BLD-Final | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Mike Jordan
|
|
|
Darren Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. The exit sign at the main exit failed during the re-inspection. Owner to repair prior to building inspection.
|
BLD-Final | 4/29/2015 | 5/1/2015 | 5/1/2015 | A | CANC |
Mike Jordan
|
|
|
Darren-###-####-please call 20 min prior to meet. Moved to pm.
|
FIRE-Final Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | FAIL |
Troy Cobbley
|
|
|
Repair the exit signs in the south exit area and provide the tamper switch for the gate valve or fire dept approval for the existing condition.
NOTE: Gate valve is allowed to be chained and locked per 1994 UFC.*SJA*
|
Permanent Occupancy | | | 5/1/2015 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2015 | | DONE |
Scott Arellano
|
|
|
Spoke with Darren. Informed Darren that the fire sprinkler gate valve can remain as is with chain and lock per 1994 UFC code. However, exit signs must be repaired and functioning prior to final sign off.
|
BLD-Final | 4/13/2015 | 4/14/2015 | 4/14/2015 | P | NR |
Mike Jordan
|
|
|
Raymond Phone #: ###-####. Fire/life/safety inspection failed.
|
FIRE-Final Inspection | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | FAIL |
Troy Cobbley
|
|
|
Repair exit signs and emergency lights, provide annual inspection for the fire extinguishers, provide annual inspection for the fire sprinkler system, provide functional fire sprinkler monitoring system, provide electronic supervision of the tamper switches or approval from the fire dept for an existing condition.
|
Issue PAID IN FULL permit | | | 4/6/2015 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 3/26/2015 | 3/26/2015 | 3/27/2015 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/26/2015 | | 3/27/2015 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 3/27/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/27/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/27/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/27/2015 | | DONE |
|
|
|
|
Telephone call | | | 3/27/2015 | | DONE |
|
|
|
Called Raymond- left message permit is ready for pick up
|
Plans ACCEPTED BY PLAN TECH | | | 3/26/2015 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/26/2015 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 5/11/2015 | | | |
|
|
|
|
Application received | | 3/26/2015 | | | |
|
|
|
|