Permit Information
Permit NumberBLD15-00888
StatusFinaled
Name ESI
Site Address 12336 W OVERLAND RD
Project NameDamsel in Defense Racking
Customer Number 
ePlanReviewYes
Description
(DAMSEL IN DEFENSE **RACKING**) Rack storage associated with the Damsel In Defense TI, BLD15-00353. Permit to add ten foot tall storage racking in an existing warehouse. Work to include: installation of prefabricated 10 foot tall storage racking including seismic bolting to existing slab. Approval of this permit is contingent on adhering to approved plans and engineering. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. (Special inspections on the anchor bolts are required per ICC/ESR - 1917)**AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/17/20158/19/2015 DONE
This permit finaled on the web by Penny Dennis
Third Notice 7/14/20158/12/2015 DONE
Second Notice 6/20/20157/9/2015 DONE
Mailed 7-10-15
First Notice6/3/20156/3/20156/10/2015 DONE
DetailsDave Hannah
Mailed out 6-10-15
BLD-Final6/2/20156/2/20156/3/2015PPASS
DetailsDave Hannah
Racking // Curtis Phone #: ###-####
DOC - Permit Finaled6/3/20156/3/20156/3/2015PPASS
DetailsDave Hannah
(F) Reprint permit  5/21/2015 DONE
Routing - FIRE5/20/20155/20/20155/20/2015 PASS
DetailsScott Arellano
Plans evaluated. No comments attached. HPS less than 2500 square feet. Building fully fire sprinklered
Plan assigned to (AJS)5/14/20155/14/20155/20/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Level 2 TI - ePlanReview - Racking
Routing - PLAN CHECK5/20/2015 5/20/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/20/2015 DONE
DetailsAdele J Schaffeld-Griffin
Permit Ready to Issue  5/20/2015 DONE
all requirments met
Issue PAID IN FULL permit  5/20/2015 DONE
Inspection Record Card- Bld  5/20/2015 DONE
Routing - PLAN CHECK5/14/2015 5/18/2015 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  5/18/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Intake Approval  5/14/2015 PASS
DetailsJason Blais
Prescreen approved by Tim Frost and plan review fees paid.
Pending Assignment by JCB5/14/2015 5/14/2015 DONE
DetailsJason Blais
Plan Reviewer's activity  4/27/2015 DONE
Sent the following email. (See projectdoX for more information.

Hi Penny,

I receieved your resubmittal. However, it appears you are missing a few items. The items are annotated on form 516 and are listed below.

I believe Shilo Automatic Sprinkler, Inc. is working on this project with you. I need them to either submit a sprinkler evaluation letter or submit sprinkler drawings (under separate permit).

Drawing G-001 is required to be revised as shown in the annotations.

ICC-ES Evaluation Report.

See drawing A-131 Rev 3 for annotoations

Please, feel free to contact me with questions.

Tim Frost, S.E.T.
Routing - FIRE3/31/20153/31/20153/31/2015 FAIL
DetailsTim Frost
I sent the following email to the applicant. Most of the infomation is in the annotations within the forms and drawings.

There were several omissions in the document provided. Therefore, the submittal was denied. Please, see the annotated drawings and forms for complete information.

Please, feel free to contact me with any questions.

Cordially,

Tim Frost, S.E.T.
Fire Sprinkler Plans Examiner
Fire Code Plans Examiner
Fire Inspector

City of Boise
tfrost@cityofboise.org
###-####
Application received  3/25/2015 DONE
Application submitted via PDS Online on Mar 25 2015 4:27PM