Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-00866
StatusFinaled
Name IDAHO STONE LTD COMPANY
Site Address 2132 S BROADWAY AVE
Project NameDomino's Pizza Bakery Store
Customer Number 
ePlanReviewNo
Description
(DOMINO’S PIZZA BAKERY STORE – Broadway Park) Permit is to combine a 1,162 square foot restaurant with the adjacent 2,332 square foot retail tenant space to create a 2,873 square foot restaurant space after common area and exterior walls were removed from total. (*NOTE*- Existing one hour horizontal assembly was found to be non-compliant in the field. A new detail and UL assembly were submitted for record. This assembly is a suspended one hour assembly UL L570.) The wall to the south of this tenant space was upgraded to a 2 hour “area separation wall” under previous permits. Approval contingent upon adhering to the approved plans on file. Work to include: (construct new interior non-bearing walls to create: 2 accessible restrooms, a manager’s office, and to isolate a back storage section), demolition of existing non-bearing walls to combine the spaces, installation of new interior millwork / sneeze guards, new fixed seats, relocate existing walk-in cooler, new mechanical, new plumbing, new electrical, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is not fire sprinklered; a separate commercial cooking hood fire suppression permit is required. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/22/201510/28/2015 DONE
This permit finaled on the web by Paula Swensen
First Notice 9/21/201510/12/2015 DONE
Mailed 10-13-15
BLD-Final9/11/20159/11/20159/11/2015PPASS
DetailsJim Storey
Ken Phone #: ###-####
FIRE-Final Inspection9/9/20159/10/20159/11/2015APASS
DetailsJim Page
Life fire safety passed/complete
Permanent Occupancy  9/11/2015 DONE
BLD-Final9/8/20159/8/20159/8/2015PNR
DetailsMike Jordan
Ken Phone #: ###-####
BLD-Ceiling Grid Inspection9/3/20159/4/20159/4/2015APASS
DetailsMike Jordan
Paula Phone #: ###-####
BLD-Framing/Rough-in8/26/20158/27/20158/27/2015APASS
DetailsJim Storey
Ken Phone #: ###-####
BLD-Ceiling Grid Inspection8/26/20158/27/20158/27/2015APASS
DetailsJim Storey
Ken Phone #: ###-####
BLD-Framing/Rough-in8/11/20158/11/20158/11/2015PPASS
DetailsJim Storey
Paula Phone #: ###-#### first layer ok
BLD-Wall cover8/6/20158/6/20158/6/2015PPASS
DetailsJim Storey
Ken Phone #: ###-#### south wall and interiors ok to cover
BLD-Ceiling Grid Inspection7/31/20157/31/20157/31/2015PPART
DetailsDave Hannah
Ken Phone #: ###-#### one hr ceiling grid has mains wired up at 2ft on center as per plans ok to start covering with sheet rock
Plan Reviewer's activity  7/17/2015 DONE
DetailsTim L. Woodard
(*NOTE*- Existing one hour horizontal assembly was found to be non-compliant in the field. A new detail and UL assembly were submitted for record. This assembly is a suspended one hour assembly UL L570.) 7-17-15 **TLW**
BLD-Framing/Rough-in6/23/20156/23/20156/23/2015PFAIL
DetailsJim Storey
Ken Phone #: ###-#### arch to contact planreview for floor/ceilling/design/opening protections
Issue PAID IN FULL permit  5/7/2015 DONE
Print Occupancy Form  5/5/2015 DONE
Permit Ready to Issue  5/5/2015 DONE
need rev cert of val
Telephone call  5/5/2015 DONE
called Jason- left message that permit is ready for pick up and need gc form and cert of value
Plan assigned to (TLW)4/9/2015 5/4/2015 PASS
DetailsTim L. Woodard
Routing - FIRE4/22/2015 5/4/2015 PASS
DetailsScott Arellano
Attached comments to plans.
1st review completed  5/4/2015 FAIL
Failed Plan Check.
Routing - PLAN CHECK5/4/2015 5/4/2015 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  5/4/2015 DONE
Case Summary (BLD)  5/4/2015 DONE
Plan resubmittals received  4/30/2015 DONE
resubmittals received 2 sets of each sheet-A1.0,E2.0, M1.0, 'M2.0, M3.0-2 response letter-2 assembl's-took to Tim W
Routing - PUBLIC WORKS4/10/2015 4/22/2015 PASS
DetailsTim L. Woodard
Approved on Routing slip by JKB. TLW
Routing - PLAN CHECK4/14/2015 4/22/2015 FAIL
DetailsTim L. Woodard
Refer to attached plan review report. TLW
Routing PW Sewer Rating4/13/2015 4/14/2015 PASS
DetailsJennifer Bruner
Routing PW Environmental4/10/2015 4/13/2015 PASS
DetailsRick Christenson
Routing - Addressing4/10/2015 4/10/2015 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  4/9/2015 DONE
Intake Approval  4/9/2015 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  4/8/2015 DONE
Application received 3/24/2015