(F) Reprint permit | | | 9/1/2015 | | DONE |
|
|
|
|
BLD-Final | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
DOC - Permit Finaled | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 4/14/2015 | 4/15/2015 | 4/16/2015 | P | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to insulate after elec r/i need truss calcs on old trusses ? on bearing
|
BLD-Foundation | 4/2/2015 | 4/6/2015 | 4/6/2015 | A | PASS |
Dave Hannah
|
|
|
Wall // Greg Phone #: ###-####
|
BLD-Footing | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
Routing Walk-In (Zoning) | 3/31/2015 | 3/31/2015 | 3/31/2015 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 3/31/2015 | 3/31/2015 | 3/31/2015 | P | DONE |
Jason C. Taylor
|
|
|
|
Plan assigned to (PEP) | 3/31/2015 | 3/31/2015 | 3/31/2015 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (PW Hillside) | 3/31/2015 | 3/31/2015 | 3/31/2015 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Inspection Record Card- Bld | | | 3/31/2015 | | |
|
|
|
|
1st review completed | | | 3/31/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/31/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/31/2015 | | DONE |
|
|
|
|
Application received | | 3/31/2015 | | | |
|
|
|
|