BLD-Final | 9/28/2015 | 9/29/2015 | 9/29/2015 | P | PASS |
Dave Hannah
|
|
|
Brian Phone #: ###-####
|
DOC - Permit Finaled | 9/29/2015 | 9/29/2015 | 9/29/2015 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 9/29/2015 | 9/29/2015 | 9/29/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Framing/Rough-in | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | CANC |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Wall Bracing | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Energy code compliance | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 7/30/2015 | 7/31/2015 | 7/31/2015 | P | PART |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch. portal frame in dinning room. OK to insulate.
|
BLD-Wall Bracing | 7/30/2015 | 7/31/2015 | 7/31/2015 | P | FAIL |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch. portal framing dinning room back wall.
|
PubWorks Subgrade Approval | 6/9/2015 | 6/9/2015 | 6/9/2015 | | DONE |
Jason C. Taylor
|
|
|
*** ISOLATED FOUNDATION PADS NORTH OF RESIDENCE ONLY***30" FROST DEPTH***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 5/15/2015 | 5/18/2015 | 5/18/2015 | A | PASS |
Phil Shearer
|
|
|
Wall; Eric Phone #: ###-####
|
BLD-Footing | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Footing | 5/8/2015 | 5/11/2015 | 5/11/2015 | A | NR |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
PubWorks Subgrade Approval | 5/1/2015 | 5/1/2015 | 5/1/2015 | | DONE |
Jason C. Taylor
|
|
|
* ENTIRE RESIDENCE AND GARAGE_ NO EXTERIOR COLUMNS - 30" FROST DEPTH***A letter from the applicant’s geotechnical engineer indicating that the footingsubgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 4/23/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/21/2015 | | |
|
|
|
|
Print Occupancy Form | | | 4/21/2015 | | DONE |
|
|
|
|
Telephone call | | | 4/21/2015 | | DONE |
|
|
|
called Doug to let know permit is ready and how much is owed-left message on his phone
|
Plan resubmittals received | | | 4/21/2015 | | DONE |
|
|
|
received two copies of sheet S-101- gave to Tisha
|
Routing - PLAN CHECK | 4/21/2015 | | 4/21/2015 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/21/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/21/2015 | | DONE |
|
|
|
requirements met
|
Plan assigned to (LEG) Tisha | 4/13/2015 | | 4/21/2015 | | DONE |
Tisha Gallop
|
|
|
1st review 4/15, plan check
|
Routing - PLAN CHECK | 4/17/2015 | | 4/20/2015 | | FAIL |
Tisha Gallop
|
|
|
need calcs for pad footings
|
Plan resubmittals received | | | 4/17/2015 | | DONE |
|
|
|
received 2 copies engineering sheets and 2 copies of sheets A-104, A-102, A-103, A-201, A-202, S-103, S-108, S-101, S-105, S-106, S-107- gave to Tisha
|
Routing - PLAN CHECK | 4/10/2015 | | 4/15/2015 | | PASS |
Tisha Gallop
|
|
|
e-mailed plan review report to Doug Lasher
|
1st review completed | | | 4/15/2015 | | FAIL |
|
|
|
plan check
|
Telephone call | | | 4/14/2015 | | DONE |
Tisha Gallop
|
|
|
called Doug Lasher, told him need structrual calcs to complete review.
|
Plan resubmittals received | | | 4/14/2015 | | DONE |
|
|
|
Received two sets of revised foundation calcs; Plans taken to LEG for review
|
Plan assigned to (JG) | 4/1/2015 | 4/1/2015 | 4/13/2015 | | DEFR |
Javier Guzman
|
|
|
4/17 F L2 Hillside**
|
Routing - FIRE | 4/6/2015 | | 4/10/2015 | | PASS |
Scott Arellano
|
|
|
Plans are approved as shown.
|
Routing - MECHANICAL | 4/3/2015 | | 4/6/2015 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 4/6/2015 | | 4/6/2015 | | PASS |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION AND APPROVAL REQUIRED PRIOR TO EARTH DISTURBANCE
WUI Zone A, Class A Roof, Permit for the construction of a new 4428 sq. ft., 2 story (first story 2214 sq. ft, basement 2214 sq. ft.) Single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 968 sq. ft. of covered patio/porch and a 1117 sq. ft. attached garage CON03-00172
|
Routing PW Grading-Hillside | 4/1/2015 | | 4/3/2015 | | PASS |
Jason C. Taylor
|
|
|
***30" FROST DEPTH****A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLANNING | 4/3/2015 | | 4/3/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 4/1/2015 | | 4/3/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 4/3/2015 | | 4/3/2015 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/1/2015 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/1/2015 | | DONE |
|
|
|
|
Intake Approval | | | 4/1/2015 | | PASS |
|
|
|
|
Application received | | 4/1/2015 | | | |
|
|
|
|