Permit Information
Permit NumberBLD15-00867
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 1673 S RIDGE POINT PL
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan Modification to finish the 1,150 sq. ft. basement which includes a storage room, a bedroom, a restroom and a living space. JG** (Modification to grading plan sheet, JG) WUI Zone A, Class A Roof, Permit for the construction of a new 3446 sq. ft., two story (first story 2284 sq. ft., with an finished basement 1150 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 477 sq. ft. of covered patio’s/porches and 938 sq. ft. attached garage per the approved plans, plan review report and any notations, unfinished basement to have rough plumbing only in preparation for future restroom that will need to be permitted. C-1D/DA zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval8/22/20168/22/20168/22/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final12/22/201512/22/201512/22/2015PPASS
DetailsPhil Shearer
DOC - Permit Finaled12/22/201512/22/201512/22/2015PPASS
DetailsPhil Shearer
OVERRIDE  12/22/2015  
Plan Reviewer's activity  12/22/2015 DONE
DetailsJavier Guzman
Plan modification to finish 1,150 sq. ft. Basement per Brian w/Doug Lasher Construction
Case Summary (BLD)  12/22/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/22/2015 DONE
Permit Ready to Issue  12/22/2015 DONE
all requirments met
BLD-Final12/21/201512/21/201512/21/2015PNR
DetailsPhil Shearer
Brian Phone #: ###-####
PubWorks Occupancy Approval12/21/201512/21/201512/21/2015 DONE
DetailsJason C. Taylor

A bond for the sites final grading, driveway, and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
CHANGE STATUS TO (ISS)  12/21/2015 DONE
BLD-Final12/18/201512/18/201512/18/2015PPEND
DetailsTony Young
Brian Phone #: ###-####,, need trades,, walk through only,, need hillside sign off in history
CHANGE STATUS TO (ISS)  11/17/2015 DONE
modification fees paid
OVERRIDE  11/12/2015  
Plan assigned to (JG)11/3/201511/3/201511/12/2015 PASS
DetailsJavier Guzman
modification of grading and drainage
Routing - PLAN CHECK11/3/2015 11/12/2015 PASS
DetailsJavier Guzman
Inspection Record Card- Bld  11/12/2015 DONE
Telephone call  11/12/2015 DONE
called GC- left message that permit is ready for pick up and fees due
Case Summary (BLD)  11/12/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/12/2015 DONE
Permit Ready to Issue  11/12/2015 DONE
DO NOT ISSUE PLAN MOD
Routing PW Grading-Hillside11/9/2015 11/10/2015 PASS
DetailsJason C. Taylor
Modification to grading approved. JCT
Plan resubmittals received  11/6/2015 DONE
One copie of C1 Lot Grading and Drainage Plan. Taken to Javier
Routing PW Grading-Hillside11/3/2015 11/5/2015 FAIL
DetailsJason C. Taylor
Need 1 more copy dropped off for review. Jason Taylor.
