Second Notice | | 11/25/2016 | 12/14/2016 | | DONE |
|
|
|
Mailed 12-16
|
First Notice | | 11/13/2016 | 11/15/2016 | | DONE |
|
|
|
Mailed 11-16-16
|
PubWorks Occupancy Approval | 11/3/2016 | 11/3/2016 | 11/3/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 11/3/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/3/2016 | | DONE |
|
|
|
|
BLD-Final | 10/31/2016 | 10/31/2016 | 11/2/2016 | P | PASS |
Jim Sly
|
|
|
Jake Phone #: ###-#### OK for Perm Occ. (sorry....he didn't have card)
|
FIRE-Final Inspection | 11/2/2016 | 11/3/2016 | 11/2/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | FAIL |
Troy Cobbley
|
|
|
Still need the emergency light on the second floor northwest corner repaired. All other items have been corrected.
|
FIRE-Final Inspection | 10/31/2016 | 11/1/2016 | 11/1/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide correct building address for the fire alarm monitoring, repair three emergency lights, install the missing exit sign, provide fire dept access signage. Per contractor the shown gate/fencing will not be installed.
|
Zoning Approval | 10/27/2016 | 10/27/2016 | 10/27/2016 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Ceiling Grid Inspection | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Jim Sly
|
|
|
Keagan Phone #: ###-####
|
FIRE-Conference | 9/15/2016 | 9/15/2016 | 9/15/2016 | A | DONE |
Katie Marron
|
|
|
Phone call with Jake on where Knox box should be installed (entrance or riser room). Advised it should be installed by where the fire alarm panel will be which is he said is the main entrance.
|
BLD-Framing/Rough-in | 8/31/2016 | 9/1/2016 | 9/2/2016 | P | PASS |
Jim Sly
|
|
|
Jake Phone #: ###-####
|
FIRE-Conference | 9/2/2016 | 9/2/2016 | 9/2/2016 | P | DONE |
Troy Cobbley
|
|
|
Jake Phone #: ###-####
|
BLD-Energy code compliance | 8/18/2016 | 8/18/2016 | 8/19/2016 | P | PART |
Jim Sly
|
|
|
Jake Phone #: ###-#### West wall 2nd floor OK.
|
BLD-Energy code compliance | 8/10/2016 | 8/11/2016 | 8/11/2016 | A | PART |
Jim Sly
|
|
|
Insulation // Jake Phone #: ###-#### South Wall 2nd floor...OK.
|
BLD-Energy code compliance | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | PART |
Jim Sly
|
|
|
Jake Phone #: ###-#### Select walls ....OK
|
BLD-Energy code compliance | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | PART |
Jim Sly
|
|
|
Jake Phone #: ###-#### West wall 1st floor.......OK
|
BLD-Energy code compliance | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | NR |
Jim Sly
|
|
|
Please call ahead for access - Jake Phone #: ###-####
|
BLD-Other | 6/17/2016 | 6/20/2016 | 6/20/2016 | P | PART |
Jim Storey
|
|
|
Jake-steel deck-concrete Phone #: ###-####wip
|
BLD-Conference | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | DONE |
Jim Sly
|
|
|
Jake Phone #: ###-####
|
BLD-Footing | 3/22/2016 | 3/23/2016 | 3/23/2016 | A | PART |
Jim Sly
|
|
|
Late morning // Jake Phone #: ###-#### Special insp Required .......Footing pads at East and West walls of Bldg.......and just S. of Elevator. Elevator footing. OK pending MTI special inspections, tests and approvals.
