First Notice | | 1/14/2017 | 2/13/2017 | | DONE |
|
|
|
sent in mail 2-14-17 pdf
|
BLD-Final | 1/3/2017 | 1/4/2017 | 1/4/2017 | A | PASS |
Phil Shearer
|
|
|
To close out - BND15-00121 completed 7/5/16 Phone #: ###-####
|
Permanent Occupancy | | | 1/4/2017 | | DONE |
|
|
|
|
BLD-Final | 1/3/2017 | 1/3/2017 | 1/3/2017 | P | CANC |
Phil Shearer
|
|
|
|
Zoning Approval | 6/27/2016 | 6/27/2016 | 6/27/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Aging Inspection | 4/15/2016 | 4/15/2016 | 4/15/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 4/14/2016 | 4/14/2016 | 4/15/2016 | | PEND |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 2/29/2016 | 2/29/2016 | 2/29/2016 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 12/1/2015 | 12/1/2015 | 12/2/2015 | P | PART |
Phil Shearer
|
|
|
Jeff Phone #: ###-#### OK for temp
|
Zoning Approval Temp | 12/2/2015 | 12/2/2015 | 12/2/2015 | | PASS |
Josh Wilson
|
|
|
Landscape bond is in place. 180-day temp occ ok.
|
BLD-Final | 11/25/2015 | 11/27/2015 | 11/27/2015 | A | NR |
Phil Shearer
|
|
|
JC Phone #: ###-####
|
FIRE-Final Inspection | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Energy code compliance | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | PASS |
Phil Shearer
|
|
|
Jeff Phone #: ###-####
|
BLD-Energy code compliance | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PART |
Phil Shearer
|
|
|
Insulation // Jeff Phone #: ###-####. Air seal OK
|
BLD-Framing/Rough-in | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | PASS |
Phil Shearer
|
|
|
Insulation // Jeff Phone #: ###-####
|
BLD-Wall Bracing | 10/5/2015 | 10/6/2015 | 10/6/2015 | A | PASS |
Phil Shearer
|
|
|
Shear // Jafe Phone #: ###-####
|
BLD-Other | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PART |
Jim Storey
|
|
|
FIre barrier wall - Jeff Phone #: ###-#### screw sch ok inside room north.
|
BLD-Foundation | 8/6/2015 | 8/7/2015 | 8/7/2015 | A | PASS |
Phil Shearer
|
|
|
retaining wall; Jed Phone #: ###-####
|
BLD-Footing | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Phil Shearer
|
|
|
interior; Jeff Phone #: ###-####
|
BLD-Concrete | 7/9/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Phil Shearer
|
|
|
Jeff Phone #: ###-####
|
BLD-Footing | 7/7/2015 | 7/8/2015 | 7/8/2015 | P | PASS |
Jim Sly
|
|
|
Jay Phone #: ###-####
|
(F) Reprint permit | | | 7/7/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/26/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/26/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/26/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/26/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/26/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/18/2015 | | |
|
|
|
|
Routing - MECHANICAL | 6/18/2015 | | 6/18/2015 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/18/2015 | | DONE |
|
|
|
Needs; Responsible Person, G.C. Form, Revised Certificate of Value ALL REQUIRMENTS MET 6-24-15 ///CEV
|
Plan assigned to (AJS) | 5/6/2015 | | 6/18/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed New structure
|
Routing - MECHANICAL | 6/12/2015 | | 6/12/2015 | | FAIL |
Troy James
|
|
|
talked to mechanical engineer
|
Routing - PLAN CHECK | 6/8/2015 | | 6/10/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 6/8/2015 | | 6/10/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
2nd review Stapley
|
Routing - MECHANICAL | 6/8/2015 | | 6/9/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 6/8/2015 | | 6/8/2015 | | PASS |
Bill VanDegrift
|
|
|
project also includes two future sewer and water services to future lots.
1) interceptor vents may not tie together
2) R.P. required on equipment in wash bay
|
Route to Impact Fee Review | 6/2/2015 | 6/5/2015 | 6/3/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 6/2/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 5/6/2015 | | 5/28/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 5/7/2015 | | 5/22/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 5/6/2015 | | 5/19/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing Off Site - STRUCTURAL | 5/6/2015 | | 5/15/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Design | 5/7/2015 | | 5/8/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Rating | 5/7/2015 | | 5/8/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Solid Waste | 5/7/2015 | | 5/7/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Environmental | 5/7/2015 | | 5/7/2015 | | PASS |
Terry Alber
|
|
|
Plans show appropriately-sized oil/sediment interceptor connected to wash bay and service trench.
|
Routing PW Street Lights | 5/7/2015 | | 5/7/2015 | | PASS |
Mike D Hedge
|
|
|
No street lighting required.
|
Routing - Design Review | 5/6/2015 | | 5/7/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS | 5/6/2015 | | 5/7/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 5/6/2015 | | 5/7/2015 | | PASS |
Evan Jenkins
|
|
|
New 5,916 sf bus maintenance building on existing site
|
Routing - MECHANICAL | 5/6/2015 | | 5/7/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 5/6/2015 | | 5/7/2015 | | PASS |
Daryl Spivey
|
|
|
Flammable interceptor tank required to be vented.
|
Routing - PLANNING Land Div | 5/6/2015 | | 5/7/2015 | | PASS |
Dave Abo
|
|
|
Parcel A of ROS 9995.
|
Routing - Addressing | 5/6/2015 | | 5/6/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 5/6/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 5/6/2015 | | 5/6/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 3/27/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 27 2015 8:41AM
|