Permanent Occupancy | | | 1/5/2016 | | DONE |
|
|
|
|
First Notice | 3/27/2015 | 3/27/2015 | 6/10/2015 | | DONE |
Dave Hannah
|
|
|
Mailed out 6-10-15
|
Plan Reviewer's activity | | | 4/14/2015 | | DONE |
Tim L. Woodard
|
|
|
Temporary Occupancy of the shop / rear storage area only for a duration not to exceed 30 days with the possibility of extensions under just cause. To be clear this allows occupancy of the “Art Car / Storage” area located at the South half of the first floor if all conditions on the plans are met. This does not allow occupancy of the rest of the building.
|
FIRE-Final Inspection | 4/10/2015 | 4/10/2015 | 4/13/2015 | P | CANC |
Troy Cobbley
|
|
|
Kaden was actually wanting to know requrements for a temporary occupancy. I deferred him to Scott.
|
Reopen Permit (ISS) | | | 4/10/2015 | | DONE |
|
|
|
Fire Life Safety never FNL
|
BLD-Final | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | PASS |
Dave Hannah
|
|
|
Kaden// please call 15min prior Phone #: ###-####
|
DOC - Permit Finaled | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 3/26/2015 | 3/26/2015 | 3/26/2015 | P | FAIL |
Forrest France
|
|
|
Need to meet provisions indicated by plan review red-line annotations and per general requirements list. Not ready for final at this time, no work has been completed. Discussion with applicant on site regarding conditions necessary for occupancy approval.
|
Print Occupancy Form | | | 3/26/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/26/2015 | | DONE |
|
|
|
All Requirements Met
|
Telephone call | | | 3/26/2015 | | DONE |
|
|
|
Left message for Kaden
|
Issue PAID IN FULL permit | | | 3/26/2015 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/25/2015 | | DONE |
|
|
|
|
Intake Approval | | | 3/25/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/25/2015 | | DONE |
|
|
|
no fees paid
|
Plan assigned to (TLW) | 3/25/2015 | | 3/25/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/25/2015 | | 3/25/2015 | | PASS |
Tim L. Woodard
|
|
|
Approved with multiple redlines and any required maintence to the existing building. TLW
|
1st review completed | | | 3/25/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/25/2015 | | DONE |
|
|
|
|
Application received | | 3/25/2015 | | | |
|
|
|
|