Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberBLD15-00907
StatusFinaled
Name JSE ENTERPRISES LLC
Site Address 6903 W TARGEE ST
Project NameSun Valley Express Facility
Customer Number 
ePlanReviewYes
Description
(SUN VALLEY EXPRESS FACILITY)Permit for a new 5,916 sq.ft. bus maintenance building and associated site work. A 3 hour fire barrier will be constructed to create a 4,925 sq ft commercial bus repair/maintenance and wash bay separate from the remainder of the building. Limiting the square footage to under 5,000 per IBC 903.2.9.1 #4 exempts the requirements for fire sprinklers in commercial auto repair area. This building is not fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/14/20172/13/2017 DONE
sent in mail 2-14-17 pdf
BLD-Final1/3/20171/4/20171/4/2017APASS
DetailsPhil Shearer
To close out - BND15-00121 completed 7/5/16 Phone #: ###-####
Permanent Occupancy  1/4/2017 DONE
BLD-Final1/3/20171/3/20171/3/2017PCANC
DetailsPhil Shearer
Zoning Approval6/27/20166/27/20166/27/2016 PASS
DetailsJosh Wilson
BLD-Aging Inspection4/15/20164/15/20164/15/2016 PEND
DetailsPhil Shearer
BLD-Aging Inspection4/14/20164/14/20164/15/2016 PEND
DetailsPhil Shearer
PubWorks Occupancy Approval2/29/20162/29/20162/29/2016 DONE
DetailsTiffany Lowery
BLD-Final12/1/201512/1/201512/2/2015PPART
DetailsPhil Shearer
Jeff Phone #: ###-#### OK for temp
Zoning Approval Temp12/2/201512/2/201512/2/2015 PASS
DetailsJosh Wilson
Landscape bond is in place. 180-day temp occ ok.
BLD-Final11/25/201511/27/201511/27/2015ANR
DetailsPhil Shearer
JC Phone #: ###-####
FIRE-Final Inspection11/25/201511/25/201511/25/2015PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Energy code compliance11/2/201511/2/201511/2/2015PPASS
DetailsPhil Shearer
Jeff Phone #: ###-####
BLD-Energy code compliance10/29/201510/29/201510/29/2015PPART
DetailsPhil Shearer
Insulation // Jeff Phone #: ###-####. Air seal OK
BLD-Framing/Rough-in10/29/201510/29/201510/29/2015PPASS
DetailsPhil Shearer
Insulation // Jeff Phone #: ###-####
BLD-Wall Bracing10/5/201510/6/201510/6/2015APASS
DetailsPhil Shearer
Shear // Jafe Phone #: ###-####
BLD-Other9/24/20159/24/20159/24/2015PPART
DetailsJim Storey
FIre barrier wall - Jeff Phone #: ###-#### screw sch ok inside room north.
BLD-Foundation8/6/20158/7/20158/7/2015APASS
DetailsPhil Shearer
retaining wall; Jed Phone #: ###-####
BLD-Footing8/4/20158/4/20158/4/2015PPASS
DetailsPhil Shearer
interior; Jeff Phone #: ###-####
BLD-Concrete7/9/20157/9/20157/9/2015PPASS
DetailsPhil Shearer
Jeff Phone #: ###-####
BLD-Footing7/7/20157/8/20157/8/2015PPASS
DetailsJim Sly
Jay Phone #: ###-####
(F) Reprint permit  7/7/2015 DONE
Inspection Record Card- Bld  6/26/2015 DONE
Print Occupancy Form  6/26/2015 DONE
Issue PAID IN FULL permit  6/26/2015 DONE
(F) Reprint permit  6/26/2015 DONE
(F) Reprint permit  6/26/2015 DONE
OVERRIDE  6/18/2015  
Routing - MECHANICAL6/18/2015 6/18/2015 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  6/18/2015 DONE
Permit Ready to Issue  6/18/2015 DONE
Needs; Responsible Person, G.C. Form, Revised Certificate of Value ALL REQUIRMENTS MET 6-24-15 ///CEV
Plan assigned to (AJS)5/6/2015 6/18/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed New structure
Routing - MECHANICAL6/12/2015 6/12/2015 FAIL
DetailsTroy James
talked to mechanical engineer
Routing - PLAN CHECK6/8/2015 6/10/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing Off Site - STRUCTURAL6/8/2015 6/10/2015 PASS
DetailsAdele J Schaffeld-Griffin
2nd review Stapley
Routing - MECHANICAL6/8/2015 6/9/2015 FAIL
DetailsTroy James
Routing - PLUMBING6/8/2015 6/8/2015 PASS
DetailsBill VanDegrift
project also includes two future sewer and water services to future lots.
1) interceptor vents may not tie together
2) R.P. required on equipment in wash bay
Route to Impact Fee Review6/2/20156/5/20156/3/2015 PASS
DetailsCindy M. Gould
1st review completed  6/2/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK5/6/2015 5/28/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Drainage5/7/2015 5/22/2015 PASS
DetailsBrian Murphy
Routing - FIRE5/6/2015 5/19/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Routing Off Site - STRUCTURAL5/6/2015 5/15/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Sewer Design5/7/2015 5/8/2015 PASS
DetailsKyle S. Rosenmeyer
Routing PW Sewer Rating5/7/2015 5/8/2015 PASS
DetailsJennifer Bruner
Routing PW Solid Waste5/7/2015 5/7/2015 PASS
DetailsMegan Durrell
Routing PW Environmental5/7/2015 5/7/2015 PASS
DetailsTerry Alber
Plans show appropriately-sized oil/sediment interceptor connected to wash bay and service trench.
Routing PW Street Lights5/7/2015 5/7/2015 PASS
DetailsMike D Hedge
No street lighting required.
Routing - Design Review5/6/2015 5/7/2015 PASS
DetailsJosh Wilson
Routing - PUBLIC WORKS5/6/2015 5/7/2015 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment5/6/2015 5/7/2015 PASS
DetailsEvan Jenkins
New 5,916 sf bus maintenance building on existing site
Routing - MECHANICAL5/6/2015 5/7/2015 FAIL
DetailsTroy James
Routing - PLUMBING5/6/2015 5/7/2015 PASS
DetailsDaryl Spivey
Flammable interceptor tank required to be vented.
Routing - PLANNING Land Div5/6/2015 5/7/2015 PASS
DetailsDave Abo
Parcel A of ROS 9995.
Routing - Addressing5/6/2015 5/6/2015 PASS
DetailsEmily Dixon
Intake Approval  5/6/2015 PASS
Pending Assignment by TLW5/6/2015 5/6/2015 DONE
DetailsTim L. Woodard
Application received  3/27/2015 DONE
Application submitted via PDS Online on Mar 27 2015 8:41AM