Telephone call | | | 12/11/2015 | | DONE |
|
|
|
called Stetton Construction-they are going to have RUI pull mechanical permit for the installation of the coolers. She is also going to pay for the fees due on MEC15-04045 (Mech-Masters).
I sent her incoives for both the building and mechanical permit so she could send them to the accounting dept.
|
(F) Reprint permit | | | 12/11/2015 | | DONE |
|
|
|
|
Print Statement | | | 11/20/2015 | | DONE |
|
|
|
|
Print Statement | | | 11/20/2015 | | DONE |
|
|
|
|
First Notice | 11/3/2015 | 11/3/2015 | 11/9/2015 | | DONE |
Mike Jordan
|
|
|
Mailed 11-10-15
|
BLD-Final | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Mike Jordan
|
|
|
Jerry Phone #: ###-####
|
DOC - Permit Finaled | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 | P | CANC |
Troy Cobbley
|
|
|
Jerry and I discussed requirements for the life safety.
|
BLD-Final | 10/28/2015 | 10/29/2015 | 10/29/2015 | A | NR |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Needs electrical final and fire/life/safety final. Called jerry to advise.
|
BLD-Ceiling Grid Inspection | 10/19/2015 | 10/20/2015 | 10/20/2015 | A | PART |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Ceiling grid ok, pending electrical rough in inspection.
|
Issue PAID IN FULL permit | | | 10/14/2015 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 9/30/2015 | 9/30/2015 | 10/9/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan Mod - ePlanReview - Wal-Mart
|
Routing - PLAN CHECK | 9/30/2015 | | 10/9/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/9/2015 | | DONE |
|
|
|
plan mod fees- do NOT re-issue
|
BLD-Framing/Rough-in | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Interior steel stud walls for new storage room ok. Ok to one side only... pending electrical rough in inspection.
|
Routing - FIRE | 9/30/2015 | 9/30/2015 | 10/2/2015 | | PASS |
Scott Arellano
|
|
|
Report with modified scope of work attached to case. No changes in fire code requirements.
|
Plan Modification Accepted | | | 9/30/2015 | | DONE |
Christina Prado
|
|
|
Plan modification requested by Mary Bain to upload drawing for changes to deli case equipment and minor cabinetry updates
|
BLD-Ceiling Grid Inspection | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PART |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Ceiling grid in customer service area ok, pending fire sprinkler rough in.
|
BLD-Framing/Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PASS |
Mike Jordan
|
|
|
Jerry Phone #: ###-####. Interior steel stud non bearing walls for cash room and new service desk area.
|
CHANGE STATUS TO (ISS) | | | 8/18/2015 | | DONE |
Christina Prado
|
|
|
plan mod approved, permit issued since no fees due
|
Plan assigned to (AJS) | 8/4/2015 | 8/4/2015 | 8/14/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan Mod - ePlanReview - Wal-Mart
|
Routing - PLAN CHECK | 8/14/2015 | | 8/14/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 8/14/2015 | | DONE |
|
|
|
all requirments met
|
Route to Impact Fee Review | 8/4/2015 | 8/7/2015 | 8/11/2015 | | PASS |
Stephanie Jensen
|
|
|
|
Routing - PLUMBING | 8/4/2015 | | 8/7/2015 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - PLAN CHECK | 8/4/2015 | | 8/6/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 8/4/2015 | 8/4/2015 | 8/5/2015 | | PASS |
Scott Arellano
|
|
|
Resubmittal items reviewed for fire code. No new report required.
|
Plan Modification Accepted | | | 8/5/2015 | | DONE |
Carlos Velazquez
|
|
|
(8/4/15 PLAN MODIFICATION - Revised customer service area, money center, store pick-up, grocery refrigeration system, break room area, some sprinkler modifications in freezers/coolers, mechanical changes)
|
Routing - PUBLIC WORKS | 8/4/2015 | | 8/5/2015 | | PASS |
Jennifer Bruner
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/4/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/1/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/1/2015 | | DONE |
|
|
|
|
Meeting | | | 6/15/2015 | | DONE |
|
|
|
as per Adele and Rita ok to group both permits BLD15-00981 and BLD15-01207
|
Permit Ready to Issue | | | 5/14/2015 | | DONE |
|
|
|
***ALL REQUIREMENTS MET*** need GC and rev cert of val
|
Plan assigned to (AJS) | 4/22/2015 | 4/22/2015 | 5/13/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Due 5/19 Level 3 TI - ePlanReview - Walmart
|
1st review completed | | | 5/13/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/22/2015 | | 5/13/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 4/22/2015 | 4/22/2015 | 5/4/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing Off Site - C.D.H | 4/22/2015 | | 4/30/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Rating | 4/22/2015 | | 4/30/2015 | | PASS |
Jennifer Bruner
|
|
|
signed off in e plan
|
Routing - PLUMBING | 4/22/2015 | | 4/23/2015 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 4/22/2015 | | 4/22/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 4/22/2015 | | 4/22/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 4/22/2015 | | PASS |
Sam Zahorka
|
|
|
|
Pending Assignment by JCB | 4/22/2015 | | 4/22/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - Design Review | 4/22/2015 | | 4/22/2015 | | PASS |
Josh Wilson
|
|
|
Ok per CZC15-00078
|
Intake Approval | | | 4/1/2015 | | FAIL |
Sam Zahorka
|
|
|
Please provide the following information:
1. Please see the items circled in red on the submittal checklist.
2. Please provide form #304 Registered Design Professional Form.
3. Drawings sheet: (03060 A11 VCREF - Model & 03050 - MAC2 AUTOCENTER MECHANICAL DETAILS)are incomplete and missing information.
4. A separate racking permit is required. See application #516
http://pds.cityofboise.org/home/documents/apps/500/
If further assistance is needed please call me directly @ ###-####.
Thanks, Sam
|
Application received | | | 3/31/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 31 2015 3:04PM
|