Plan Modification Accepted  11/3/2015 DONE
received (2) sets of Grading & Drainage plan (C1)
Plan Modification Accepted  10/8/2015 DONE
new manual j
Routing - MECHANICAL10/8/2015 10/8/2015 PASS
DetailsTroy James
resubmitted manual j report
BLD-Energy code compliance6/30/20156/30/20156/30/2015PPASS
DetailsPhil Shearer
Brian Phone #: ###-####
BLD-Wall cover6/26/20156/29/20156/29/2015PPASS
DetailsPhil Shearer
Brian Phone #: ###-#### Exterior only
BLD-Wall Bracing6/29/20156/29/20156/29/2015PPASS
DetailsPhil Shearer
Brian Phone #: ###-####
BLD-Framing/Rough-in6/26/20156/29/20156/29/2015PPASS
DetailsPhil Shearer
Brian Phone #: ###-####
CHANGE STATUS TO (ISS)  6/26/2015 DONE
OVERRIDE  6/18/2015  
Plan assigned to (JG)6/17/20156/17/20156/18/2015 PASS
DetailsJavier Guzman
Manual JDS plan Mod
Routing - PLAN CHECK6/17/2015 6/18/2015 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/18/2015 DONE
Permit Ready to Issue  6/18/2015 DONE
NEEDS to pick up Manual J- NO fees due per Javier- DO NOT RE-ISSUE- this was a Plan MOD
Telephone call  6/18/2015 DONE
called GC- left message Manual J is ready for pick up and no fees due
Routing - MECHANICAL6/17/2015 6/17/2015 PASS
DetailsTroy James
Plan resubmittals received  6/17/2015 DONE
received one copy of Manual J- gave to Javier
BLD-Foundation5/4/20155/5/20155/5/2015PPASS
DetailsPhil Shearer
Eric Phone #: ###-####
BLD-Footing4/23/20154/27/20154/27/2015APASS
DetailsJim Storey
eric Phone #: ###-####
Issue PAID IN FULL permit  4/22/2015 DONE
OVERRIDE  4/21/2015  
Plan assigned to (JG) 3/25/20154/21/2015 PASS
DetailsJavier Guzman
1st review completed, 4/(13) M L2 Hillside** Pending Mech
Inspection Record Card- Bld  4/21/2015 DONE
Telephone call  4/21/2015 DONE
called Doug to let know permit is ready and how much is owed-left message on his phone
Routing - PLAN CHECK4/17/2015 4/21/2015 PASS
DetailsJavier Guzman
Routing - MECHANICAL4/21/2015 4/21/2015 PASS
DetailsTroy James
Case Summary (BLD)  4/21/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  4/21/2015 DONE
Permit Ready to Issue  4/21/2015 DONE
All Requrements Met
PubWorks Subgrade Approval4/20/20154/20/20154/20/2015 DONE
DetailsJason C. Taylor
* Entire Residence & Garage Footings***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Plan resubmittals received  4/20/2015 DONE
Two copies of sheet A-104 and S-105
Routing - PLAN CHECK4/14/2015 4/17/2015 FAIL
DetailsJavier Guzman
did not resubmit all corrections needed
Plan resubmittals received  4/16/2015 DONE
Two copies of Sheet A-104, S-101, S-104 and S-105. Taken to JG
Routing PW Grading-Hillside4/14/2015 4/14/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS4/14/2015 4/14/2015 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK4/10/2015 4/13/2015 FAIL
DetailsJavier Guzman
emailed review report to applicant
1st review completed  4/13/2015 FAIL
DetailsJavier Guzman
Routing - FIRE4/1/20153/25/20154/10/2015 PASS
DetailsScott Arellano
Approved as shown.
Routing - Erosion and Sediment3/31/2015 4/1/2015 PASS
DetailsEvan Jenkins
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE)
WUI Zone A, Class A Roof, Permit for the construction of a new 3446 sq. ft., two story (first story 2284 sq. ft., with an unfinished basement 1162 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 252 sq. ft. of covered patio’s/porches and 938 sq. ft. attached garage
Plan resubmittals received  4/1/2015 DONE
rec'd sheet A103 --ALD
Routing - MECHANICAL3/30/2015 3/31/2015 FAIL
DetailsTroy James
emailed idaho hvac correction
Routing - PLANNING3/30/2015 3/30/2015 PASS
DetailsDavid Moser
OK as per CFH15-00005
Routing - PUBLIC WORKS3/27/2015 3/30/2015 FAIL
DetailsJennifer Bruner
See Hillside
Plan resubmittals received  3/30/2015 DONE
DetailsCandy A. Nichols
resubmittals received 3 sheets of C1-took to JG
Routing PW Sewer Rating3/30/2015 3/30/2015 PASS
DetailsJennifer Bruner
Routing PW Grading-Hillside  3/27/2015 FAIL
DetailsJason C. Taylor
Grading plans are wrong. Please submit the correct grading plans with the date of March 9, 2015. Jason Taylor ###-####.
Routing - Addressing3/25/2015 3/27/2015 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  3/25/2015 DONE
Intake Approval  3/25/2015 PASS
Recd Pcfee & Taken To Pln CK  3/25/2015 DONE
Intake Approval  3/24/2015 FAIL
2 Erosion Control Plans and Engineer stamp on foundation sheet
Application received 3/24/2015