Permit Information
Permit NumberBLD15-01070
StatusFinaled
Name HC COMPANY INC
Site Address 11311 W CHINDEN BLVD
Project NameHewlett Parckard bld2 lower
Customer Number 
ePlanReviewNo
Description
(HEWLETT PACKARD – BUILDING #2 – 1ST STORY) The fire sprinkler system is used for building area increase. To construct a 305 square foot equipment room and two 94 square foot focus rooms. Work is to include interior nonbearing walls, interior doors and tempered glass sidelights, suspended acoustical ceilings, gypsum board soffits, and finishes. Additional cooling will be installed to serve the equipment room to remove excessive heat generated by computer servers. If the racks exceed 8 feet tall, a separate racking permit is required. The equipment room is NOT approved as a battery room. The existing UPS system that will serve the equipment is provided elsewhere in the building. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The structural analysis of the existing floor to verify its ability to support the added dead load of equipment is a deferred submittal item. The structural design for strengthening the floor to support the added dead load, if that is required, is also a deferred submittal item. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing - PLAN CHECK4/7/2015 4/15/2025 PASS
DetailsCarl Westfall
Second Notice 7/19/20157/14/2015 DONE
This permit finaled on the web by Jeff Tonkin
First Notice 6/27/20157/9/2015 DONE
Mailed 7-10-15
First Notice 6/27/20157/9/2015 DONE
BLD-Final6/17/20156/17/20156/17/2015PPASS
DetailsJim Sly
OK for perm occ.
BLD-Final6/16/20156/17/20156/17/2015APASS
DetailsJim Sly
Jason Phone #: ###-####
DOC - Permit Finaled6/17/20156/17/20156/17/2015PPASS
DetailsJim Sly
Permanent Occupancy  6/17/2015 DONE
Print Occupancy Form  6/17/2015 DONE
Permanent Occupancy  6/17/2015 DONE
FIRE-Final Inspection6/16/20156/16/20156/16/2015PPASS
DetailsTroy Cobbley
life safety passed
BLD-Ceiling Grid Inspection5/7/20155/8/20155/8/2015APASS
DetailsJim Sly
Jason Phone #: ###-####
BLD-Framing/Rough-in4/16/20154/16/20154/16/2015PPASS
DetailsJim Sly
Jason Phone #: ###-####
Issue PAID IN FULL permit  4/16/2015 DONE
Plan assigned to (CJW)4/7/2015 4/15/2015 PASS
DetailsCarl Westfall
HEWLETT PACKARD - Level 2 - (7 days - April 15)
1st review completed  4/15/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/15/2015 DONE
Permit Ready to Issue  4/15/2015 DONE
All requirements met-GC form is attached to permit app
Print Occupancy Form  4/15/2015 DONE
Application received 4/7/20154/7/2015  
Plans ACCEPTED BY PLAN TECH  4/7/2015 DONE
Recd Pcfee & Taken To Pln CK  4/7/2015 DONE
Intake Approval  4/7/2015 PASS