Permit Information
Permit NumberBLD15-00860
StatusFinaled
Name INTERMOUNTAIN PROPERTY SERVICE
Site Address 11880 W PRESIDENT DR STE Unit: A
Project Name 
Customer Number 
ePlanReviewNo
Description
(WICK AND VAPE OFFICE) (Suites A & B) For tenant improvements to an existing 3,200 sq. ft. tenant space with work to include the removal of infill in an existing overhead door opening and the installation of a new overhead door per the approved plans. The Wick And Vape occupancy was completed under BLD15-00081. This building is fully fire sprinklered for area increase. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/20/20159/30/2015 DONE
Third Notice 8/17/20159/15/2015 DONE
Third Notice 7/14/20158/12/2015 DONE
Second Notice 6/20/20157/9/2015 DONE
Mailed 7-10-15
First Notice5/7/20155/7/20156/10/2015 DONE
DetailsMike Jordan
Mailed out 6-10-15
BLD-Final5/6/20155/7/20155/7/2015PPASS
DetailsMike Jordan
Scott Phone #: ###-####
DOC - Permit Finaled5/7/20155/7/20155/7/2015PPASS
DetailsMike Jordan
FIRE-Final Inspection5/6/20155/7/20155/7/2015APASS
DetailsTroy Cobbley
Life safety passed. Project is addressed as Suite "B" but there is no "B" on the building. A "B" will need to be added or plan review will need to be contacted to change prior to a building sign off.
Plan assigned to (CDM)3/25/20153/25/20153/25/2015 PASS
DetailsCarl D Madsen
due 3/31
Routing - PLAN CHECK3/25/2015 3/25/2015 PASS
DetailsCarl D Madsen
Routing - Design Review3/25/2015 3/25/2015 PASS
DetailsJosh Wilson
1st review completed  3/25/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/25/2015 DONE
Case Summary (BLD)  3/25/2015 DONE
Permit Ready to Issue  3/25/2015 DONE
Need a Revised Cert of Value & GC Form
Inspection Record Card- Bld  3/25/2015 DONE
Telephone call  3/25/2015 DONE
DetailsChristina Prado
called Steven to advise permit is ready pending Gc & Revised Cert of Value
Issue PAID IN FULL permit  3/25/2015 DONE
Intake Approval  3/25/2015 PASS
Recd Pcfee & Taken To Pln CK  3/25/2015 DONE
Plans ACCEPTED BY PLAN TECH  3/24/2015 DONE
Application received 3/24/2015