BLD-Final | 8/8/2016 | 8/8/2016 | 8/8/2016 | A | PASS |
Mike Jordan
|
|
|
Please give notice so I can meet you there. Thanks Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
|
DOC - Permit Finaled | 8/8/2016 | 8/8/2016 | 8/8/2016 | P | PASS |
Mike Jordan
|
|
|
|
Meeting | | | 7/26/2016 | | DONE |
|
|
|
as per JG -we can remove the tag since Jim Wylie has received the flood plain cert
|
BLD-Energy code compliance | 3/11/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
Override - Parcel Holds | 3/11/2016 | 1/1/1900 | 3/11/2016 | | |
|
|
|
as per Jim Wylie, all forms turned in
|
BLD-Framing/Rough-in | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | PASS |
Mike Jordan
|
|
|
would like call ahead; scott Phone #: ###-####
|
Override - Parcel Holds | 3/7/2016 | 1/1/1900 | 3/7/2016 | | |
|
|
|
floodplain info has been turned in as per Jim Wylie
|
BLD-Framing/Rough-in | 2/26/2016 | 2/29/2016 | 2/29/2016 | A | FAIL |
Mike Jordan
|
|
|
Scott Phone #: ###-####. HAngars require full depth blocking and need to be double on A5 trusses, do not reuse these hanhars (overdriven). Nail off 2ply B3 girder as per the engineering. Complete lateral bracing on A4,A5 B1,B2 and B3 trusses. Appears that interior bearing on A5 trusses is off. Top chord wood penetration at 2hr. fire wall? A correction notice was issued.
|
BLD-Framing/Rough-in | 2/23/2016 | 2/24/2016 | 2/24/2016 | P | FAIL |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Provide truss engineering. 2hr. fire wall to continue to under side of roof deck. Provide truss hanhars for truss to girder truss connections. Nail off 2ply girder trusses.
|
Override - Parcel Holds | 2/23/2016 | 1/1/1900 | 2/23/2016 | | |
|
|
|
floodplain info turned in
|
BLD-Wall Bracing | 1/6/2016 | 1/7/2016 | 1/7/2016 | A | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
Override - Parcel Holds | 1/6/2016 | 1/1/1900 | 1/6/2016 | | |
|
|
|
flooplain information turned in as per Jim Wylie 7-6-15
|
Elevation Cert Rec'd-Final | | | 7/6/2015 | | DONE |
|
|
|
Received Final Elevation Certificate based upon "finished Construction". Jim W. / ###-####
|
BLD-Foundation | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
BLD-Footing | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | PASS |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/27/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 5/20/2015 | | |
|
|
|
|
Plan assigned to (JG) | | 3/27/2015 | 5/20/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 4/14 T L2* Townhouse
|
Routing - PLAN CHECK | 5/18/2015 | | 5/20/2015 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 5/20/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/20/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/20/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 5/20/2015 | | DONE |
|
|
|
All requirements met
|
Inspection Record Card- Bld | | | 5/20/2015 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 5/18/2015 | | 5/19/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Flood Plain | 5/18/2015 | | 5/19/2015 | | PASS |
Jim Wyllie
|
|
|
Two mor Elevation Certificates are required; One prior to recceiving a framing inspection and one based upon finished construction prior to receiving building occupancy. ( Jim Wyllie / ###-####)
|
Plan resubmittals received | | | 5/14/2015 | | DONE |
|
|
|
resubmittal received 2 each sheet A-1, A-3, A-3a-2 struc calcs & elevation cert-took to JG
|
1st review completed | | | 4/14/2015 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 4/1/2015 | | 4/14/2015 | | FAIL |
Javier Guzman
|
|
|
emailed review report to applicant
|
Routing - PLANNING | 3/31/2015 | | 4/14/2015 | | PASS |
Sue Cummings
|
|
|
signed of in planning review report by Sue Cummings 3/31/2015
|
Routing - MECHANICAL | | | 4/1/2015 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 3/30/2015 | | 3/31/2015 | | FAIL |
Jennifer Bruner
|
|
|
See Flood Plain
|
Routing PW Flood Plain | 3/30/2015 | | 3/31/2015 | | FAIL |
Jim Wyllie
|
|
|
Elevation Certificate not provided. (Jim Wyllie / ###-####)
|
Routing PW Sewer Rating | 3/30/2015 | | 3/30/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 3/27/2015 | | 3/30/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/27/2015 | | DONE |
|
|
|
|
Intake Approval | | | 3/27/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2015 | | DONE |
|
|
|
|
Application received | | 3/27/2015 | | | |
|
|
|
|