Permit NumberBLD15-00981
StatusFinaled
Name SLETTEN CONSTRUCTION
Site Address 8300 W OVERLAND RD
Project NameWalmart Store 2508
Customer NumberBLD15-01207
ePlanReviewYes
Description
(WALMART) RACKING SUBMITTED UNDER BLD15-01207-Permit to paint Building exterior and interior; replace exterior signage(under separate permit);PLAN MODIFICATIONS -revise counters in training roo, revise 1 deli case, minor change to interior finish**ajs**10/09/15** limited interior remodel where shown on drawings; refurbish interior areas where shown on drawings. Interiro finish material shall meet IBC chapter 8. Deli, meat, cash center, vidion center, pharmacy, freezer, layway, auto service and other areas as noted. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  12/11/2015 DONE
called Stetton Construction-they are going to have RUI pull mechanical permit for the installation of the coolers. She is also going to pay for the fees due on MEC15-04045 (Mech-Masters).
I sent her incoives for both the building and mechanical permit so she could send them to the accounting dept.
(F) Reprint permit  12/11/2015 DONE
Print Statement  11/20/2015 DONE
Print Statement  11/20/2015 DONE
First Notice11/3/201511/3/201511/9/2015 DONE
DetailsMike Jordan
Mailed 11-10-15
BLD-Final11/3/201511/3/201511/3/2015PPASS
DetailsMike Jordan
Jerry Phone #: ###-####
DOC - Permit Finaled11/3/201511/3/201511/3/2015PPASS
DetailsMike Jordan
FIRE-Final Inspection11/2/201511/3/201511/3/2015APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection10/29/201510/29/201510/29/2015PCANC
DetailsTroy Cobbley
Jerry and I discussed requirements for the life safety.
BLD-Final10/28/201510/29/201510/29/2015ANR
DetailsMike Jordan
Jerry Phone #: ###-####. Needs electrical final and fire/life/safety final. Called jerry to advise.
BLD-Ceiling Grid Inspection10/19/201510/20/201510/20/2015APART
DetailsMike Jordan
Jerry Phone #: ###-####. Ceiling grid ok, pending electrical rough in inspection.
Issue PAID IN FULL permit  10/14/2015 DONE
Plan assigned to (AJS)9/30/20159/30/201510/9/2015 PASS
DetailsAdele J Schaffeld-Griffin
Plan Mod - ePlanReview - Wal-Mart
Routing - PLAN CHECK9/30/2015 10/9/2015 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  10/9/2015 DONE
Permit Ready to Issue  10/9/2015 DONE
plan mod fees- do NOT re-issue
BLD-Framing/Rough-in10/8/201510/8/201510/8/2015PPASS
DetailsMike Jordan
Jerry Phone #: ###-####. Interior steel stud walls for new storage room ok. Ok to one side only... pending electrical rough in inspection.
Routing - FIRE9/30/20159/30/201510/2/2015 PASS
DetailsScott Arellano
Report with modified scope of work attached to case. No changes in fire code requirements.
Plan Modification Accepted  9/30/2015 DONE
DetailsChristina Prado
Plan modification requested by Mary Bain to upload drawing for changes to deli case equipment and minor cabinetry updates
BLD-Ceiling Grid Inspection9/9/20159/10/20159/10/2015APART
DetailsMike Jordan
Jerry Phone #: ###-####. Ceiling grid in customer service area ok, pending fire sprinkler rough in.
BLD-Framing/Rough-in8/18/20158/19/20158/19/2015APASS
DetailsMike Jordan
Jerry Phone #: ###-####. Interior steel stud non bearing walls for cash room and new service desk area.
CHANGE STATUS TO (ISS)  8/18/2015 DONE
DetailsChristina Prado
plan mod approved, permit issued since no fees due
Plan assigned to (AJS)8/4/20158/4/20158/14/2015 PASS
DetailsAdele J Schaffeld-Griffin
Plan Mod - ePlanReview - Wal-Mart
Routing - PLAN CHECK8/14/2015 8/14/2015 PASS
DetailsAdele J Schaffeld-Griffin
Permit Ready to Issue  8/14/2015 DONE
all requirments met
Route to Impact Fee Review8/4/20158/7/20158/11/2015 PASS
DetailsStephanie Jensen
Routing - PLUMBING8/4/2015 8/7/2015 PASS
DetailsBill VanDegrift
Routing - PLAN CHECK8/4/2015 8/6/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - FIRE8/4/20158/4/20158/5/2015 PASS
DetailsScott Arellano
Resubmittal items reviewed for fire code. No new report required.
Plan Modification Accepted  8/5/2015 DONE
DetailsCarlos Velazquez
(8/4/15 PLAN MODIFICATION - Revised customer service area, money center, store pick-up, grocery refrigeration system, break room area, some sprinkler modifications in freezers/coolers, mechanical changes)
Routing - PUBLIC WORKS8/4/2015 8/5/2015 PASS
DetailsJennifer Bruner
CHANGE STATUS TO (ISS)  8/4/2015 DONE
Issue PAID IN FULL permit  7/1/2015 DONE
Inspection Record Card- Bld  7/1/2015 DONE
Meeting  6/15/2015 DONE
as per Adele and Rita ok to group both permits BLD15-00981 and BLD15-01207
Permit Ready to Issue  5/14/2015 DONE
***ALL REQUIREMENTS MET*** need GC and rev cert of val
Plan assigned to (AJS)4/22/20154/22/20155/13/2015 PASS
DetailsAdele J Schaffeld-Griffin
Due 5/19 Level 3 TI - ePlanReview - Walmart
1st review completed  5/13/2015 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/13/2015 DONE
Routing - PLAN CHECK4/22/2015 5/13/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - FIRE4/22/20154/22/20155/4/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Routing Off Site - C.D.H4/22/2015 4/30/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing PW Sewer Rating4/22/2015 4/30/2015 PASS
DetailsJennifer Bruner
signed off in e plan
Routing - PLUMBING4/22/2015 4/23/2015 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing4/22/2015 4/22/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS4/22/2015 4/22/2015 PASS
DetailsJennifer Bruner
Intake Approval  4/22/2015 PASS
DetailsSam Zahorka
Pending Assignment by JCB4/22/2015 4/22/2015 DONE
DetailsJason Blais
Routing - Design Review4/22/2015 4/22/2015 PASS
DetailsJosh Wilson
Ok per CZC15-00078
Intake Approval  4/1/2015 FAIL
DetailsSam Zahorka
Please provide the following information:

1. Please see the items circled in red on the submittal checklist.

2. Please provide form #304 Registered Design Professional Form.

3. Drawings sheet: (03060 A11 VCREF - Model & 03050 - MAC2 AUTOCENTER MECHANICAL DETAILS)are incomplete and missing information.

4. A separate racking permit is required. See application #516
http://pds.cityofboise.org/home/documents/apps/500/

If further assistance is needed please call me directly @ ###-####.

Thanks, Sam
Application received  3/31/2015 DONE