|
Issue PAID IN FULL permit | | | 3/18/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/11/2016 | | |
|
|
|
|
Routing - PLAN CHECK | 2/25/2016 | | 3/11/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 2/25/2016 | | 3/11/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/11/2016 | | DONE |
|
|
|
**ALL MET*** Need GC Form & Revised Certificate of value from GC
|
Plan assigned to (TLW) | 4/27/2015 | | 3/11/2016 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete
|
Routing - FIRE | 2/29/2016 | 2/29/2016 | 3/2/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - PLANNING Land Div | 2/25/2016 | | 3/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 2/25/2016 | | 2/26/2016 | | PASS |
Laura Hunter
|
|
|
|
Plan resubmittals received | | | 2/25/2016 | | DONE |
|
|
|
|
Extend Review Timeline | | | 1/7/2016 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 12/18/2015 | | DONE |
|
|
|
Sent email about pending expiration if no engagement is recieved. TLW
|
Routing PW Drainage | 9/16/2015 | | 12/18/2015 | | PASS |
Brian Murphy
|
|
|
Passed in E-Plan. TLW
|
Routing - Addressing | 10/16/2015 | | 10/16/2015 | | PASS |
Emily Dixon
|
|
|
Address shall be 1017 N Orchard St
|
Routing - PLANNING Land Div | 10/15/2015 | | 10/15/2015 | | PASS |
Dave Abo
|
|
|
Parcel A on ROS #10270.
|
Routing - PLANNING | 10/8/2015 | | 10/8/2015 | | PASS |
Susan Riggs
|
|
|
|
Routing - PLAN CHECK | 9/16/2015 | | 10/1/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 9/16/2015 | 9/16/2015 | 9/25/2015 | | FAIL |
Scott Arellano
|
|
|
Revised comments attached to case and emailed to architect.
|
Routing Off Site - STRUCTURAL | 9/16/2015 | | 9/25/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Street Lights | 9/16/2015 | | 9/25/2015 | | PASS |
Rob Bousfield
|
|
|
|
Routing - Design Review | 9/16/2015 | | 9/23/2015 | | PASS |
Andrea Tuning
|
|
|
Passed on 9-23-16 in E-Plan with Bicycle parking revisions. TLW
|
Routing - Addressing | 9/16/2015 | | 9/17/2015 | | FAIL |
|
|
|
Parcel consolidation necessary. Also building will need unique address.
|
Routing - PLUMBING | 9/16/2015 | | 9/17/2015 | | PASS |
Daryl Spivey
|
|
|
dcva required on water service upstream of any branch or fixture
|
Routing - PLANNING Land Div | 9/16/2015 | | 9/16/2015 | | FAIL |
Dave Abo
|
|
|
Must complete Record of Survey (ROS15-00052) Mylar has been signed and Notice of Buildable Parcel but no documentation that documents have been recorded. Provide copies of recorded documents prior to issuance of building permit. 9-16-15
|
Routing - PLANNING | 9/16/2015 | | 9/16/2015 | | FAIL |
Susan Riggs
|
|
|
Waiting for the Noitice of Buildable Parcels and the mylar recorded. They have been approved, just not recorded.
|
Routing - Erosion and Sediment | 9/16/2015 | | 9/16/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(U-HAUL CLIMATE CONTROL STORAGE BUILDING) Permit to construct a new 37,616 square foot two story climate controlled storage building and related site improvements.
|
Plan resubmittals received | | | 9/16/2015 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 9/15/2015 | | 9/15/2015 | | FAIL |
Dave Abo
|
|
|
Must combine parcels before issuance of building permit.
|
Routing PW Drainage | 9/15/2015 | | 9/15/2015 | | FAIL |
|
|
|
|
Routing - PLUMBING | 9/15/2015 | | 9/15/2015 | | FAIL |
Bill VanDegrift
|
|
|
Christina said to fail this in E-Plan because the system failed
|
Routing - Erosion and Sediment | 6/23/2015 | | 6/23/2015 | | PASS |
Evan Jenkins
|
|
|
Permit was issued prior to ESC Reviewing/Approving the ESC Plan and Site Maps. Evan Reviewed them onsite during the Site Prep Inspection.
