Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD15-00859
StatusFinaled
Name ALTENERGY INC
Site Address 813 N 20TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the placement of 384s.f. of solarvoltaic panel on the roof of an existing detached structure in the rear yard of an existing single family dwelling. THIS SPECIFIC STRUCTURE PER THE FIRE DIVISION OF PDS IS NOT CLASSED AS A RESIDENTIAL / SINGLE FAMILY DWELLING AND THEREFORE THE SUBMITTED PANEL LAYOUT IS ACCEPTABLE. THIS TYPE OF PROJECT WILL BE ROUTE TO THE FIRE DIVISION ON AN INDEVIDUAL BASIS UNTIL THE CITY OF BOISE HAS DETERMINED A PRESCRIPTIVE APPROVED METHOD OF PERMITTING. Separate electrical permits are required. This ppermit may not be finaled until engineering from an Idaho liscensed engineef's seal is provided for the Ironridge support frame. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/1/20155/1/20155/1/2015APASS
DetailsDave Hannah
DOC - Permit Finaled5/1/20155/1/20155/1/2015PPASS
DetailsDave Hannah
BLD-Conference4/30/20154/30/20155/1/2015PPASS
DetailsDave Hannah
Will Meet on site. We will call to schedule a time. Phone #: ###-#### Inspection requested via web by Matthew Dunay
BLD-Conference4/29/20154/30/20154/30/2015ANR
DetailsDave Hannah
Inspection requested via web by Matthew Dunay needs elec final
Routing Walk-In (BLD)3/25/20153/25/20153/26/2015PDONE
DetailsPerry Paine
Inspection Record Card- Bld  3/26/2015  
1st review completed  3/26/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/26/2015 DONE
Permit Ready to Issue  3/26/2015 DONE
All Requirements Met
Telephone call  3/26/2015 DONE
called David- told him permit is ready for pick up and fees due- for both BLD and ELE
Issue PAID IN FULL permit  3/26/2015 DONE
Routing Walk-In (Zoning)3/24/20153/24/20153/24/2015APASS
DetailsTodd Tucker
Routing Walk-In (BLD)3/24/20153/24/20153/24/2015AFAIL
DetailsPerry Paine
Plan assigned to (PEP)3/24/20153/24/20153/24/2015 FAIL
DetailsPerry Paine
1st review completed  3/24/2015 FAIL
Application received 3/24/2015