BLD-Final | 8/20/2015 | 8/21/2015 | 8/21/2015 | A | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguisher with current inspection tag mounted between 5' and 4"
|
BLD-Final | 8/14/2015 | 8/17/2015 | 8/17/2015 | A | NR |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Needs fire/life/safety final first. Called and left Dave a message.
|
BLD-Framing/Rough-in | 7/17/2015 | 7/20/2015 | 7/20/2015 | A | PASS |
Mike Jordan
|
|
|
Craig Phone #: ###-####
|
BLD-Footing | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PASS |
Mike Jordan
|
|
|
Craig Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/26/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 6/22/2015 | | |
|
|
|
|
Plan assigned to (CDM) | | 4/24/2015 | 6/22/2015 | | PASS |
Carl D Madsen
|
|
|
New building due 5/24
|
Print Occupancy Form | | | 6/22/2015 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2015 | | DONE |
|
|
|
called GC- left message that permit is ready for pick up, fees due, need GC form and letter or receipt for ACHD
|
Plan resubmittals received | | | 6/22/2015 | | DONE |
|
|
|
Letter from Cleary building (David Danial) stating that a 4" concrete floor will be added to the interior of the building to comply with accessibility provisions of the code. CDM 6-22-2015
|
Routing - PLAN CHECK | 6/22/2015 | | 6/22/2015 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/22/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/22/2015 | | DONE |
|
|
|
Need ACHD letter or receipt, RP and GC form---- RP is met
6-22-15 KRS
|
Routing - Design Review | 6/12/2015 | | 6/12/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Erosion and Sediment | 6/12/2015 | | 6/12/2015 | | CANC |
Evan Jenkins
|
|
|
No Review Needed. Already Approved plan on 5-27-15
|
Routing - PLAN CHECK | 6/2/2015 | | 6/12/2015 | | FAIL |
Carl D Madsen
|
|
|
The acessible route through the building has not been addressed. E-Mailed applicant.6-12-15 10:25 AM
|
Plan resubmittals received | | | 6/5/2015 | | DONE |
|
|
|
received two sets of; plot plan(1), elevations(2), floor plan(3), typical section(4), diaphragm action details(5)
|
Route to Impact Fee Review | 6/2/2015 | 6/5/2015 | 6/3/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 5/27/2015 | 4/24/2015 | 6/2/2015 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
1st review completed | | | 6/2/2015 | | FAIL |
|
|
|
Failed DR & Plan Check
|
Routing - Erosion and Sediment | 5/26/2015 | | 5/27/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(HORIZON EQUIPMENT) Permit for the construction of a new 1,725 sq. ft. storage building of type VB construction with steel siding and roofing materials. This building is not fire sprinklered.
|
Routing - PLAN CHECK | | | 5/26/2015 | | FAIL |
Carl D Madsen
|
|
|
E-mailed plan review report David Daniel. 5-26-15
|
Plan resubmittals received | | | 5/19/2015 | | DONE |
|
|
|
received 4 copies of site plan- put on CDM's desk
|
Routing - Design Review | 4/28/2015 | | 4/30/2015 | | FAIL |
Andrea Tuning
|
|
|
DRH15-00107 - The applicant should submit a site plan that shows the location of the building.
|
Routing - PUBLIC WORKS | 4/27/2015 | | 4/28/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Drainage | 4/27/2015 | | 4/28/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 4/24/2015 | | 4/27/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING Land Div | 4/24/2015 | | 4/24/2015 | | PASS |
Dave Abo
|
|
|
Lot 1, Block 3 of Trustmark Subdivision
|
Plans ACCEPTED BY PLAN TECH | | | 4/24/2015 | | DONE |
|
|
|
|
Intake Approval | | | 4/24/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/24/2015 | | DONE |
|
|
|
|
Application received | | 4/8/2015 | | | |
|
|
|
|