Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-00921
StatusFinaled
Name ILLINGWORTH JOE
Site Address 532 S FRANKLIN PARK DR
Project Name532 S Franklin Park Dr.
Customer Number 
ePlanReviewNo
Description
This project is for an extensive remodel and the addition of 1162s.f. to the rear of an existing 1000 s.f. single family dwelling. As the project will include complete new truss system the entire interior of the dwelling will be re-configured creating an open kitchen and family room area; master suite, 3-bedrooms 2-bathrooms and new laundry area. R-1C setbacks are ok per Leon Letson. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked, energy prescriptive method, Manual J report and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/20/20161/21/20161/21/2016APASS
DetailsMike Jordan
Joe// please call before Phone #: ###-####
DOC - Permit Finaled1/21/20161/21/20161/21/2016PPASS
DetailsMike Jordan
BLD-Energy code compliance6/23/20156/23/20156/23/2015PPASS
DetailsPhil Shearer
Joe Phone #: ###-####
BLD-Framing/Rough-in6/17/20156/18/20156/18/2015APASS
DetailsPhil Shearer
Joe Phone #: ###-####
BLD-Framing/Rough-in6/15/20156/16/20156/16/2015AFAIL
DetailsPhil Shearer
Joe Phone #: ###-####. Truss bracing on A3 trusses and nail to hangers on gerder. Missing air seal. CN posted.
BLD-Wall Bracing6/8/20156/8/20156/8/2015PPASS
DetailsPhil Shearer
Joe Phone #: ###-####
Plan Modification Accepted  6/8/2015 DONE
new manual j
Routing - MECHANICAL6/8/2015 6/8/2015 PASS
DetailsTroy James
resubmitted manual j
Routing Walk-In (BLD)4/13/20154/13/20154/13/2015PPASS
DetailsPerry Paine
questions on the hinge effect on the front wall, lap sheathing and drywall over is best.
BLD-Footing4/3/20154/6/20154/6/2015PPASS
DetailsPhil Shearer
Jared Phone #: ###-####
Issue PAID IN FULL permit  4/2/2015 DONE
Inspection Record Card- Bld  4/2/2015 DONE
OVERRIDE  4/1/2015  
Telephone call  4/1/2015 DONE
called Joe to let know permit is ready and how much is owed
Permit Ready to Issue  4/1/2015 DONE
requirements met. Homeowner is GC
Routing Walk-In (BLD)3/27/20153/27/20153/31/2015PDONE
DetailsPerry Paine
Routing - MECHANICAL3/27/2015 3/31/2015 PASS
DetailsTroy James
To Troy Manual J to arrive by e-mail Monday 3-30-2015
Routing - PLAN CHECK3/31/2015 3/31/2015 PASS
DetailsPerry Paine
Inspection Record Card- Bld  3/31/2015  
1st review completed  3/31/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/31/2015 DONE
Routing Walk-In (Zoning)3/27/20153/27/20153/27/2015PDONE
DetailsLeon Letson
Application received 3/27/2015