrea Tuning-ok for temp c of o on 1st floor only
|
FIRE-Final Inspection | 8/12/2015 | 8/13/2015 | 8/13/2015 | P | PART |
Jim Page
|
|
|
Life fire safety complete for first floor, excluding elevator lobby, elevator lobbies and 2nd floor to be scheduled at a later date when work is complete.
|
FIRE-Final Inspection | 8/11/2015 | 8/12/2015 | 8/12/2015 | A | CANC |
Jim Page
|
|
|
Per Bruce with Bruce Cooper Const. Inc Phone #: ###-####
|
BLD-Conference | 8/6/2015 | 8/7/2015 | 8/7/2015 | A | PASS |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Energy code compliance | 7/27/2015 | 7/27/2015 | 7/27/2015 | P | PART |
Tony Young
|
|
|
Bruce Phone #: ###-####,, work in progress,, ok
|
BLD-Framing/Rough-in | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Wall Bracing | 7/8/2015 | 7/8/2015 | 7/9/2015 | P | FAIL |
Dave Hannah
|
|
|
bruce Phone #: ###-#### over shot nails in osb needs to renail
|
BLD-Footing | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | PASS |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Footing | 6/5/2015 | 6/8/2015 | 6/9/2015 | P | PASS |
Dave Hannah
|
|
|
Bruce- Phone #: ###-####
|
BLD-Footing | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | NR |
Dave Hannah
|
|
|
Bruce-would like at 10 AM Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/22/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/22/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 5/18/2015 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/13/2015 | | 5/18/2015 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2015 | | DONE |
Christina Prado
|
|
|
Need Revised certificate of Value, GC & RP
|
Plan assigned to (CJW) | 3/30/2015 | | 5/18/2015 | | PASS |
Carl Westfall
|
|
|
DR. DAVID GEE MEDICAL OFFICE - level 3 - (15 days - Apr 17) - ePlan
|
Routing - PLAN CHECK | 5/10/2015 | | 5/13/2015 | | PASS |
Carl Westfall
|
|
|
On vacation until May 13, 2015. Resubmittal review started then.
(5-13-15) Drawings approved. Wating for the Consulating Structural Engineer's resubmittal review.
(5-18-15) Approved by Structural
|
Plan resubmittals received | | | 5/10/2015 | | DONE |
|
|
|
Submitted on a Sunday. Since the Plans Examiner was on vacation, resubmittal review started on May 13, 2015.
|
1st review completed | | | 4/20/2015 | | FAIL |
|
|
|
Failed Structural and Building
|
Plan resubmittals requested | | | 4/20/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/30/2015 | | 4/20/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - FIRE | 3/30/2015 | | 4/6/2015 | | PASS |
Scott Arellano
|
|
|
Attached conditions of approval to plans.
|
Routing Off Site - STRUCTURAL | 3/30/2015 | | 4/6/2015 | | FAIL |
Carl Westfall
|
|
|
Chris Holladay
|
Routing PW Sewer Rating | 3/30/2015 | | 3/30/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Design Review | 3/30/2015 | | 3/30/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLUMBING | 3/30/2015 | | 3/30/2015 | | PASS |
Daryl Spivey
|
|
|
No review required
|
Routing - PUBLIC WORKS | 3/30/2015 | | 3/30/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 3/30/2015 | | 3/30/2015 | | PASS |
Evan Jenkins
|
|
|
New ADA elevator & interior modifications
Minor earth disturbance
|
Intake Approval | | | 3/30/2015 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 3/30/2015 | | 3/30/2015 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 3/23/2015 | | FAIL |
Tim L. Woodard
|
|
|
Lynn,
Please upload a copy of the #502 Submittal Checklist into the "Documents Folder". Take care to verify all required items in that checklist are uploaded with the submittal. Some documents I see missing are: Fire Flow letter, DR Approval letter, #304 Registered Design Proffessional Form, and Verification of Legal Lot Form. If you have any questions please call to discuss.
Best regards,
Tim Woodard
City of Boise / Plans Examiner II
twoodard@cityofboise.org
208 384 3817
|
Application received | | | 3/21/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 21 2015 11:59AM
|