Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD15-00982
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 10 N LIBERTY ST Unit: 130
Project NameMark Guho Construction Company
Customer Number 
ePlanReviewYes
Description
(MARK GUHO CONSTRUCGTION COMPANY)(SUITE 130) This building was constructed under BLD00-02588 core and shell and BLD02-00013 for the vanilla finish. Minor demolitions per approved plans. This building is fully fire spinklered. Scope of work to include interior partition walls for new layout including 2 new ADA compliant restrooms. New reception counter shall meet ADA requirements. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  1/21/2016 DONE
Second Notice 12/20/20151/13/2016 DONE
Mailed 1-14-16
First Notice 12/3/201512/10/2015 DONE
mailed 12-11-15
BLD-Final11/20/201511/23/201511/23/2015APASS
DetailsMike Jordan
MJ Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  11/23/2015 DONE
FIRE-Final Inspection11/9/201511/9/201511/9/2015PPASS
DetailsTroy Cobbley
Life safety passed. Remove the thumb turn dead bolt (keyed is ok) from the main exit prior to a building inspection
FIRE-Final Inspection9/2/20159/3/20159/3/2015AFAIL
DetailsJim Page
Called phone number provided, ###-####, at 9:54am, no one answered, left message with contact information, no return call, inspection failed.
BLD-Framing/Rough-in5/22/20155/27/20155/27/2015APASS
DetailsMike Jordan
Early afternoon - MJ Phone #: ###-####. INterior steel stud framed walls for restroom demissing wall to create an additional restroom and knee wall in reception area.
BLD-Framing/Rough-in4/27/20154/27/20154/27/2015APART
DetailsMike Jordan
Mark Phone #: ###-####. Interior steel stud walls. Needs to provide all approved drawings.
Issue PAID IN FULL permit  4/15/2015 DONE
Print Occupancy Form  4/15/2015 DONE
Routing - FIRE4/8/20154/8/20154/14/2015 PASS
DetailsScott Arellano
Attached comments to plans.
Plan assigned to (AJS)4/1/20154/1/20154/14/2015 PASS
DetailsAdele J Schaffeld-Griffin
my reivew completed Mark Guho Corp Office
1st review completed  4/14/2015 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  4/14/2015 DONE
Permit Ready to Issue  4/14/2015 DONE
NEED GC form and Certificate of Value. MJ emailed documents 4-15-15
Routing - PLAN CHECK4/1/2015 4/8/2015 PASS
DetailsAdele J Schaffeld-Griffin
Routing - Addressing4/1/2015 4/2/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS4/1/2015 4/1/2015 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating4/1/2015 4/1/2015 PASS
DetailsBeverly Mountain
Intake Approval  4/1/2015 PASS
DetailsAdele J Schaffeld-Griffin
Application received  3/31/2015 DONE
Application submitted via PDS Online on Mar 31 2015 3:22PM