(U-HAUL CLIMATE CONTROL STORAGE BUILDING) Permit to construct a new 37,616 square foot two story climate controlled storage building and related site improvements. Approval contingent upon adhering to the approved plans on file, Planning Approvals and engineering. Work to include: construction of new foundation, new accessible parking, new accessible route, [construction of a tilt up concrete first floor, steel pan deck, and metal building second floor and roof structure], new electrical, new mechanical, new plumbing, and interior finishes
|
Route to Impact Fee Review | 5/18/2015 | 5/21/2015 | 5/19/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Solid Waste | 4/28/2015 | | 5/18/2015 | | PASS |
Megan Durrell
|
|
|
Approved in E-Plan Review. TLW
|
1st review completed | | | 5/18/2015 | | DONE |
|
|
|
|
Routing - PLANNING | 4/27/2015 | | 5/18/2015 | | FAIL |
Susan Riggs
|
|
|
Failed in E-Plan Reviewl. CUP14-00065
|
Routing - PLANNING Land Div | 4/27/2015 | | 5/18/2015 | | FAIL |
Tim L. Woodard
|
|
|
Failed in E-Plan. TLW
|
Routing PW Drainage | 4/28/2015 | | 5/18/2015 | | FAIL |
Brian Murphy
|
|
|
c-33 sand pavers o and m isc
Failed in E-Plan Review. TLW
|
Routing PW Street Lights | 4/28/2015 | | 5/18/2015 | | FAIL |
Mike D Hedge
|
|
|
Failed in E-Plan Review. TLW
|
Routing - PLAN CHECK | 4/27/2015 | | 5/14/2015 | | FAIL |
Tim L. Woodard
|
|
|
Refer to change marks attached to drawings. TLW
|
Routing Off Site - STRUCTURAL | 4/27/2015 | | 5/14/2015 | | FAIL |
Tim L. Woodard
|
|
|
Corrections attached in E-Plan Review. TLW
|
Routing - FIRE | 4/27/2015 | 4/27/2015 | 5/11/2015 | | FAIL |
Scott Arellano
|
|
|
Emailed report to architect and attached report to case.
|
Routing PW Sewer Design | 4/28/2015 | | 5/1/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Design Review | 4/27/2015 | | 4/30/2015 | | FAIL |
Sarah Schafer
|
|
|
The site plan, landscape plan and elevation do not match what was approved as parrt of DRH14-00379. The site plan does nto show all improvements including biycle parking and the site and landsacpe plans do not match.
|
Routing - PLUMBING | 4/27/2015 | | 4/29/2015 | | FAIL |
Bill VanDegrift
|
|
|
1) provide civil plans showing sewer and water size and locations
2) provide a dcva on water service upstream of any branch lines
|
Routing PW Sewer Rating | 4/28/2015 | | 4/28/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 4/27/2015 | | 4/28/2015 | | FAIL |
|
|
|
Parcel consolidation necessary. Also building will need new unique address.
|
Routing - PUBLIC WORKS | 4/27/2015 | | 4/28/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 4/27/2015 | | 4/28/2015 | | FAIL |
Evan Jenkins
|
|
|
ESC Site Map Required For Approval.
|
Intake Approval | | | 4/23/2015 | | PASS |
Sam Zahorka
|
|
|
|
Intake Approval | | | 4/1/2015 | | FAIL |
Sam Zahorka
|
|
|
|
Plan Reviewer's activity | | | 4/1/2015 | | DONE |
Sam Zahorka
|
|
|
Please provide the following information:
1. Please see the items circled in red on the submittal checklist.
2. Please see the File naming Standards and rename sheets. http://pds.cityofboise.org/media/105041/electronicstandards.pdf
3. Please have the engineer provide his stamp and signature on Application #310 - Statement for Special Inspections.
4. Please separate all of the drawings sheets and upload them idividually rather than together.
5. Please provide a 4"X4" blank space located 3" off the lower right hand corner for the City approval stamp on the Cover Sheet.
6. Please provide a 4"X2" blank space located 3" off the lower right hand corner for the City approval stamp on the drawing Sheets.
7. Please provide the structual calculations.
8. Please provide the Verification of legal lot form signed by Subdivision staff. (###-#### or ###-####)
Please separate this form from the checklist and upload as its own document.
9. Please provide the ESC Narrative
10. Planning & Zoning Letter(s) of approval. (DRH)
11. Please provide a 2012 IECC Energy Code enevelope COMcheck.
12. Please provide the Landscape plan and plan schedules
13. Please provide a 2012 Mechancial COMcheck.
If assistance is needed please call me directly at ###-####
|
Application received | | | 3/25/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 25 2015 5:04PM
|