BLD-Final | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Tony Young
|
|
|
would like call ahead; Brian Phone #: ###-####
|
DOC - Permit Finaled | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 9/16/2016 | 9/16/2016 | 9/16/2016 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 9/7/2016 | 9/7/2016 | 9/8/2016 | P | NR |
Tony Young
|
|
|
Brian Phone #: ###-####,, conference only,, need trades, PW
|
BLD-Aging Inspection | 8/19/2016 | 8/19/2016 | 8/22/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | PART |
Tony Young
|
|
|
Brian Phone #: ###-####,, walk through for final... trades,, hand/guardrails,, hillside,, etc
|
BLD-Energy code compliance | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Tony Young
|
|
|
Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 3/25/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Tony Young
|
|
|
Brian Phone #: ###-####,, ok to insulate pending trades
|
BLD-Framing/Rough-in | 3/23/2016 | 3/23/2016 | 3/25/2016 | P | PEND |
Dave Hannah
|
|
|
Brian Phone #: ###-#### needs other trades rough ins fire stopping around fire places soffits around plumbing in garage fix eve framing
|
BLD-Wall Bracing | 2/1/2016 | 2/2/2016 | 2/2/2016 | A | PASS |
Tony Young
|
|
|
Brian Phone #: ###-####
|
BLD-Other | 11/19/2015 | 11/19/2015 | 11/20/2015 | P | DEFR |
Tony Young
|
|
|
Brian// inspection for the hydro heating pipes// please call before Phone #: ###-####,, needs mechanical permit for this
|
Case Summary (BLD) | | | 11/17/2015 | | DONE |
|
|
|
|
BLD-Foundation | 10/27/2015 | 10/27/2015 | 10/27/2015 | P | PART |
Tony Young
|
|
|
Dave Phone #: ###-####,, walls are work in progress,, ok
|
BLD-Footing | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | PASS |
Phil Shearer
|
|
|
Dave Phone #: ###-####
|
PubWorks Subgrade Approval | 10/7/2015 | 10/7/2015 | 10/7/2015 | | DONE |
Jason C. Taylor
|
|
|
***ALL FOOTINGS, COLUMNS, A RETAINING WALLS FOR WEST SIDE OF RESIDENCE***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 7/29/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/2/2015 | | |
|
|
|
|
Plan assigned to (JG) | 4/3/2015 | 4/3/2015 | 6/2/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 4/21 T L2 Hillside** Pending Fire and ESC
|
Inspection Record Card- Bld | | | 6/2/2015 | | DONE |
|
|
|
|
Telephone call | | | 6/2/2015 | | DONE |
|
|
|
called Brian- left message of fees due and permit is ready for pick up
|
Routing - PLAN CHECK | 5/28/2015 | | 6/2/2015 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 6/2/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/2/2015 | | DONE |
|
|
|
All Requirements Met. Parcel Owner is GC and RP
|
Routing - Erosion and Sediment | 5/29/2015 | | 6/1/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A, Class A Roof, Permit for the construction of a new 2250 sq. ft., two story (upper level 550 sq. ft., main level 1700 sq. ft. and a finished basement 785 sq. ft. ) single family dwelling with 1 bedroom, 2.5 bathrooms, approximately 533 sq. ft. of covered patio/porch and a 475 sq. ft. attached garage per the approved plans. PLAN MODIFICATION DUE TO INITIAL REVIEW, NO ESC SITE MAP.
|
Plan resubmittals received | | | 5/29/2015 | | DONE |
|
|
|
received two copies of Erosion Plan (C1.1)
|
Routing - FIRE | 5/28/2015 | 5/28/2015 | 5/28/2015 | | PASS |
Scott Arellano
|
|
|
Attached updated comments to plans.
|
Telephone call | | | 5/28/2015 | | DONE |
Scott Arellano
|
|
|
Spoke with Brian Baker regarding fire code correction items. Brian confirmed that the building owners solution to both items would be to fire sprinkler the proposed residence in accordance with NFPA 13D. A separate fire sprinkler permit will be required.
|
Routing - PLAN CHECK | 5/18/2015 | | 5/18/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 5/15/2015 | | 5/15/2015 | | FAIL |
Javier Guzman
|
|
|
Missing 2 plan sheet from second set
|
Plan resubmittals received | | | 5/12/2015 | | DONE |
|
|
|
received plans D1-D4, S1 & S4, Geotech Report, Updated ResCheck
|
1st review completed | | | 4/23/2015 | | FAIL |
Javier Guzman
|
|
|
pass the timeframe was waiting for fire to review
|
Routing - FIRE | 4/20/2015 | | 4/23/2015 | | FAIL |
Scott Arellano
|
|
|
Attached plan review report to case. Emailed applicant report.
|
Routing - PLAN CHECK | 4/3/2015 | | 4/22/2015 | | FAIL |
Javier Guzman
|
|
|
emailed review report to applicant
|
Routing - Erosion and Sediment | 4/14/2015 | | 4/15/2015 | | FAIL |
Andy J. Long
|
|
|
SWPPP narrative submitted and approved. Valid Plan Designer, homeowner to be RP and GC.
Failed review due to no ESC site plan map provided. Called PD Todd Arnold to inform (left VM)
|
Routing - MECHANICAL | 4/10/2015 | | 4/14/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/8/2015 | | 4/10/2015 | | PASS |
Todd Tucker
|
|
|
|
Routing - PUBLIC WORKS | 4/6/2015 | | 4/8/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Grading-Hillside | | | 4/6/2015 | | PASS |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 4/3/2015 | | 4/6/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/3/2015 | | DONE |
|
|
|
|
Intake Approval | | | 4/3/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/3/2015 | | DONE |
|
|
|
|